HEA T TRANSFER PRODUCTS, INC. 120 BRALEY RD ., E . FREET OWN , MA 02717 Installing , Operating & Maintaining MUNCHKIN VWH HIGH EFFICIENCY HO T W A TER SUPPL Y BOILER Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.
USING THIS MANUAL 2 USING THIS MANUAL SPECIAL A TTENTION BO XES Throughout this manual you will see these special attention box es similar to this one, which are intended to supplement the instructions and mak e special notice of potential hazards. These categories mean, in the judgement of Heat T ransfer Products, Inc.
T ABLE OF CONTENTS 3 T ABLE OF CONTENTS P ART 1 . . . . . . . . . . . . . . . . . . . . . .4 thru 8 GENERAL INFORMA TION A How It Operates . . . . . . . . . . . . . . . . . .4 B Munchkin Ratings and Dimensions . .5–7 C Pre-installation Requirements .
GENERAL INFORMA TION 4 RECOMMENDED SERVICE CLEARANCES P ART 1. GENERAL INFORMA TION A. HOW IT OPERA TES The Munchkin VWH is a hot water supply boiler designed to operate in conjuction with a hot water storage tank. Each Munchkin VWH is equipped with a high velocity pump to keep the unit running efficiently for many years of service.
GENERAL INFORMA TION 5 B. MUNCHKIN RA TINGS AND DIMENSIONS MODEL INLET OUTLET RECO VERY RA TE FIRST HOUR RA TING W/ 80 GAL. STORA GE T ANK FIRST HOUR RA TING W/ 119 GAL.
6 GENERAL INFORMA TION DIMENSIONS Figure 1-2.
GENERAL INFORMA TION 7 GENERAL 1. Munchkin VWH is supplied completely assem- bled as a packaged boiler . The package should be inspected for damage upon receipt and any damage to the unit should be reported to the shipping company and wholesaler . This boiler should be stored in a clean, dry area.
8 If the Munchkin is set up for liquefied petroleum (LP) gas, some geographic areas follow the Uniform Mechanical Code, section 304.6, “Liquefied petroleum gas burning appliances shall not be installed in a pit, basement or similar location where heavier -than-air gas might collect.
9 ELECTRICAL P ART 2. ELECTRICAL A. ELECTRICAL CONNECTION The electrical connection for the Munchkin is on the left hand side of the unit. There is a ½” knockout location for an electrical connection for both the incoming power and the circulator connection.
10 GAS CONNECTION P ART 3. GAS CONNECTION A. GAS CONNECTION The gas supply shall have a maximum inlet pressure of less than 14” water column (350 mm), ½ pound pressure (3.5 kP a), and a minimum of 7” water column. The entire piping system, gas meter and regulator must be sized properly to prevent pressure drop greater than 0.
11 GAS CONNECTION It is recommended that a soapy solution be used to detect leaks. Bubbles will appear on the pipe to indicate a leak is present. The gas piping must be sized for the proper flow and length of pipe, to avoid pressure drop. Both the gas meter and the gas regulator must be properly sized for the total gas load.
12 VENTING P ART 4. VENTING A. APPRO VED VENTING MA TERIALS EXHAUST VENT Use Plastic 3” and 4” and 6” Pipe Schedule 40 or 80. 1. Non-F oam Core PVC Pipe 2. Non-F oam Core CPVC Pipe 3. Non-F oam Core ABS Pipe V ent Piping must conform to following 1.
13 VENTING The inlet pipe on the back of the cabinet is 3" for the 199 VWH and 4" for the 399 VWH. It is very important that you plan the location properly to eliminate long pipe runs and excessive fittings. Inlet pipe size must not be reduced.
14 VENTING RECOMMENDED VENTING CLEARANCES PER THE NA TIONAL FUEL GAS CODE* All venting must be properly supported. The Munchkin is not intended to support any venting whatsoever .
15 The connection of air inlet and exhaust vent at the heater must remain 3” for 199VWH and 4” for 399VWH and each vent must extend from the heater a minimum of 15 equivalent feet before transi- tioning to a 4” vent for the 199VWH and 6” vent for the 399VWH.
16 VENTING 3. If practical, close all building doors, windows and all doors between the space in which the appliance remains connected to the common venting system located and other spaces in the building. T urn on clothes dryers and any appliances not connected to the common venting system.
17 VENTING Figure 4- 1: Si dewall V ent with T ee (Intake) & Coupling (Exhaust) for standard floor units 3” piping for 199VWH 4” piping for 399VWH **IMPORT ANT NO TE : All vent pipes must be glued, prop- erly supported and the exhaust must be pitched a mini- mum of a ¼" per foot back to the boiler (to allow drainage of condensate).
18 VENTING DIA GRAMS FOR VERTICAL VENTING Figure 4- 5: Roof V ent with tee (intake) & coupling (exhaust) for standard floor units 3” piping for 199VWH 4” piping for 399VWH **IMPORT ANT NO TE :.
19 PIPING P ART 5. PIPING THE MUNCHKIN VWH T O THE ST ORAGE T ANK The Munchkin is designed to be connected to a storage tank to supply domestic hot water . Heat T ransfer Products has available storage tanks that are 80/119 gallon size storage tanks constructed in either Stainless Steel or Glass lined construction.
20 PIPING Piping Symbol Legend circulator (open loop) (w/ isolation flanges) gate valve globe valve ball valve swing-check valve spring-loaded check valve hose bib / boiler drain diaphragm-type expans.
21 PIPING Volume Water Heating using Munchkin boiler (1 boiler supplying one storage tank) Drawing VWH 1/1 flow switch expansion tank ASEE 1017 rated anti-scald valve (recommended) condensate drainage constant circulation vacuum breaker (where required by code) Superstor Ultra Storage Tank hot water supply recirculation line cold water NOTES: 1.
22 PIPING Volume Water Heating using Munchkin boiler (1 boiler supplying two storage tanks) flow switch expansion tank ASEE 1017 rated anti-scald valve (recommended) condensate drainage constant circu.
23 PIPING Drawing VWH 2/1 H Volume Water Heating using Munchkin boiler (2 boilers supplying one storage tank) NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes.
24 PIPING Volume Water Heating using Munchkin boiler (2 boilers supplying one storage tank) Drawing VWH 2/1 V NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes.
25 PIPING Drawing VWH2/2 H Volume Water Heating using Munchkin boilers (2 boilers supplying two storage tanks) NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes.
26 PIPING Drawing VWH2/2 V Volume Water Heating using Munchkin boilers (2 boilers supplying two storage tanks) NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes.
27 PIPING Drawing VWH 3/2 H Volume Water Heating using Munchkin boiler (3 boilers supplying two storage tanks) NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes.
28 PIPING Drawing VWH 3/2 V Volume Water Heating using Munchkin boiler (3 boilers supplying two storage tanks) NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes.
29 ST ART -UP PROCEDURES P ART 6. ST ART -UP PROCEDURES A. SEQUENCE OF OPERA TION 1. When power is first applied to the control, the control display will read the outlet tempera- ture. The control will initially run through a self-diagnostic routine and then go into its oper- ating mode.
30 C. LIGHTING INSTRUCTIONS FOR Y OUR OWN SAFETY READ BEFORE OPERA TING 1. This appliance does not have pilot. It is equipped with an ignition device which automatical- ly lights the burner . Do not try to light the burner by hand. 2. BEFORE OPERA TING smell all around the appliance area for gas.
31 F . ST A TUS MENU Installers are also able to check the current status of the Munchkin parameters by pressing S4/Reset key for 3 seconds. Once activated, the display will show d1 alternating value of the actual outlet tem- perature. Actual values are displayed for each function.
32 ST ART -UP PROCEDURES H. T O TURN OFF GAS TO APPLIANCE 1. Set the thermostat to lowest setting. 2. T urn off all electric power to the appliance if service is to be performed. 3. Remove the front cover . 4. T urn gas shutoff valve to "off".
MUNCHKIN 199VWH GAS V AL VE MUNCHKIN 399VWH GAS V AL VE ST ART -UP PROCEDURES 33 Fig . 6-3 THROTTLE ADJUSTER (NOTE: IF FOR ANY REASON THE THROTTLE NEEDS TO BE ADJUSTED , IT IS VERY IMPORTANT THAT A "COMBUSTION ANAYLYZER" BE USED TO ENSURE SAFE AND PROPER OPERATION.
34 TROUBLESHOOTING C A UTION This appliance has wire function labels on all internal wiring. Observe the position of each wire before removing it. Wiring errors may cause improper and dangerous operation.
35 TROUBLESHOOTING T able 7-2: 925 Control Board F AUL T Codes e d o Cn o i t p i r c s e Dy d e m e R 0 0 F . d e d e e c x E t i m i L h g i H . 1 . 2 .
36 TROUBLESHOOTING Boiler Resistance (ohms) 32 32550 41 25340 50 19870 59 15700 68 12490 77 10000 86 8059 95 6535 104 5330 113 4372 122 3605 131 2989 140 2490 149 2084 158 1753 167 1481 176 1256 185 1.
37 MAINTENANCE P ART 8. MAINTENANCE A. MAINTENANCE PROCEDURES P eriodic maintenance should be performed once a year by a qualified service technician to assure that all the equipment is in safe efficient operation. The owner can make necessary arrangements with a qualified heating contractor for periodic maintenance of the heater .
38 MAINTENANCE in which case, a qualified plumber will need to be contacted to follow the Coil Cleaning Instructions (Section D) included in this section to dissolve deposit and clean condensate line.
39 MAINTENANCE ST AND ARD 925 CONTROL WIRING LA Y OUT FOR 199VWH Fig . 8-1 925 CONTROL WIRING LA Y OUT FOR 399VWH Fig . 8-2 E. MUNCHKIN CONTROLLERS.
40.
41.
42.
NOTES 43.
LP -147 REV . 7/7/04.
Een belangrijk punt na aankoop van elk apparaat Munchkin VWH High Efficiency Hot Water Supply Boiler (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen Munchkin VWH High Efficiency Hot Water Supply Boiler heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens Munchkin VWH High Efficiency Hot Water Supply Boiler vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding Munchkin VWH High Efficiency Hot Water Supply Boiler leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over Munchkin VWH High Efficiency Hot Water Supply Boiler krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van Munchkin VWH High Efficiency Hot Water Supply Boiler bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de Munchkin VWH High Efficiency Hot Water Supply Boiler kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met Munchkin VWH High Efficiency Hot Water Supply Boiler . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.