Gebruiksaanwijzing /service van het product PVE21 van de fabrikant Eaton Electrical
Ga naar pagina of 33
M-2854-S Released 8/1/90 Overhaul Manual PVE V ariable Pump 12–21 USgpm capacity at 1800 rpm Vickers ® Piston Pumps.
2 T able of Contents Section Page I. Introduction 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A. Purpose of Manual 3 . . . . .
3 Section I – Introduction A. Purpose Of Manual This manual describes operational characteristics and overhaul information for the PVE12, 19(*) and the PVE21(*) – ** variable displacement piston pumps. The information contained herein pertains to the latest design series as listed in T able 1.
4 C-10 – CG-10 – CV -10 – CVP-12 – CVPC-12 – Pressure compensated (PVE19, 250-3000 psi) (PVE21, 250-2700 psi) Remote control pressure compensator adjustable from 350-3000 psi using and external relief valve.
5 Figure 1. Sectional Views of the PVE Pumps Drive Shaft PVE19 Section View PVE12 Section View Housing Rotating Group T apered Roller Bearing Y oke W afer Plate Compensator Y oke Housing Compensator V.
6 Section II – Description A. General Assembly of a typical pump package is shown in Figure 1. Six types of compensator subassemblies are used with the PVE series pumps. Refer to Section III for principles of operation. See Model Code for pressure settings.
7 Section III – Principles of Operation A. Piston Pump Rotation of the pump drive shaft causes the cylinder block, shoe plate and pistons to rotate. See Figure 2. The piston shoes are held against the yoke face by the shoe plate. The angle of the yoke face imparts a reciprocating motion to each piston within the cylinder block.
8 Figure 3. Flat Cut-Off Compensator Compensator Spring Drain Pump Load Cross Hole (Open to Spring Area) Compensator Spool Y oke Stroking Piston Rotating Group Y oke Spring Inlet Outlet D.
9 Figure 4. Load Sensing Compensator (CV). Compensator Spring Drain Compensator Spool Y oke Stroking Piston Rotating Group Y oke Spring Inlet Outlet Actuator Load External V alve Spool Orifice ( n P-Pressure Drop) Relief V alve Circuit Operation At Minimum Pressure Refer to Figure 4 during the following description.
10 External V alve Spool Orifice Size Increased If the external valve spool orifice size is increased, pump outlet pressure will decrease, lowering force against the compensator spool. (See Figure 4.) The compensator spring causes the spool to move, opening the yoke stroking piston to case drain.
11 Figure 5. Load Sensing Pressure Limiting Compensator (CVP , CVPC, CVPD) Compensator Spring Drain Compensator Spool Y oke Stroking Piston Rotating Group Y oke Spring Inlet Outlet Actuator Load Exter.
12 Section IV – Installation and Operating Instructions A. Installation Drawings The installation drawing listed in T able 2 will show installation dimensions and port locations. B. Mounting and Drive Connections CAUTION Pump shafts are designed to be installed in couplings with a slip fit.
13 Sound Level Noise is only indirectly affected by the fluid selection, but the condition of the fluid is of paramount importance in obtaining optimum reduction of system sound levels. Some of the major factors affecting the fluid conditions that cause the loudest noises in a hydraulic system are: 1.
14 Section V – Service and Maintenance A. Service T ools The following standard tools for overhauling the piston pump are shown in Figure 8. Standard T ools and Equipment: 1. T orque wrench with short extension and sockets 2. 1 ” micrometer 3. 1 ” depth micrometer 4.
15 Figure 8. Standard T ools. 1 2 3 4 5 6 Figure 9. Special Shaft Bearing Removal and Installation T ools. 1.232 1.500 “ A ” Use for “ A ” Intermediate shaft bearing installation Drive shaft bearing installation Drive shaft bearing removal 4 ” 6 ” 9 ” 1 1/2 ” heavy wall tubing .
16 Figure 1 1. Special Bearing Race Installation T ools. “ C ”“ B ” “ A ” .375 Nominal Pipe Size ABC 1 1/2 ” 4 ” 1.625 1.900 2 ” 4 ” 2.125 2.375 Schedule 80 (extra heavy) .005 Figure 12. Shaft Seal Driver . Aluminum ring Heavy wall tubing Press ring on end of tubing.
17 G. T roubleshooting T able 3 lists the common difficulties experienced with piston pumps and hydraulic systems. It also indicates probable causes and remedies for each of the troubles listed.
18 Section VI – Overhaul A. General CAUTION Before breaking a circuit connection, make certain that power is off and system pressure has been released. Lower all vertical cylinders, discharge accumulators, and block any load whose movement could generate pressure.
19 55 54 53 52 51 50 49 27 30 60 59 58 57 34 35 36 45 55 54 53 52 51 50 49 27 33 72 23 71 70 44 42 40 34 37 35 31 29 26 25 43 41 39 38 36 28 32 64 65 66 69 74 68 67 Figure 13. PVE19/21 Exploded View Refer to Service Drawings for assembly instructions and torque values.
20 Figure & Index No. Units per Assembly Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 4 1 1 1 1 1 1 1 1.
21 4 5 6 7 8 9 10 1 24 3 2 72 56 57 58 59 60 61 62 30 25 55 54 53 52 51 50 49 46 47 48 44 45 27 55 54 53 52 51 50 49 Figure 13. PVE19/21 Exploded View.
22 63 9 10 8 7 5 12 1 18 17 16 15 14 13 4 11 19 23 24 3 2 21 20 22 69 68 67 71 70 73 26 29 31 66 43 42 41 40 39 34 38 37 36 35 33 28 32 65 64.
23 3. Inspect spring (8) and (16) for wear and parallelism. Spring ends must be parallel. Replace if spring is warped or wear is evident. 4. Inspect seat (9) for wear in the area of spool contact. 5. Inspect spool (10) for excessive wear , galling, scratches, etc.
24 Figure 14. Cylinder bloc k subassembly disassembly tool. (T ighten nut, remove snap ring, loosen nut to relieve spring tens ion). Figure 14a. Cylinder Block Subassembly parts. F . Inspection Repair and Replacement 1. Check bearing (32) for scoring or brinelling of the rollers (PVE 19/21).
25 NOTE If shims (51) were destroyed during disassembly , a yoke bearing preload adjustment must be made at assembly . c. Slide the yoke from side to side to loosen the yoke bearing races (54) within the housing. The races are a normal slip fit but may be tight.
26 Figure 16. Removal of Front Bearing Race. Figure 17. Front Bearing Removal. Shaft Seal 1 1/2 ” heavy wall tubing 6 ” long. See Figure 1 1. Arbor Press Here Retaining Ring Figure 18. Front Bearing Installation. Shoulder 1 1/2 ” heavy wall tubing 6 ” long.
27 a. Assemble pintle bearings (55) on each end of the yoke and insert bearing races (54). b. Install bearing spacer (53) at one pintle end. c. Install O-Ring (52) against spacer (53) into the groove, then install a 0.010 inch shim (51) under pintle cover (50).
28 H. Disassembly of V alve Block 1. Do not disassemble check valve parts (64) through (66), unless action of the valve indicates a problem. Check the valve action with a pencil or a screwdriver . Press the check valve in against the spring, it should return and hold firm against the seat.
29 2. Install pipe plug (69) into valve block (26) and secure. 3. Assemble a new O — Ring (68) on hex plug (67) and thread plug into place. K. Shaft Bearing Preload Adjustment (PVE 19/21 only) NOTE .
30 Section VII – T est Procedure A. T est Conditions FLUID MEDIUM: SAE 10W meeting API service classification MS or equivalent. FLUID TEMPERA TURE: 120 ° F ± 5 ° F at pump outlet. Fluid entering the pump must be maintained below a maximum contamination limit of class four according to NAS1638.
31 F . Performance T est of PVE 12/19/21 Piston Pump with “ CG ” Compensator Control 1. Operate pump at 1200 RPM. Set remote control valve to minimum pressure setting. 2. Refer to Figure 23 and adjust load valve (1) and globe valve (1) to 100 PSI system pressure at P1.
32 G. Performance T est of PVE 12/19/21 Piston Pump with “ CV ” , “ CVP ” , “ CVPC ” and “ CVPD ” Compensator Control NOTE Refer to Figure 24 for location of circuit components. 1. Open load valve one (1) and turn compensator adjust - ment plug clockw ise until seated.
33 Model Compensator Pressure Setting Psig T able 9. Load sensing compensator adjustment range. Lockwire Standby Pressure P2 P @ USgpm (P2-P1) P @ Compensator Cracking Pressure (P2-P1) PVE19*-*-**-CV .
Een belangrijk punt na aankoop van elk apparaat Eaton Electrical PVE21 (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen Eaton Electrical PVE21 heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens Eaton Electrical PVE21 vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding Eaton Electrical PVE21 leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over Eaton Electrical PVE21 krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van Eaton Electrical PVE21 bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de Eaton Electrical PVE21 kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met Eaton Electrical PVE21 . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.