Gebruiksaanwijzing /service van het product PM3 van de fabrikant American Power Conversion
Ga naar pagina of 24
Sur geArrest ® PM Series PM3, PM4, and PM4Y Series Modular Surge Protective Device (SPD) User ’ s Manual American Power Conversion Corporation 132 Fairgrounds Road P .
.
INTRODUCTION ......................................................................................................................................... 1 Installation .....................................................................................
Contents Sur geArrest ® PM Series FIGURES Figure 1 - T ypical Parallel Connections ........................................................................................ ........ 4 Figure 2 - Basic PM3 and PM4 Configuration with Disconnect Switch Option .
INTRODUCTION Thank you for choosing the APC SurgeArrest PM3, PM4, or PM4Y Series Sur ge Protective Device. The APC modular Sur ge Protective Device (SPD) is a high quality , high ener gy surge attenuation system that has been designed to protect sensitive equipment from damaging transient voltage surges.
Unp acking and Preliminary Inspection • Inspect the entire shipping container for damage or signs of mishandling before unpacking the unit. • Remove the cardboard packing and further inspect the unit for any obvious shipping damages.
Page 3 Service Clearance In addition to national and local code requirements, 36 inches of service clearance is needed at the front of the SPD. Equipment Performance T o obtain the maximum system performance, the unit must be located as close to the circuit to be protected as possible, minimizing the interconnecting wire length.
Figure 1. T ypical Parallel Connections NOTE: Safety Ground required for ALL units. Page 4 T able 2: V oltage Rating and Service T ype (by Model) T erminals T erminals have been provided inside the APC modular SPD units for the line (phase), neutral, and equipment safety ground connections.
Wiring Size & Inst allation T orque W ith a parallel connection, the size of the wiring to the SPD is independent of the ampere rating of the circuit to be protected. The recommended wire size is based on the unit’ s transient surge current capabilities.
Page 6 PM SERIES INST ALLA TION INSTRUCTIONS (T ypical Unit - Three Phase WYE, 4 Wire, plus Ground) This section provides basic installation instructions for the PM Series SPD. Per UL 1449 Paragraph 1.4, SPD’ s “are intended for installation on the load side of the main overcurrent protection”.
Page 7 Figur e 3: Basic PM3 and PM4 Configuration and Wiring Diagram (3-Phase WYE, 4-W ire, plus Ground).
Page 8 5/16” Mounting Hole (4 places) Phase A Phase B Connectors Phase C Connector Ground Conductor Not to exact scale. Door removed for clarity Fuse (9 places) Mounting Flange (4 places) Surge Module with LED (9 places) Disconnect Figur e 4.
Operation and Features SPD’ s do not require a great deal of operator intervention after installation. NOTE: The PM Series has a green LED for each phase which extinguishes when the module is no longer providing protec- tion (fault condition).
Page 10 Surge Counter Option In units so equipped, the surge counter option provides a means to total the number of transient voltage sur ges encountered since the counter was last reset. The sur ge counter circuitry includes a “supercap”. This will provide power up to four days to retain memory should a power outage occur .
Periodic Inspection and Cleaning Inspection of the SPD should be performed periodically to maintain reliable system performance and continued transient voltage sur ge protection.
Figure 6: T roubleshooting Flowchart Page 12.
• MAINTENANCE OF THIS SURGE PROTECTIVE DEVICE SHOULD BE PERFORMED BY QUALIFIED ELECTRICAL PERSONNEL ONL Y . • DURING NORMAL OPERA TION, HAZARDOUS VOL T AGES ARE PRESENT INSIDE THE UNIT . • WHEN SERVICING THIS UNIT , BE SURE T O FOLLOW ALL ELECTRICAL SAFETY PRECAUTIONS.
Diagnostic Board Removal & Replacement Instructions T o remove the Diagnostic Board, refer to Figure 8 and proceed as follows: 1. Disconnect power to the SPD. 2 . Remove the board from the standof fs. 3. Remove the connectors one at a time from the existing board and insert them into the appropriate connector on the replacement board.
Surge Module Removal & Replacement Instructions Sur ge modules within the SPD may become damaged and require replacement. T o remove and replace a surge module, refer to Figure 9 and proceed as follows: 1. Disconnect power to the SPD. 2. Open the door on the unit by loosening the two screws that secure the door latches in place.
T able 4: Replacement Parts List Replacement Part s Listing APC offers the items listed in T able 4 as field replaceable items. Page 16 l e d o M C P A r e b m u N m e t s y S e g a t l o Vn o i t p i.
Page 17 LIMITED W ARRANTY APC warrants it’ s AC Panel protection products against defective workmanship and materials for 5 years from the date of original purchase. The panel protection device must be installed by a qualified and licensed electrician in order to qualify fo r warranty protection.
.
.
American Power Conversion Corporation 132 Fairgrounds Road P .O. Box 278 W est Kingston, Rhode Island 02892 USA www .apc.com.
Een belangrijk punt na aankoop van elk apparaat American Power Conversion PM3 (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen American Power Conversion PM3 heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens American Power Conversion PM3 vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding American Power Conversion PM3 leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over American Power Conversion PM3 krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van American Power Conversion PM3 bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de American Power Conversion PM3 kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met American Power Conversion PM3 . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.