Americas Headquarters Cisco Systems, In c. 170 West Tasman Drive San Jose, CA 951 34-1706 USA http://www.ci sco.com Tel: 408 526-4000 800 553-NETS (638 7) Fax: 408 527-0883 Catal yst 2960-S S witc h H.
THE SPECIFICATION S AND INFORMATION REGARDING TH E PRODUCTS IN THIS MANUAL ARE SUBJECT TO CHANGE WITH OUT NOTICE. ALL STATEMENTS , INFORMATION, AND RECOMMENDATI ONS IN THI S MANUAL ARE BE LIEVED TO BE A CCURATE BUT ARE PRESENTED WI THOUT WARRANTY OF ANY KIND, EX PRESS OR IMPLIED.
iii Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 CONTENTS Preface vii Related Publication s viii Obtaining Documentation and Submitting a Serv ice Request viii CHAPTER 1 Product Over.
Contents iv Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Box Contents 2-4 Tools and Equipment 2-4 Verifying Switch Operation 2-5 Planning a Switch Stack 2-5 Stack Guidelines 2-5 Ins.
Contents v Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 Link Status 3-2 10/100 or 10/100/1000 Port Connections 3-3 10/100 or 10/100/1000 PoE Port Co nnections 3-3 SFP and SFP+ Modu l.
Contents vi Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Entering the In itial Configuration In formation C-6 IP Settings C-6 Completing the Setup Program C-6 I NDEX.
vii Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 Preface This guide is for the n etworking or computer technician in stalling the Catalyst 2960-S swi tch. It documents the physical char acteristics of the switch, ex plains ho w to install the switch, and provides troubleshooting i nformation.
viii Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Preface Related Publications These documents pro vide information about t he switch and are av ailable from these Cisco.com sites: http://www .cisco.co m/en/US/products/ps64 06/tsd_products_support _series_home.
CH A P T E R 1-1 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 1 Product Overview The Catalyst 2960-S fa mily of switches, also referred to as the switch , are Ethernet switches to w.
1-2 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overview Front Pan el Front Panel The 24- and 48-port swi tch front panels include the 10/ 100 or the 10/100/100 0.
1-3 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overvie w Front Panel Figur e 1 -2 Catalyst 2960S -48TS-L F r ont P anel Figur e 1 -3 Catalys t 2960S-48 TS-S F ro nt P anel 1. Port numbering is from left to right, with port 1 on the far l eft.
1-4 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overview Front Pan el Figur e 1 -4 Catalyst 2960S-F48FPS-L Front P anel Catalyst 2960-S Series 11X 2X 1X 23X 24X 2.
1-5 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overvie w Front Panel 10/100 PoE+ Ports The ports provide PoE+ support for de vices complian t with IEEE 802.3af, IEEE 802.3at, and ePoE and also provi de Cisco prestandard PoE support fo r Cisco IP Phones and Cisco Aironet Access Points.
1-6 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overview Front Pan el • T otal po wer budget can be allocated among the ports On a per-port basis, you control whether or not a port automatically pro vides po wer when an IP phone or an access point is connected.
1-7 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overvie w Front Panel Management Ports • Ethernet management port • RJ-45 console port (EIA/TIA-232) • USB m.
1-8 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overview Front Pan el USB Type A Port The USB T ype A interface provides access to extern al USB FLASH de vices (also known as thumb dri ves or USB keys). The interface supports Cisco USB flash driv es with capacities from 64 MB to 1 GB.
1-9 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overvie w Front Panel Ta b l e 1-2 lists the switches that support the SFP modules.
1-10 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overview Front Pan el For information about SFP modules, see the SFP module documentation and the “Ins talling SFP and SFP+ Modules” se ction on page 2-20 . Fo r cable specifications, see Appe ndix B, “Connector and Cable Specif ications.
1-11 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overvie w Front Panel LEDs Y ou can use the switch LEDs t o monitor switch acti vity and its performance. Figure 1-7 sho ws the switch LEDs and the Mode b utton that you use to select a port mo de.
1-12 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overview Front Pan el For information on th e System LED colors during po wer -on self-test (POST), see the “Switch POST Results” section on page 3-1 .
1-13 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overvie w Front Panel T o select or change a mode, press the Mod e button un til the desired mode is highli ghted. When you change port modes, the meanings of the port LED colors also change.
1-14 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overview Front Pan el If your switches are stacked and you press the Mode butt on on any switch, all th e switches display the same selected mode.
1-15 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overvie w Front Panel Stack LED The stack LED shows the sequence of member switches in a stack. U p to four switches can be members of a stack. The first four port LED s sho w the switch member number .
1-16 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overview Front Pan el Console LEDs The console LEDs show which console port is in use. Figur e 1 -9 Console LEDs If you connect a cable to a co nsole port, the sw itch automatically uses that port for console communication.
1-17 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overvie w Rear Panel Ethernet Management Port LED Rear Panel The rear panel of the stac king-capable switches have a Fle xStack module slot, a fan ex haust, and an A C power connector .
1-18 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overview Rear Panel Figur e 1 -1 1 Catalyst 2960-S S witch Rear P anel with Stacking Module Slot and without RPS connector The rear panel of the nonstacking- capable switches ha ve a fan exhaus t, and an A C po wer connector .
1-19 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overvie w Rear Panel Figur e 1 -13 Catalyst 2960-S S witc h Rear P anel without an RPS connect or FlexStack Ports The stacking-capable switch models support stacki ng wi th the option al stack ki t.
1-20 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overview Management Options The Cisco RPS 2300 has two ou tput le vels: –52 V and 12 V with a total maximum out put po wer of 2300 W. All supported and connected swit ches can simulta neously commun icate with the RPS 2300.
1-21 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overvie w Management Options • CiscoV iew applicatio n The CiscoV iew de vice-management ap plication displays the switch ima ge that you can use to vie w switch status and performance informat ion and set conf iguration parameters.
1-22 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 1 Product Overview Management Options.
CH A P T E R 2-1 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 2 Switch Installation Read these topics and perform the procedures in this order: • Preparing, page 2-1 • Planning .
2-2 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installatio n Preparing War ni ng Ethernet cables must be shielded when used in a cen tral office environment. Statement 171 War ni ng If a redundant power sy stem (RPS) is not connected to the switch, install an RPS connector cover on the back of the swit ch.
2-3 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installation Preparing War ni n g Only trained and qualified personn el should be allowed to install, replac e, or service this equipment. Statement 1030 War ni n g Ultimate disposal of this product should be handled according to all national laws and regulations.
2-4 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installatio n Preparing Installation Guidelines When determining where to install th e switc h, verify that these guidelines are met: • Clearance to the switch front and rear panel meets these conditions: – Front-panel LEDs can be easily read.
2-5 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installation Planning a Switc h Stack Verifying Switch Operation Before you install the switch in a r ack, on a wall, or on a table or shelf, po wer on the switch and verify that it passes POST .
2-6 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installatio n Planning a Switch Stack – CAB-STK-E-0.5M= (0.5-meter cable) – CAB-STK-E-1M= (1-meter cable) – CAB-STK-E-3M= (3-meter cable) • Access to the switch rear panel and to the rear of the rack.
2-7 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installation Planning a Switc h Stack Installing the FlexStack Module Step 1 Use a flat-blade scre wdriv er to remov e the FlexSt ack module blank cov er on the switch back panel.
2-8 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installatio n Planning a Switch Stack Stack Cabling Figure 2-5 and Figure 2-6 sho w the switches stacked in a vertical rack or on a table . The connections ar e redundant.
2-9 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installation Planning a Switc h Stack Figur e 2-7 Stack with Half Bandwidth Connecti ons Figure 2-8 sho ws a stack with a bad FlexSt ack cable in link B. This stack pro vides only half bandwidth and does not ha ve redund ant connections.
2-10 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installatio n Installing the Switch Power-On Sequence for Switch Stacks Consider these guidelines befo re you po wer on the switches in a stack: • The sequence in which the switches are f irst po were d on might af fect the switch that becomes the stack master .
2-11 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installation Installing the Switch Figur e 2-1 0 Rack-Mounting Brack ets Attaching the Rack -Mount Brackets T o rack-mount the switch, first remove the screws from the switch chassis so that the mounting brackets can be attached.
2-12 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installatio n Installing the Switch Use four Phillips flat-head screws to attach the long side of the bracket to each side of the switch ( Figure 2-12 ).
2-13 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installation Installing the Switch Mounting in a Rack After the brackets are attached, use the four supplied Phillips machine scre ws to attach the brack ets to the rack ( Figure 2-13 ).
2-14 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installatio n Installing the Switch Wall-Mounting • Attaching the Brackets for W all-Mounting, page 2-14 • Att.
2-15 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installation Installing the Switch Attaching the RPS Connector Cover Note The Catalyst 2960S-F48FPS-L, 29 60S-F48LPS-L, 2960S-F24PS-L, 2960S-F48TS-L, 2960S-F24TS-L, 2960S-F48TS-S, and 2960S-F24 TS-S switches do not have an RPS connector and a cover is not needed.
2-16 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installatio n Installing the Switch Mounting on a Wall For the best sup port of the switch and cables, mak e sure that the switch is attached securely to w all studs or to a firmly attached plywoo d-mounting bac kboard.
2-17 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installation Connecting the FlexStac k Cables Table- or Shelf-Mounting T o install th e switch on a table or shelf, locate the adhesi v e strip with the rubber f eet in the mounting-kit en velope.
2-18 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installatio n Installing the Po wer Cord Retain er (Optional) Step 2 Insert one end of the Fle x Stack cable into the stack port of the f irst switch. Insert the other end of the cable into the stack port on the other switch.
2-19 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installation Installing the Power Cord Retainer (Optional) Step 3 Slide the retainer throu gh the first l atch. See Figure 2-19 . Figur e 2-19 Sliding the Retain er Through the Latc h Step 4 Slide the retainer throu gh the other latches to lock it.
2-20 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installatio n Installing SFP and SFP+ Modules Figur e 2-21 Sleeve Ar ound the Po wer Cord Step 6 Secure the A C po wer cord by pressing on the retainer . See Figure 2-22 .
2-21 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installation Installing SFP and SFP+ M odules Installing an SFP or SFP+ Module When installing SFP or SFP+ modules.
2-22 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installatio n Connecting to SFP and SFP+ Modules Step 3 Insert a dust plug into the optical ports of the SFP or SFP+ modul e to keep the optical interfaces cl ean. Step 4 If the module has a bale-clasp latch, pull the bale out and down t o eject the module.
2-23 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installation Connecting to SFP and SFP+ Modules Figur e 2-24 Connecting t o a Fiber -Optic SFP Module P ort Step 3 Insert the other cable end into a fiber- opt ic receptacle on a targ et de vice.
2-24 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installatio n 10/100 and 10/100/1000 PoE+ Port Connections Figur e 2-25 Connecting t o a 1 0 0 0BASE-T SFP Module Step 2 Connect the other end of the cabl e to an RJ-45 connector on the other d evice.
2-25 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installation 10/100 and 10/100/1000 PoE+ Port Connect ions War ni n g V oltages that present a shoc k hazard may exist on Power over Ethernet (Po E) circuits if interconnections are m ade using uninsulated expo sed metal contacts, cond uctors, or terminals.
2-26 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 2 Switch Installatio n 10/100 and 10/100/1000 Port Connections 10/100 and 10/100/1000 Port Connections The switch 10/100 an d 10/100/1000 port co nfigurat ion changes to operate at t h e speed of the attached de vice.
CH A P T E R 3-1 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 3 Troubleshooting • Diagnosing Problems, page 3- 1 • Clearing the Switch IP Ad dress and Conf iguration, page 3-5 .
3-2 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 3 Tro ubleshooting Diagnosing Prob lems Switch Connections Bad or Damaged Cable Always e xamine the cable for marginal damage or fa ilure.
3-3 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 3 Troubleshooting Diagnosing Problems 10/100 or 10/100/1000 Port Connections A port appears to malfun ction: • Use the Mode bu tton to sho w the status for all ports. See Ta b l e 1-8 and Ta b l e 1-9 for descriptions of the LEDs and their meanings.
3-4 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 3 Tro ubleshooting Diagnosing Prob lems Ping End Device Ping from the directly conn ected switch first, and then w ork your way back port by port, interf ace by interface, trun k by tr unk, until you f ind the source of the connecti vity issue.
3-5 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 3 Troubleshooting Clearing the Switch IP Addre ss and Configuration Cabling Distance If the port statistics sho w excessi ve.
3-6 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 3 Tro ubleshooting Finding the Swit ch Serial Number Figur e 3-2 Ser ial Number Location for the Cataly st 2960S-48TD-L, 296.
3-7 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 3 Troubleshooting Finding the Switch Serial Number Figur e 3-5 Ser ial Number Location for the Catalyst 2960S-F48TS-S, and 2.
3-8 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 3 Tro ubleshooting Finding the Swit ch Serial Number Figur e 3-7 Ser ial Number Location for the C2960S-F -ST ACK Module 333.
3-9 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 3 Troubleshooting Replacing a Failed Stack Member Replacing a Failed Stack Member 1. Get a replacement sw itch that has the sa me model number as the fail ed switch. 2. Po wer do wn the fail ed switch.
3-10 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Chapter 3 Tro ubleshooting Replacing a Failed Stack Me mber.
A-1 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 APPENDIX A Technical Specifications Ta b l e A -1 Envir onmental Specifications f or All Catalyst 2960-S S w itc hes Environmental R.
A-2 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Appendix A Technical Specific ations Ta b l e A -2 Cata lyst 2960S-48FPD-L, 2 960S-48LP D-L, 2960S-24PD-L, 296 0S-48FPS-L, 2960S-F48.
A-3 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 Appendix A Technical Specifications Physical Dimensions W eight 13 lb (5.89 kg) (Catal yst 2960S-48FPD-L) 12.5 lb (5.66 kg) (Cat alyst 2960S-48LPD-L) 12.5 lb (5.66 kg) (Cat alyst 2960S-24PD-L) 13 lb (5.
A-4 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Appendix A Technical Specific ations Ta b l e A -3 C atalyst 2960S-48TD -L, 2960S-24TD-L, 296 0S-48TS-L, 2960S-F48 TS-L, 2960S-24TS-.
A-5 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 Appendix A Technical Specifications Physical Dimensions W eight Dimensions (H x D x W) 9.5 lb (4.30 kg) (Catal yst 2960S-48TD-L, Catalyst 2960S-24TD-L, 29 60S-48TS-S, and 2960 S-F48TS-S) 10.
A-6 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Appendix A Technical Specific ations.
B-1 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 APPENDIX B Connector and Cab le Specifications Connector Specifications • 10/100 Ports (Includin g PoE), page B-1 • 10/100/1000 .
B-2 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Appendix B Connec tor and Cable Specific ations Connector Specifications 10/100/1000 Ports (Including PoE) All the 10/100/1000 po rts use standard RJ-45 connectors an d Ethernet pinouts.
B-3 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 Appendix B Connector and Cable Specifications Cables and Adapters Figur e B-5 Coppe r SFP Module RJ -45 Connector Cables and Adapters.
B-4 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Appendix B Connec tor and Cable Specific ations Cables and Adapters 1000B ASE-SX (GLC-SX-MM) 850 MMF 62.
B-5 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 Appendix B Connector and Cable Specifications Cables and Adapters Cable Pinouts Figur e B-6 Four T wist ed-P air Straight-Thr ough Cabl e Sc h ematic Figur e B-7 Four T wist ed-P air Crossov er Cable Sc hematic Figur e B-8 T wo T w isted-P air Straight-Through Cabl e Sche matic 4.
B-6 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Appendix B Connec tor and Cable Specific ations Cables and Adapters Figur e B-9 T wo T wisted-Pair Cr ossov er Cable Schematic Figur e B-1 0 Identifying a Crosso ver Cable Console Port Adapter Pinouts The RS-232 console port uses an 8-pin RJ-45 connect or.
B-7 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 Appendix B Connector and Cable Specifications Cables and Adapters Ta b l e B-3 Console Por t Signaling with a DB-25 A dapter Switch C.
B-8 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Appendix B Connec tor and Cable Specific ations Cables and Adapters.
C-1 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 APPENDIX C Configuring the Switch with the CLI-Based Setup Program This appendix pro vides a CLI-based setup procedure for a Catalyst 2960- S standalone switch or a switch stack.
C-2 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Appendix C Config uring the Switch with the CLI-Based Setup Program Accessing the CLI Throug h the Console Port Connecting the RJ-45.
C-3 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 Appendix C Configuring the Switch with the CLI-Based Setup Pro gram Accessing the CLI Through the Console Port Step 3 Config ure the .
C-4 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Appendix C Config uring the Switch with the CLI-Based Setup Program Accessing the CLI Throug h the Console Port Installing the Cisco Microsoft Windows 2000 USB Driver Step 1 Obtain the f ile Cisco_usbconsole_dri ver .
C-5 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 Appendix C Configuring the Switch with the CLI-Based Setup Pro gram Accessing the CLI Through the Console Port Uninstalling the Cisco.
C-6 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Appendix C Config uring the Switch with the CLI-Based Setup Program Entering the Initial Con figuration Information Entering the Ini.
C-7 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 Appendix C Configuring the Switch with the CLI-Based Setup Pro gram Entering the Initial Configuration Information Step 4 Enter an enable passwor d, and press Return . Enter enable password: enable_password Step 5 Enter a virtual terminal ( T elnet) password, and p ress Return .
C-8 Catalyst 2960-S Switch Hard ware Installation Guide OL-19732-04 Appendix C Config uring the Switch with the CLI-Based Setup Program Entering the Initial Con figuration Information ! interface GigabitEthernet1/0/23 ! end Step 10 These choices appear: [0] Go to the IOS command prompt without saving this config.
IN-1 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 INDEX Numerics 10/100/1000 Po E ports numbering 1-3, 1-4 pinouts B-2 recommended cables 2-25 10/100/1000 p orts cabling 1-6 connecti.
Index IN-2 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 to SFP and SFP+ modules 2-22 to 2-24 connection procedures 2-20 to 2-25 connectors and cables B-1 to ??, B-2 to B-7 console po.
Index IN-3 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 L LEDs color meanings 1-13 console 1-16 duplex 1-12 front panel 1-11 interpreting 1-13 master 1-12 PoE 1-13 port 1-12 to 1-15 .
Index IN-4 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 POST LEDs 2-5, 3-1 results 2-5 running at po wer on 2-5 power AC power outle t 1-20 connecting to 2-5 connectors 1-17 power co.
Index IN-5 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04 telco rac ks 2-13 Telnet, and a ccessing the CLI 1-20 temperat ure, operat ing A-1 troubleshooting bad or dam aged cable 3-2 c.
Index IN-6 Catalyst 2960-S Switch Hardware Installation Guide OL-19732-04.
Een belangrijk punt na aankoop van elk apparaat Cisco Systems 2960S-24TS-S (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen Cisco Systems 2960S-24TS-S heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens Cisco Systems 2960S-24TS-S vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding Cisco Systems 2960S-24TS-S leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over Cisco Systems 2960S-24TS-S krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van Cisco Systems 2960S-24TS-S bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de Cisco Systems 2960S-24TS-S kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met Cisco Systems 2960S-24TS-S . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.