Gebruiksaanwijzing /service van het product RHINO 2409 van de fabrikant Alamo
Ga naar pagina of 106
© 201 1 Alamo Group Inc. $0.00 2409 Published 01/1 1 Part No. F-3644C OPERA T OR’S MANUAL RHINO ® 1020 S. Sangamon A ve. Gibson City , IL 60936 800-446-5158 Email: parts@servis-rhino.com LOADER This Operator' s Manual is an integral p art of th e safe operation of this machine an d must be maint ained with the un it at all times.
T o the Owner/Operator/Dealer All implement s with moving part s are potentially ha zardous . There is no subs titute for a c autious , safe-minded operator who recognizes the potential hazards and follows reason able safety practices.
T ABLE OF CONTENTS SAFETY SECTION ........ ................................................. .......................................... ........... 1- 1 General Safety Instructions and Practic es .......... ................ ................ ..........
Troubleshooting Guide .......... ................. ............. ................ ................ ............. ................ .... ...................... ...... 4-44 MAINTENANCE SECTION ................. ...........................................
Safety Section 1-1 SAFETY SECTION.
SAFETY 2409 01/11 Safety Section 1-2 © 201 1 Alamo Group Inc. SAFETY General Safety Instruct ions and Practices A careful operator is the best opera tor .
SAFETY 2409 01/11 Safety Section 1 -3 © 201 1 Alamo G roup Inc. SAFETY Never allow children to operate, ri de on, or come close to the T ractor or Implement.
SAFETY 2409 01/11 Safety Section 1-4 © 201 1 Alam o Group Inc. SAFETY Operator Safety Inst ructions and Practices Never operate the T ractor or Implement until you h ave read and completely under stand th is Manual, the T ractor Operator ’s Manual, an d each of the Safety Messages found in the Manual or on the T ractor and Implement.
SAFETY 2409 01/11 Safety Section 1 -5 © 201 1 Alamo G roup Inc. SAFETY Equipment Operation Safety Instructions and Practices Prolonged oper ation may cause ope rator bor edom and fa tigue affe cting safe operation. T ake scheduled work breaks to help prev ent these p otentially impaire d operating conditions.
SAFETY 2409 01/11 Safety Section 1-6 © 201 1 Alam o Group Inc. SAFETY Never grasp control levers wh en mounting the machine. (SBH-4) The Boom is designed only to position and operat e the Bucket which is attached to it. Never attempt to lift, pull, or push ot her solid object s with the boom or bucket.
SAFETY 2409 01/11 Safety Section 1 -7 © 201 1 Alamo G roup Inc. SAFETY Do Not operate this eq uipment in areas where in sects such as bees may att ack you and/or cause you to lose contro l of the equip ment. If you must enter in such areas, use a tractor with an enclosed Cab and close the windows to pr event insects fr om entering.
SAFETY 2409 01/11 Safety Section 1-8 © 201 1 Alam o Group Inc. SAFETY Do not let the lo ader or att achment cont act electrical power line s. Conta ct with electrical power lines can result in serious injur y or electrocution. If the loader attach ment contact s a power line remain in the tractor seat until the power has been shu t off.
SAFETY 2409 01/11 Safety Section 1 -9 © 201 1 Alamo G roup Inc. SAFETY Do not use an attachmen t that is not securely atta ched to the quick hitch, The attachment could fall r esu lting in severe crushing injuries or death to the operat or or bystander s.
SAFETY 2409 01 /11 Safety Section 1-10 © 201 1 Alam o Group Inc. SAFETY Know before you DIG . Call 88 8-258-0808 and reques t that all buried utilities locations be identified before digging in un familiar ground. Do not let the loader or attachment contact buried electrical power lines, ut ilities or gas lines.
SAFETY 2409 01/11 Safety Section 1-11 © 201 1 Alamo G roup Inc. SAFETY Be particu larly careful in transport. The Implement has r aised and moved the center of gravity to the front of the Power Unit increasing the poss ibility of overtu rn and tipping forward.
SAFETY 2409 01 /11 Safety Section 1-12 © 201 1 Alam o Group Inc. SAFETY Connecting or Disconnecting Im plement Safety Instructions and Practices Do not stand or allow byst ander or coworkers between the loader and the tractor while installing or disconnecting the loader from the tractor .
SAFETY 2409 01/11 Safety Section 1-13 © 201 1 Alamo G roup Inc. SAFETY T ransporting Safety Instructions and Practices T ransport only at speeds where you can maint ain control of the equipment. Seriou s accident s and injuries ca n result from operating this equipment at high sp eeds.
SAFETY 2409 01 /11 Safety Section 1-14 © 201 1 Alam o Group Inc. SAFETY Maintenance and Service Saf ety Instructions and Practices Lower the loader to th e bed of the truck or tra iler when transporting the tractor and loader with a truck. Measure to ensure the tr ansport height does not exceed the legal limit s.
SAFETY 2409 01/11 Safety Section 1-15 © 201 1 Alamo G roup Inc. SAFETY Do not modify or alter this Implement. Do not permit an yone to modify or alter this Implement, any of its compone nts or any Implem ent functio n.
SAFETY 2409 01 /11 Safety Section 1-16 © 201 1 Alam o Group Inc. SAFETY Avoid contact with hot surfaces inclu ding hydraulic oil t anks, pumps, motors, valves and hose connections. Relieve hydr aulic pressure before performing maintenance or repairs.
SAFETY 2409 01/11 Safety Section 1-17 © 201 1 Alamo G roup Inc. SAFETY S torage and Parking Safety Instructions and Practices Concluding Safety Instr uctions and Practices Never crawl under or allow childr en to play ar ound or on a loader that is disconnected fro m the tractor .
SAFETY 2409 01 /11 Safety Section 1-18 © 201 1 Alam o Group Inc. SAFETY Decal Location NOTE: Rhino supplies safety decals on this product to promote safe op eration.
SAFETY 2409 01/11 Safety Section 1-19 © 201 1 Alamo G roup Inc. SAFETY ITEM P ART NO. QTY LEVEL DESCRIPTION 1. 49696 1 LOGO Rhino, Left 2. 51448 1 LOGO Rhino, Right 3. 49724 2 MODEL 2409 4. 52740 2 W ARNING Oil Leaks 5. 52203 1 W ARNING Lock V alve in Transport 6.
SAFETY 2409 01 /11 Safety Section 1-20 © 201 1 Alam o Group Inc. SAFETY Decal Location Rhino, Le ft P/N 49696 Rhino, Right P/N 51448 MODEL NAME: 2409 P/N 49724.
SAFETY 2409 01/11 Safety Section 1-21 © 201 1 Alamo G roup Inc. SAFETY W A RNING! - DO NOT operate with oil leaks. -Inspect hoses regularly . Failure to inspect and replace worn hoses may allow th em to rupture suddenly and violently , resulting in serious bodily inju ry or death from scalding, fire burn injury , or oil penetration.
SAFETY 2409 01 /11 Safety Section 1-22 © 201 1 Alam o Group Inc. SAFETY Loader Safety -Read, understand and follow the operation, warning , and safety instruction s in the Operator ’s Manual. -Equip tractor with ROPS (Ro ll Over Protection System) before installing or operati ng the loader .
SAFETY 2409 01/11 Safety Section 1-23 © 201 1 Alamo G roup Inc. SAFETY DANGER! - Use ROPS and seatbelt at all times. Add recommende d rear ballast. Operate tr actor at low speeds. Failure to comp ly may result in serious injury or death. D470 Slow Moving V ehicle Decal.
SAFETY 2409 01 /11 Safety Section 1-24 © 201 1 Alam o Group Inc. SAFETY W AR NING! - Crushing Hazard. -T o A v oid Serious Injury or Death Make sure attachment is securely attached to the loader . See Operat or ’s Ma nual for inst ructions. -Lock both levers down.
SAFETY 2409 01/11 Safety Section 1-25 © 201 1 Alamo G roup Inc. SAFETY Federal Laws and Re gulations This section is intended to explain in broad terms the conc ept and effect of federal laws and regulations concern ing employer and employee eq uipment operators.
.
Introduction Section 2-1 INTRODUCTION SECTION.
INTRODUCTION 2409 01/11 Introduction Section 2-2 © 201 1 Alam o Group Inc. INTRODUCTION This 2409 Loader is des igned with care and built with quality materials by skilled workers. Proper assembly , maintenance, and ope rating practices, as described in this manual, will help t he owner/operator get years of satisfactory service from the machine.
INTRODUCTION 2409 01/11 Introduction Section 2-3 © 201 1 Alamo Group Inc. INTRODUCTION DO NOT use drugs or alc ohol immediately befo re or while operating the T ractor and Implement. Drugs and alcohol w ill affect an operator ’s alertness and coordination and theref ore af fect the operator ’s ability to operate the eq uipment safely .
INTRODUCTION 2409 01/11 Introduction Section 2-4 © 201 1 Alam o Group Inc. INTRODUCTION The RHINO 2409 L oader is designed fo r four-wheel drive tractors. They are intended to lif t only loose materials that will fit in the bucket. All cylinders are double-acti ng.
INTRODUCTION 2409 01/11 Introduction Section 2-5 © 201 1 Alamo Group Inc. INTRODUCTION Attention Owner/Operator BEFORE OPERA TING THIS MACHINE: 1. Carefully read the Operator’s Manual, completely understa nd the Safety Messages and instructions, and know how to operate correctly both the tractor and implement.
.
Assembly Section 3-1 ASSEMBL Y AND CONNECTING THE LOADER SECTION.
ASSEMBLY 2409 01/11 Assembly Section 3-2 © 201 1 Alam o Group Inc. ASSEMBL Y Assembly Instructions T o avoid injury during installation of the load er attachment, do not allo w bystanders with in 10 feet of load er or attachment . Always wear safety glasses when removing or installing buckets.
ASSEMBLY 2409 01/11 Assembly Section 3-3 © 201 1 Alam o Group Inc. ASSEMBL Y Do not use an attachmen t that is not securely atta ched to the quick hitch, The attachment could fall r esu lting in severe crushing injuries or death to the operat or or bystander s.
ASSEMBLY 2409 01/11 Assembly Section 3-4 © 201 1 Alam o Group Inc. ASSEMBL Y Proper Ballasting and Wheel Sp acing S pread fro nt wheels to maximum distance. S pread rear wheels to maximum dis tance. Add rear wheel weight, rea r ballast box or implement.
ASSEMBLY 2409 01/11 Assembly Section 3-5 © 201 1 Alam o Group Inc. ASSEMBL Y Dismounting Loader and Mo unting Loader to T ractor Dismounting Loader T o avoid injury during installation of loader: • Place loader bucket against barrie r to restrict forward movemen t of loader .
ASSEMBLY 2409 01/11 Assembly Section 3-6 © 201 1 Alam o Group Inc. ASSEMBL Y Mounting Loader Mounting is basically reve rse of dismo unting. 1. Slowly drive tractor up to loader until hoses will reach from loader to tractor . Engage tractor brak es and shut off tra ctor engine.
ASSEMBLY 2409 01/11 Assembly Section 3-7 © 201 1 Alam o Group Inc. ASSEMBL Y Assembling Quick Att ach Device Quick att ach device can be inst alle d using tools ordina rily available. T orque all hardware to specifications listed in loader operator ’s manual.
ASSEMBLY 2409 01/11 Assembly Section 3-8 © 201 1 Alam o Group Inc. ASSEMBL Y Inst alling Quick Attach Device Always use a drift and hammer made of non-sparking mate rial (a shot-filled mallet is recommended) to inst all or remove pins. A steel hammer or drif t could generate flying meta l fragments and result in injury .
ASSEMBLY 2409 01/11 Assembly Section 3-9 © 201 1 Alam o Group Inc. ASSEMBL Y When Connecting an Att achment to the Loader Quick Hitch 1. Be sure both quick hitch pin levers are in the unlocked position, with th e levers pointing up.
ASSEMBLY 2409 01/11 Assembly Section 3-10 © 201 1 Alam o Group Inc. ASSEMBL Y 5. On level g round, tilt the attachment down 90 degrees and lower it to the ground. Lower the lo ader further to slightly raise the front of th e tractor of the tractor off the ground.
Operation Section 4-1 OPERA TION SECTION.
OPERATION 2409 01/11 Operation Section 4-2 © 201 1 Alam o Group Inc. OPERA TION RHINO 2409 LOADER OPERA TION INSTRUCTIONS Y our 2409 Load er should now be assembled and insp ected for a ny evidence of defective or damaged pa rts before use. Any evidence of damage sh ould be reported to your dealer imme diately .
OPERATION 2409 01/11 Operation Section 4-3 © 201 1 Alam o Group Inc. OPERA TION 1. S t andard Equipment and Specifications S pecifications will vary w ith tire si ze, hydraulic system and bucket used.
OPERATION 2409 01/11 Operation Section 4-4 © 201 1 Alam o Group Inc. OPERA TION 2. Operator Requirement s DO NOT use drugs or alc ohol immediately befo re or while operating the T ractor and Implement.
OPERATION 2409 01/11 Operation Section 4-5 © 201 1 Alam o Group Inc. OPERA TION Always read carefully and comply fully with the manufacturer ’ s instructions when handling oil, solvents, cleanser s, and any other chemical agent. (SG-22) Never run the T ractor engine in a closed building or without adequate ventilation.
OPERATION 2409 01/11 Operation Section 4-6 © 201 1 Alam o Group Inc. OPERA TION Repeated or subst antial breathing of hazardous dusts, in cluding crystalline silica, could ca use fatal or serious respiratory disease including silicosis. Concrete, maso nry , many types of rock, and various other materials contain silica sand.
OPERATION 2409 01/11 Operation Section 4-7 © 201 1 Alam o Group Inc. OPERA TION 3. T ractor Requirement s T ractor Requirement s and Cap abilities • ASABE approved Roll-Over Protective S tru cture (ROP S) or RO PS cab and seat belt. • T ractor Safety Devices .
OPERATION 2409 01/11 Operation Section 4-8 © 201 1 Alam o Group Inc. OPERA TION 3.3 T ractor Ballast Before operating tractor an d loader , add sufficient co unterweight so a minimu m of 25% of the total weight is on the rear axle . T otal weight include s weight of: tractor , loader , rated load i n bucket, and counterweigh t.
OPERATION 2409 01/11 Operation Section 4-9 © 201 1 Alam o Group Inc. OPERA TION 4. Getting On and Off the T ractor 4.1 Boarding the T ractor 4.2 Dismounting the T ractor Do not mou nt or dismount the Tractor while the tractor is moving. Mo unt the T ractor only when the T ractor and all moving parts ar e completelystopped.
OPERATION 2409 01/11 Ope ration Section 4-10 © 201 1 Alam o Group Inc. OPERA TION 5. St arting the T ractor Before dismoun ting the tractor and loader lowe r the loader to the ground or onto solid support blocks.
OPERATION 2409 01/11 Ope ration Section 4-11 © 201 1 Alam o Group Inc. OPERA TION The operator must h ave a complete underst anding of t he placement, function, and opera tional use of all tractor controls before sta rting the tractor .
OPERATION 2409 01/11 Ope ration Section 4-12 © 201 1 Alam o Group Inc. OPERA TION 6. Pre-Operation Inspection and Service Periodically inspect all moving part s for wear and replace whe n necessary with au thorized service part s. Look for loose fasteners, worn or broken p arts, and leaky or loose fittings.
OPERATION 2409 01/11 Ope ration Section 4-13 © 201 1 Alam o Group Inc. OPERA TION 6.2 Loader Pre-Operation Inspection and Service 6.1 T ractor Pre-Operation Inspection/Service Refer to the tr actor operator’s manual to ensure a complete pre-operation inspection and scheduled service is performed accordi ng to the manufacturers recommenda tions.
OPERATION 2409 01/11 Ope ration Section 4-14 © 201 1 Alam o Group Inc. OPERA TION Before operation, a complete inspection and ser vice is required to ensur e the loader is in a good a nd safe working condition. Damaged and/or broken part s should be repa ired and/or replaced imme diately .
OPERATION 2409 01/11 Ope ration Section 4-15 © 201 1 Alam o Group Inc. OPERA TION LOADER BOOM ASSEMBL Y • Inspect condition of each arm section weldment • Ensure all pins are in place. • Ensure all bo lts and screws are prop erly installed. • Check condition of bushings at boom pivot points.
OPERATION 2409 01/11 Ope ration Section 4-16 © 201 1 Alam o Group Inc. OPERA TION T ractor PRE-OPERA TION Inspection T ractor ID#______________________ Make____________________ Date__________________.
OPERATION 2409 01/11 Ope ration Section 4-17 © 201 1 Alam o Group Inc. OPERA TION FRONT END LOADER PRE- OPERA TION Inspection Front End Loader ID#_______________Make____________________ Date_________.
OPERATION 2409 01/11 Ope ration Section 4-18 © 201 1 Alam o Group Inc. OPERA TION 7. Driving the T ractor and Loader This Implemen t may be wider than the T ractor .
OPERATION 2409 01/11 Ope ration Section 4-19 © 201 1 Alam o Group Inc. OPERA TION Safe tractor transport requ ires the operator possess a thorough knowledge o f the model being op erated and precautions to t ake while driving with an attached imp lem ent.
OPERATION 2409 01/11 Ope ration Section 4-20 © 201 1 Alam o Group Inc. OPERA TION 8. Operating the T ractor and Loader Do not attempt to lift loads in excess of loader cap acity . Operating loader on a hillside is dangerous. Extreme care is recommended.
OPERATION 2409 01/11 Ope ration Section 4-21 © 201 1 Alam o Group Inc. OPERA TION Do Not operate this eq uipment in areas where in sects such as bees may att ack you and/or cause you to lose contro l of the equip ment. If you must enter in such areas, use a tractor with an enclosed Cab and close the windows to pr event insects fr om entering.
OPERATION 2409 01/11 Ope ration Section 4-22 © 201 1 Alam o Group Inc. OPERA TION Do not use an attachmen t that is not securely atta ched to the quick hitch, The attachment could fall r esu lting in severe crushing injuries or death to the operat or or bystander s.
OPERATION 2409 01/11 Ope ration Section 4-23 © 201 1 Alam o Group Inc. OPERA TION Know before you DIG . Call 88 8-258-0808 and reques t that all buried utilities locations be identified before digging in un familiar ground. Do not let the loader or attachment contact buried electrical power lines, ut ilities or gas lines.
OPERATION 2409 01/11 Ope ration Section 4-24 © 201 1 Alam o Group Inc. OPERA TION Always have a heavy att achment, such as a bu cket mounted on loader when it is removed from tractor . It is importan t not to put excessive weig ht on parking stands with lift cylinder retr action.
OPERATION 2409 01/11 Ope ration Section 4-25 © 201 1 Alam o Group Inc. OPERA TION 8.1 Operating the Loader The following text and illustrati ons offer suggested loader an d tractor operating techniques. FILLING THE BUCKET Approach and enter th e pile with a level bucket.
OPERATION 2409 01/11 Ope ration Section 4-26 © 201 1 Alam o Group Inc. OPERA TION Lift and roll back of bucket will increase efficiency because... A level bucket throughout the lif ting cycle resists bucket lift and increa ses breakaway ef f ort. NOTE: Do not be concerned if the bucket is not completely fille d during each pass.
OPERATION 2409 01/11 Ope ration Section 4-27 © 201 1 Alam o Group Inc. OPERA TION LIFTING THE LOAD When lifting th e load, keep the bucket positioned to avoid spillage. Loader has mechanical self leveling of attachment in both raise and lower cy cle.
OPERATION 2409 01/11 Ope ration Section 4-28 © 201 1 Alam o Group Inc. OPERA TION Use extreme care when ope rating loader on a slope, keep bucket as low as possible. This keep s center of gravity low and will provide maximum stability . When transpor ting the load, ke ep bucket as low a s possible, to avoid tipping, in case a wheel drops in a rut.
OPERATION 2409 01/11 Ope ration Section 4-29 © 201 1 Alam o Group Inc. OPERA TION DUMPING THE BUCKET Lift bucket high enough to clear sid e of vehicle. Move tractor in as close as possible to side of vehicle, then dump bucket. LOWERING THE BUCKET After bucke t is dumped, back away fro m vehicle while lowering and rolling back bucket.
OPERATION 2409 01/11 Ope ration Section 4-30 © 201 1 Alam o Group Inc. OPERA TION OPERA TING WITH FLOA T CONTROL During hard surf ace operation, keep bucket level and put lift contro l in float position to permit bucket to float on workin g surface. If hy draulic down pressure is exerted on bucket, it will wear faster than normal.
OPERATION 2409 01/11 Ope ration Section 4-31 © 201 1 Alam o Group Inc. OPERA TION LOADING FROM A BANK Choose a forward gear that pr ovides sufficient ground speed for loading. Exercise caution when un dercutting high ba nks. Dirt slides can be dangerous.
OPERATION 2409 01/11 Ope ration Section 4-32 © 201 1 Alam o Group Inc. OPERA TION Another method for large dirt piles is to build a ramp approach to the pile. It is important to keep the bucket level when approaching a bank or pile. This will help prevent gouging the work ar ea.
OPERATION 2409 01/11 Ope ration Section 4-33 © 201 1 Alam o Group Inc. OPERA TION PEELING AND SCRAPING Use a slight bucket angle, travel forward and hold lift control forward to st art the cut. Make a short 5 to 8 foot angle cut and break out cleanly .
OPERATION 2409 01/11 Ope ration Section 4-34 © 201 1 Alam o Group Inc. OPERA TION LOADING LOW TRUCKS OR SPREADE RS FROM A PILE For faster load ing, minimize angle of turn and length of run between pile and spreader . Back grade occasionally with a loaded bucket to keep working surface free of rut s and holes.
OPERATION 2409 01/11 Ope ration Section 4-35 © 201 1 Alam o Group Inc. OPERA TION BACKFILLING Approach pile wit h a level bucket. Poor methods actually move no more dirt and make it more diff icult to hold a level grade. Do not use bucket in dumped position for bulldozing.
OPERATION 2409 01/11 Ope ration Section 4-36 © 201 1 Alam o Group Inc. OPERA TION Leave dirt in bucket. Dumping o n each pass wastes time. Operate tractor at righ t angles to ditch.
OPERATION 2409 01/11 Ope ration Section 4-37 © 201 1 Alam o Group Inc. OPERA TION Leave dirt which drif ts over side of bucket for final cleanup. Pile dirt on high side for easier backfilling on a slope.
OPERATION 2409 01/11 Ope ration Section 4-38 © 201 1 Alam o Group Inc. OPERA TION 8.2 Operating Bale Spear Operate the bale spear using extreme caution. Sharp point s on bale spear can cause serious injur y or death. Because of size and we ight of large bales, e xtreme care must be t aken in handling them.
OPERATION 2409 01/11 Ope ration Section 4-39 © 201 1 Alam o Group Inc. OPERA TION Carry bales as low to th e ground as possible to allow maximum visibility and avoid tipping.
OPERATION 2409 01/11 Ope ration Section 4-40 © 201 1 Alam o Group Inc. OPERA TION T ransport only at speeds where you can maint ain control of the equipment.
OPERATION 2409 01/11 Ope ration Section 4-41 © 201 1 Alam o Group Inc. OPERA TION 10.1 T ransporting on Public Roadways Inherent hazards of operating the tr actor and implement and the possibilit y of accidents are not left behind when you finish work ing in an area.
OPERATION 2409 01/11 Ope ration Section 4-42 © 201 1 Alam o Group Inc. OPERA TION Extreme caution should be used wh en transporting the tractor and imp lement on public roadways.
OPERATION 2409 01/11 Ope ration Section 4-43 © 201 1 Alam o Group Inc. OPERA TION 10.2 Hauling the T r actor and Implement Before transporting a loade d tractor and imple ment, measure the height and width dimensions and gross weight of the complete loaded unit.
OPERATION 2409 01/11 Ope ration Section 4-44 © 201 1 Alam o Group Inc. OPERA TION 1 1. T roubleshooting Guide TROUBLE POSSIBLE CAUSE POSSIBLE REMEDY Loader slow or will not lif t Hydraulic oil too heav y . Change to proper oil. and/or dump Oil filter plugged.
OPERATION 2409 01/11 Ope ration Section 4-45 © 201 1 Alam o Group Inc. OPERA TION PROBLEM POSSIBLE CAUSE REMEDY Insufficie nt lift cap acity Load is greater than boom Check loa der specifications. lif t cap acity . Improper hydraulic pump Repair or replace pump.
.
Maintenanc e Section 5-1 MAINTENANCE SECTION.
MAINTENANCE 2409 01 /11 Maintenance Se ction 5-2 © 201 1 Alam o Group Inc. MAINTENANCE READ, UNDERST AND, and FOLLOW the following Safety Messag es. Serious injury or death may occur unless care is t aken to follow the warnings and instructions st ated in the Safety Messages.
MAINTENANCE 2409 01 /11 Maintenance Se ction 5-3 © 201 1 Alam o Group Inc. MAINTENANCE NEVER perform maintenance benea th a raised loader unless lo ader is properly supported to prevent accident al lowering. Do Not fill fuel tank while engine is running.
MAINTENANCE 2409 01 /11 Maintenance Se ction 5-4 © 201 1 Alam o Group Inc. MAINTENANCE Lubrication Schedule Before operating your Loader , take the time to inspect a nd re pair any damag e to the machine or tractor .
MAINTENANCE 2409 01 /11 Maintenance Se ction 5-5 © 201 1 Alam o Group Inc. MAINTENANCE Daily Maintenance Regular maintenance of your loader and hydraulic system will insure maximum load er efficiency and long life. 1. Check fluid level of tracto r hydraulic system be fore starting each day’s operation .
MAINTENANCE 2409 01 /11 Maintenance Se ction 5-6 © 201 1 Alam o Group Inc. MAINTENANCE Cylinder Service Loader cylinders are designed to be re liable and easy to service.
MAINTENANCE 2409 01 /11 Maintenance Se ction 5-7 © 201 1 Alam o Group Inc. MAINTENANCE Lif t and Bucket Cylind er Reassembly Note: Be careful not to damage seals and o-rings on e dges or holes in cylinde r tube. Inspect and remove b urrs and sharp edges if necessary befo re reassembly .
MAINTENANCE 2409 01 /11 Maintenance Se ction 5-8 © 201 1 Alam o Group Inc. MAINTENANCE 1. S tore loader with att achment securely attached . 2. Place dust caps on hydraulic quick couple rs. 3. Do not remove attachment from stored loader . 4. Do not allow children to play on or ar ound loader .
MAINTENANCE 2409 01 /11 Maintenance Se ction 5-9 © 201 1 Alam o Group Inc. MAINTENANCE Proper T orque for Fasteners The chart lists the corre ct tightening torque for fa stener s.
MAINTENANCE 2409 01/11 Maintenance Section 5-10 © 201 1 Alam o Group Inc. MAINTENANCE.
MAINTENANCE 2409 01/11 Maintenance Section 5-11 © 201 1 Alam o Group Inc. MAINTENANCE.
RHINO LIMITED W ARRANTY 1. LIMITED W ARRANTIES 1.01. Rhino warrants for one year from the purchase date to the original non-commercial, governmental, or municipal purchaser (“Purchaser”) and warra.
T O THE OWNER/OPERA T OR/DEALER T o keep your implement running ef ficiently and safely , read your manual thor oughly and follow these dire ctions and the Safety Messages in this Manual. T he T able of Contents clearly ident ifies each sect ion where you ca n easily find the informa tion you need.
2409-SOM-01/1 1 P/N F-3644C Printed U.S.A 2409 LOADER.
Een belangrijk punt na aankoop van elk apparaat Alamo RHINO 2409 (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen Alamo RHINO 2409 heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens Alamo RHINO 2409 vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding Alamo RHINO 2409 leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over Alamo RHINO 2409 krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van Alamo RHINO 2409 bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de Alamo RHINO 2409 kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met Alamo RHINO 2409 . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.