506271-01 Page 1 of 14 Issue 0921 Save these instructions for future reference INST ALLA TION INSTRUCTIONS RPGE/RGE Series Gas Heating/Electric Cooling Package Unit Do not store combustible materials, including gasoline and other flammable vapors and liquids, near the furnace, vent pipe, or warm air ducts.
Page 2 of 14 506271-01 Issue 0921 INST ALLA TION T hese instructions must be hung on or near the furnace in a conspicuous place. These furnace units are single package air conditioners with gas heat designed for outdoor installation on a roof top or a slab.
506271-01 Page 3 of 14 Issue 0921 In the U.S., units may be installed on combustible floors made from wood or class A, B, or C roof covering material. In Canada, units may be installed on combustible floors.
Page 4 of 14 506271-01 Issue 0921 Minimum horizontal clearance of 4' from electric meters, gas meters, regulator , and relief equipment is required. In addition to the above requirements, consideration must be given to prevent unwanted ice buildup from the vent condensate.
506271-01 Page 5 of 14 Issue 0921 The supply and return air duct systems should be designed for the CFM and static requirement s of the job. They should not be sized by matching the dimensions of the duct connections on the unit. Filters Filters are not supplied with the unit.
Page 6 of 14 506271-01 Issue 0921 Gas piping recommendations: • A drip leg and a ground joint union must be installed in the gas piping. A ground joint union is recommended by the manifold/valve. • When required by local codes, a manual shutoff valve may have to be installed outside of the unit.
506271-01 Page 7 of 14 Issue 0921 All wiring should be done in accordance with the National Electrical Code, ANSI/NFP A No. 70 (latest edition); Canadian Electrical Code Part 1, CSA C22.1 (latest edition); or local codes where they prevail. Use wiring with a temperature limitation of 75°C minimum.
Page 8 of 14 506271-01 Issue 0921 ST ART -UP Pre-St art Check List Complete the following checks before starting the unit: 1. Check the type of gas being supplied. Be sure it is the same as listed on the unit nameplate. 2 . Make sure that the vent cover has been properly installed.
506271-01 Page 9 of 14 Issue 0921 Manifold Gas Pressure Adjustment Regulator – Natural Gas For purpose of input adjustment, the minimum permissible gas supply pressure is 5" w .c. for natural gas. Gas input must never exceed the input capacity shown on the rating plate.
Page 10 of 14 506271-01 Issue 0921 7. After reassembly of all p arts is complete and all wires are reconnected, open the main manual gas shutoff valve; check for and correct any gas leaks. T urn electrical power on, initiate a call for heat, and check for proper burner operation.
506271-01 Page 11 of 14 Issue 0921 10-second interval, then the ignition control will de- energize the gas valve. 6. The ignition control is designed to repeat this “trial for ignition” a total of three times.
Page 12 of 14 506271-01 Issue 0921 Burners T o clean the burners, first remove them from the furnace as explained in Burner Instructions on page 9. V acuum and/or brush as required. V ent Outlet Visually inspect vent outlet periodically to make sure that there is no buildup of soot or dirt.
506271-01 Page 13 of 14 Issue 0921 Wiring Diagram – Single Phase Figure 8.
Page 14 of 14 506271-01 Issue 0921 NOTES.
Een belangrijk punt na aankoop van elk apparaat Allied Air Enterprises 506271-01 (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen Allied Air Enterprises 506271-01 heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens Allied Air Enterprises 506271-01 vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding Allied Air Enterprises 506271-01 leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over Allied Air Enterprises 506271-01 krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van Allied Air Enterprises 506271-01 bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de Allied Air Enterprises 506271-01 kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met Allied Air Enterprises 506271-01 . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.