Gebruiksaanwijzing /service van het product AT-X210-9GT van de fabrikant Allied Telesis
Ga naar pagina of 66
613-001769 Rev A AT-x210-24GT AT-x210-16GT AT-x210-9GT Gigabit Ethernet Switches Installation Guide 1357 2468 91 1 1 3 1 5 R 10 12 14 16R 17 19 21 23R 18 20 22 24R A T -x210-24GT Gigabit Ethernet Swit.
Copyright © 2013 Allied Telesis, Inc. All rights reserved. No part of this publicati on may be repr o duced without prior w ritten permission from Al lied Telesis, Inc. Allied Telesis and the Allied Telesis logo are trademarks of Allied Telesis, Incorp orated.
i Electrical Safety and Emissions S tandards This product meets the following standards. RFI Emissions EN 55022:2010 EN 61000-3-2:2006+A1:2009+A2:2009 EN 61000-3-3:2008 EN 62233:2008 EN 6231 1:2008 FC.
ii T ranslated Safety Statements Important: The indicates that a translation of th e safety statement is available in a PDF document titled Translated Safety State ments posted on the Allied Telesis website at www.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide iii Contents Preface ...... ................ ............. ................ ............. ................ ............. ................ ............. ..... ..... ..............
Contents iv.
v Figur e s Figure 1: AT-x210-9GT, AT-x210-16G T, and AT-x210-24GT packaging ........................... ....................... .............. ........... ... 8 Figure 2: AT-x210-9GT, AT-x210-16 GT, an d AT-x210-24GT Front Panels ....................
List of Figures vi.
vii Ta b l e s Table 1. AT-x210-9GT POWER LED Functional Descripti ons ........................ ................ .................... .......... . ................... 13 Table 2. AT-x210-16GT and AT-x210- 24GT FAULT LED Functiona l Description s ... .
List of Tables viii.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 1 Pr eface This guide contains the installat ion instructions for the AT-x210-9GT, AT- x210-16GT, and AT-x210-24GT Gigabit Ethe rnet Switches.
2 Symbol Conventions This document uses the following conventions: Note Notes provide additional informatio n. Caution Cautions inform you t hat performing or omitting a specific actio n may result in equipment damage or loss of data. Warning Warnings inform you that performing or omitting a sp ecific action may result in bodily injury.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 3 Contacting Allied Telesis If you need assistance with this prod uct, you may contact Allied Telesis technical support by going to the Suppo rt & Services section of the Allied Telesis web site at www.
4.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 5 Chapter 1 Overview This chapter provides des criptions of the AT-x2 10-9GT, AT-x210-16GT, and AT-x210-24GT Gigabit Ethernet S.
Chapter 1: Ove rview 6 Features Here are the hardware featu res of the AT-x210-9GT, AT-x210-16GT and AT-x210-24GT Gigabit Ethernet Switches. Twisted Pair Ports Here are the basic features of the 10 /100/1000 Mbps twisted-pair ports: 9, 16, or 24 ports per switch 10Base-T (IEEE 802.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 7 LEDs Here is a brief description of the port LEDs: Power LED/Fault/Standby LEDs; refer to “POW ER/FAULT/ STANDBY LEDs” on page 13 . Speed and link/activity LEDs for the twisted pair ports; see “10Base-T/100Base-TX/1000 Ba se-T Link Activity LEDs” on page 15 .
Chapter 1: Ove rview 8 Package Contents Figure 1 illustrates the package contents for the AT-x210-9GT, AT-x210-16GT, and AT-x210 -24GT Gigabit Ethernet Switches.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 9 Front and Back Panels Figure 2 illustrates the front panels of the AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Gigabit Ethernet Switches.
Chapter 1: Ove rview 10 Figure 3 illustrates the MODE LED toggle button on the front panel of the of the AT-x210-9GT and AT-x210-16 GT Gigabit Ethernet Switches.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 11 Management Software The switches are shipped with the management software pre-installed. The software provides a command line interf ace and a GUI (Graphical User Interface) for in-band, over-the -network management.
Chapter 1: Ove rview 12 Twisted Pair Ports The AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Layer 2 Gigabit Ethernet Switches feature 9, 16, and 24 twisted pair ports, respectively. All ports are 10Base-T, 100Base-TX, and 1000Base-T compliant. You can set the port speeds and dup lex modes either automatically with IEEE 802.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 13 LEDs There are four types of LEDs on the AT-x210 switch es: “POWER/FAULT/STANDBY LEDs” on page 13 “10Base-T/10.
Chapter 1: Ove rview 14 Figure 6. FAULT LED on AT-x210-9GT Table 2 describes the functions for the F AULT LED for the AT-x210-9GT and AT-x210-16GT switches.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 15 10Base-T/ 100Base-TX/1000 Base-T Link Activity LEDs The Link Activity (L/A) LEDs prov ide information about the 1 0Base-T/ 100Base-TX/1000Base-T ports.
Chapter 1: Ove rview 16 AT-x210-16GT Link/Activity LEDs The AT-x210-16GT switch has two LEDs per port on the front pan el to indicate link, activity, duplex , and speed statu s.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 17 See Table 5 for a description for the AT-x210-16 GT and AT-x210-24GT Link/Activity and Speed LEDs. T able 5. A T -x210-16GT and A T -x210-24GT LINK/ACT and SPEED/ DUPLEX LED Descriptions .
Chapter 1: Ove rview 18 Figure 12. AT-x210-16GT SFP Status LEDs The AT-x210-24GT SFP LEDs can be found on between t he upper and lower SFP slots. See Figure 13. Figure 13. AT-x210-24GT SFP Status LEDs Table 6 describes the Link/Activ ity LEDs for the SFP slots.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 19 Power Supply Each switch has an internal p ower supply with a single AC power supply socket on the back panel. To power the switch on or o ff, connect or disconnect the power cord provided wi th the swit ch.
Chapter 1: Ove rview 20.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 21 Chapter 2 Installation This chapter contains the following sections: “Reviewing Safety Precautions” on page 22 .
Chapter 2: Inst allation 22 Reviewing Safety Precautions Please review the following safety pr ecautions before you begin to install the chassis or any of its components. Note The indicates that a translation of the safety state ment is available in a PDF document titled Tran slated Safety Statements .
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 23 All Countries: Install product in accordance with loca l and National Electrical Codes.
Chapter 2: Inst allation 24 Selecting a Site for the Switch Observe the following requirements when choosing a site for your switch: If you plan to install the switch in an equipment rack, verify that the rack is safely secured and will not tip over.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 25 Cable Specifications Table 7 contains the cable spe cific ations for the twisted pair ports. Note The twisted pair ports on the switch fe ature auto-MDI when operating at 10, 100, or 1000 Mbps.
Chapter 2: Inst allation 26 Unpacking the Switch To unpack the switch, perform the following p rocedure: 1. Remove all of the co mponents from the shipping packa ge. Note Store the packaging material in a sa fe location. You must use the original shipping material if you need to re turn the unit to Allied Telesis.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 27 Installing the Switch o n a Table or a Desktop You can install AT-x210-16GT and AT-x210-24GT switches on a desktop, or in a standard 19-inch equipment rack.
Chapter 2: Inst allation 28 Installing the Switch in an Equipment Rack Note: These instructions show you how to install an AT-x210-9GT, AT-x210-16GT or AT-x210-24GT switch in an equipment rack. Rack mount kit brackets are included wi th AT-x210-16 GT and AT-x210-24GT switches.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 29 4. Mount an AT-x210-24GT switch in a 19-inch equipment rack using four equipment rack screws (not provided with the switch).
Chapter 2: Inst allation 30 5. For AT-x210-16GT Switches, attach the two rack mo unt brackets to the sides of the switch using the bracket screws th at come with the unit. See the bracket position as sh own in Figure 18 and Figure 19. Figure 18. Attaching the brackets level with the front of an AT-x210-16GT Figure 19.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 31 6. Mount an AT-x210-16GT switch in a 19-inch equipme nt rack using the provided spacer bracket mounts with four equ ipment rack screws (not provided with the switch), as shown in Figu re 20.
Chapter 2: Inst allation 32 7. For AT-x210-9GT switches, first fit the ra ck mount handles to the brackets using the supplied M3x6mm pa n head screws, as shown below in Figure 21. Figure 21. Fitting rack mount handle s to the brackets for an AT-x210-9GT 8.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 33 9. Next attach the cable tray brackets for AT-x210-9GT switches, as shown below in Figure 23.
Chapter 2: Inst allation 34 11. Mount an AT-x210-9GT switch in a 19-in ch equipment rack using the provided spacer bracket mounts with four equipment rack screws, as shown in Figure 25. Figure 25. Mounting an AT-x210 -9GT Switch in an Equipment Rack 12.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 35 Installing Optional SFP Transceivers To install an SFP transceive r, perform the following procedure: Note The transceiver can be hot-swapped; you do not need to power off the switch to install a transceiver.
Chapter 2: Inst allation 36 4. For an AT-x210-24GT Switch, gently slide the transceiver into the SFP slot until it clicks into place, as shown in Figure 28. Figure 28. Inserting the SFP on an AT-x210-24GT 5. For an AT-x210-16GT Switch, gently slide the transceiver into the SFP slot until it clicks into place, as shown in Figure 29.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 37 6. Verify that the handle on the transceiver is in the upright position, as shown in Figure 30. This secures the transceiver and prevents it from being dislodged from the slot.
Chapter 2: Inst allation 38 Note SFP transceivers are dust sensitive. Always keep the plu g in the optical bores when a fiber optic c able is not installed, or whe n storing the SFP. When you do remove the plug, keep it for fu ture use. Note Unnecessary removal and insertio n of an SFP can lead to premature failure.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 39 Cabling the Switch Observe the following guidelines when connecting twisted pair and fiber optic cables to the ports on the switch: The connector on the cab le should fit snugly into the port on the switch.
Chapter 2: Inst allation 40 The default speed setting for the ports is Auto-Negotiation. This setting is appropriate for ports connected to network devices that also support Auto-Negotiation.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 41 Powering On the Switch To power on the AT-x210-24GT, AT-x210-16GT, or AT-x210-9GT switch, perform the following procedure: 1. Plug the power cord into the AC power connector, as shown in Figure 32 on the back of an AT-x210-16GT Switch.
Chapter 2: Inst allation 42 Warning Power cord is used as a disconnection device. To de-energize equipment, disconnect the powe r cord. E3 Pluggable Equipment. The socke t outlet shall be installed near the equipment and shall be easily accessible.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 43 Monitoring the Initialization Processes It takes about thirty seconds fo r the switch to initialize its management software programs and features, and lo ad the default configuration.
Chapter 2: Inst allation 44 Figure 35. Switch Initia lization Messages (Continued) Starting ba se/loopba ck... [ O K ] Starting ba se/sysctl ... [ O K ] Received ev ent poefw .done Starting ba se/portma pper... [ O K ] Received ev ent syslo g.done Starting ba se/reboot -stability.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 45 Figure 36. Switch Initialization Messages (Continued ) Assigning A ctive Wor kload to HA processe s: hsl, nsm, rm ond, sflowd, vr rpd, irdpd, la cpd lldpd, loop protd, ms tpd, authd, epsrd, i mi, imiprox yd Received ev ent netwo rk.
Chapter 2: Inst allation 46.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 47 Chapter 3 T r oubleshooting This chapter contains information o n how to troubleshoot the switch if a problem occurs. Note For further assistance, plea se contact Allied Telesis Technical Support at www.
Chapter 3: Tro ubleshooting 48 cable: Category 3 or better for 10 Mbp s operation and Category 5 and Category 5E for 100 and 1000 Mbps operation. Note A 1000Base connection may require five to ten seco nds to establish a link. Problem 3: The LINK/ACT LED for an SFP transce iver is off.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 49 Problem 5: A port’s LINK/ACT LED is blinking. Solutions: The link between the port and the n etwork device is intermittent. Try the following: Connect another network device with a different cable to the port.
Chapter 3: Tro ubleshooting 50.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 51 Appendix A T echnical Specifications.
Appendix A: Technica l Specification s 52 Physical Specifications Dimensions Weight Environmental Specifications T able 8. Chassis Dimensions Model W x D x H mm (in) A T -x210-9GT 263 mm x 179 mm x 38 mm (10.35 in x 7.05 in x 1.50 in) A T -x210-16GT 341 mm x 210 mm x 44 mm (13.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 53 Power Specifications Input Supply Voltage - 100-240 VAC, 50 - 60 Hz Electrical Safety and Electromag netic Emissions Certifications T able 1 1. Power S pecifications A T -x210-9GT 12 W A T -x210-16GT 19 W A T -x210-24GT 28 W T able 12.
Appendix A: Technica l Specification s 54 Connectors and Port Pinouts This section lists the connectors and connector pinout s. Figure 37 illustrates the pin layout for a n RJ-45 connector and port. Figure 37. RJ-45 Connector and Po rt Pin Layout Table 13 lists the RJ-45 pin signals when a twisted pair port is operating in the MDI configuration.
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Instal lation Guide 55 Table 15 lists the RJ-45 con nector pins and their signals when a 1000Base-TX port is operating at 10 00 Mbps.
Appendix A: Technica l Specification s 56.
Een belangrijk punt na aankoop van elk apparaat Allied Telesis AT-X210-9GT (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen Allied Telesis AT-X210-9GT heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens Allied Telesis AT-X210-9GT vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding Allied Telesis AT-X210-9GT leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over Allied Telesis AT-X210-9GT krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van Allied Telesis AT-X210-9GT bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de Allied Telesis AT-X210-9GT kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met Allied Telesis AT-X210-9GT . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.