Gebruiksaanwijzing /service van het product SL236SPI van de fabrikant Chief
Ga naar pagina of 20
INSTALLATION INSTRUCTIONS I nstruccion es de in stal ación I nstal lati onsanl eitu ng I nstruções de Insta lação I struzion i di install azione I nstal lati e-i nstr ucti es I nstructi ons d ´insta llat ion This de vic e comp lies wi th part 1 5 of the FCC ru les.
SL23 6i Instal latio n Ins truc tion s 2 DISCLAIMER Mile sto ne A V Technol ogies, a nd its aff ili at ed corpora tions and subsi di aries ( col lect ive ly , "Mile stone" ), int end to mak e this manu al acc urate and co mplete.
Installa tion Ins tru cti ons SL23 6i 3 TOOLS REQUIRED FOR INSTALLA TION P AR TS I/M x1 A ( 1 ) B ( 1 ) C ( 5) D (1) E ( 1 ) F ( 5) G ( 4) 6-32 x 3/ 16 H (2 ) [Cei lin g l ift ] [Push butt on ass embl.
SL23 6i Instal latio n Ins truc tion s 4 LEGEND TABL E O F CON TEN TS Disclaim er................ ............... .............. ........2 Tools Req uired F o r Installa tion ............ ..........3 Part s.............................................
Installa tion Ins tru cti ons SL23 6i 5 DIMENSIONS 23.87 20.50 23.00 10. 25 28.85 [698 .5] 25. 00 [ 669. 3] MAXIMUM AVAILABLE SPACE FOR PRO JECTOR AND EQUI PMENT HxW x D = 9.2 5 x 20 .5 0 x 22 .7 5 I N CHE S 11.0 6 36.00 MAX . 65 1. 06 .75 [520 .7] [26 0.
SL23 6i Instal latio n Ins truc tion s 6 INSTALLA TI ON REQ UIREMENTS NOT E: Throug hout this do cument , ref ere nce to SL236i r efers to bot h SL236FDi a nd SL236SPi mo dels. The SL 236i ha s been design ed to be mount ed rec esse d int o a ceili ng.
Installa tion Ins tru cti ons SL23 6i 7 Fig ure 4 Power Requirements a nd Wiring The SL 236i r equir es 230VAC 50 Hz power t o oper ate. NOT E: A 6 ft . lo ng power ca ble is pro vided w ith the moun t. This su ppl ied po wer cord shoul d be used f or test ing only , and not f or the per manent ins tall ation.
SL23 6i Instal latio n Ins truc tion s 8 2. Pull d own on ea ch corner of ceiling panel to rem ove cei l ing panel c lips f rom rec tan gular holes. (See Figure 5) 3. Inst all t he SMA6 51 (opt ional a ccessory) at t his ti me, i f applica ble, followi ng in struct ions i ncluded wi th the ki t.
Installa tion Ins tru cti ons SL23 6i 9 Fig ure 9 13. Line up cli ps on four cor ner s of cei ling pa nel with ho les in SL236SPi . 14. Re-i nstal l fo ur clip s on cei ling pane l into r ect angular h oles on SL2 36SPi .
SL23 6i Instal latio n Ins truc tion s 10 2. Press i n end tabs o n both en ds of yaw adjust ment b racket and loc k into place. ( See Figure 1 1) 3. Remov e the yaw adj ust ment b rac ket f rom th e SL 236i b y li ftin g up. (S ee Figure 1 1) F ig ur e 11 4.
Installa tion Ins tru cti ons SL23 6i 11 2. FORWARD/BACKWARD an d PITCH • To s hift project or backwa rd or forward (or u p or down ), loos en the nuts on each end of the ya w ad justment brack et. (See Fi gure 14) • Move mou nting br acket f orwar d or ba ckward (or up or down) as re qui red.
SL23 6i Instal latio n Ins truc tion s 12 Figure 17 Connecting Control Wir ing 1. Unp lug the SL236i ’ s power c ord ( J) (used f or te sting) . 2. Remov e the j umper wire ( E) and supp lied push button (B) wiring ( previo usly ins ta lled i n the Pre-Test Lift before Inst allat ion section ) from the ext erna l termi nal block.
Installa tion Ins tru cti ons SL23 6i 13 Table 1: WIRING TABLE Figure 18 NOT E: The number s listed in t he SL236i Intern al and SL236i Ext ernal columns r ef er to th e corresp ondi ng numbe rs loca ted whe re indi cated i n the wi ring pictures .
SL23 6i Instal latio n Ins truc tion s 14 Table 2: INTERNAL TE RMINAL DESCRIPTI ONS.
Installa tion Ins tru cti ons SL23 6i 15 Figure 19.
SL23 6i Instal latio n Ins truc tion s 16.
Installa tion Ins tru cti ons SL23 6i 17.
SL23 6i Instal latio n Ins truc tion s 18.
Installa tion Ins tru cti ons SL23 6i 19.
SL23 6i Instal latio n Ins truc tion s Chief Manuf acturing, a products di visi on of Mi lest one A V Technologies 8820-0 02033 Rev0 0 201 1 Milest one A V Technol ogi es, a Duchosso is Gr oup Com pany www . chiefmf g.co m 05/1 1 USA/In ternati ona l A 8401 Eagl e Creek Parkway , S avage, MN 553 78 P 800.
Een belangrijk punt na aankoop van elk apparaat Chief SL236SPI (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen Chief SL236SPI heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens Chief SL236SPI vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding Chief SL236SPI leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over Chief SL236SPI krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van Chief SL236SPI bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de Chief SL236SPI kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met Chief SL236SPI . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.