Gebruiksaanwijzing /service van het product AK-50 van de fabrikant GE
Ga naar pagina of 32
INTRODUCTION GE Conversion Kits are designed for upgrading existing GE low-voltage power circuit breakers, rather than replacing the entire breaker. The Con- version Kits include ProTrip™ Trip Units, the latest technological advance in GE trip systems.
2 TABLE OF CONTENTS SECTION 1. GENERAL INFORMATION ....................................................................................................... 4 SECTION 2. BEFORE INSTALLATION ...............................................................
3 LIST OF FIGURES 1. Relocation and remounting of the W and X relays. ................................................................................ 5 2. New X and W relay mounting brackets ...........................................................
4 SECTION 1. GENERAL INFORMATION GE Conversion Kit installation is straightforward, but does require careful workmanship and attention to these instructions. Familiarity with the breaker is highly desirable. The general approach is to first remove the existing trip devices from the breaker, then install the ProTrip components.
5 SECTION 3. FRONT FRAME BREAKER CONVERSION Front frame conversion consists of the following steps: 1. Separation of the front and back breaker frames for AK-50, AKU-50, AKS-50, and AKT-50 break ers. (Frame separation is not necessary for AK-75 and AK-100 breakers.
6 Installing the Flux Shifter Assembly The installation procedure for the flux shifter assembly, illustrated in Figure 3, varies depending on the type of breaker and existing trip device. In some cases, mounting holes must be added, termi- nal blocks relocated, or breaker side rails removed.
7 Breakers with a Side Bracket 1. Drill a 34” diameter hole into the flux shifter assembly mounting base to provide the neces- sary clearance for the bracket. The location of the new hole is shown in Figure 6. 2. Remove the side bracket from the frame and drill the holes according to the pattern in Figure 4.
8 Breakers with ECS or SST Trip Systems 1. Remove the ECS or SST trip unit. 2. Remove the existing flux shifter device and the trip unit control harness.
9 Installing the Trip Unit Mounting Bracket The new ProTrip trip unit mounts to the left side of the front channel. A mounting bracket is shock-- mounted to a plate that is assembled to the front channel. EC or Power Sensor Trip System 1. The h oles for the new mounting plate may have to be added to the front channel.
10 Figure 13. Trip unit mounting bracket attached to the mounting plate..
11 SECTION 4. BACK FRAME CONVERSION The back frame conversion consists of the following operations: 1. Modification of the crossbar assembly for the flux shifter installation. 2. Removal of the existing trip devices. 3. Installation of the phase sensors.
12 Removing the Existing Trip Devices AK-50 & AKS-50 Breakers with EC or Power Sensor Trip Systems 1. Remove and discard the two screws at the base of each trip device, as shown in Figure 16. Dis- card the metal mounting brackets. 2. Remove and discard the small Philips-head screw at the top of each trip device.
13 Installing the Phase Sensors AK-50 & AKS-50 Breakers Figure 18 shows the parts provided for assembly of the CT on each pole. 1. Mount the new copper CT post to the back frame with the two 3 8 -16 x 1 1 2 " bolts, flat washers, and lock washers provided, as shown in Figure 19.
14 AK-75 & AK-100 Breakers 1. The ProTrip phase sensors mount on the upper breaker studs, as shown in Figure 21. The sen- sors held on the stud with locking rings. Leave enough of the stud exposed for the primary fin- gers to engage. Engage the sensor’s antiturn lugs with the notch in the locking ring.
15 SECTION 5. INSTALLING THE TRIP UNIT 1. Remove the large screw from the rear of the trip unit. Place the trip unit in position on the mount- ing plate, with the 50-pin connector aligned with the opening in the plate. Secure with the large screw, as shown in Figure 22.
16 SECTION 6 FOUR-WIRE GROUND FAULT OPTION The ground fault option for four-wire installations requires the installation of an additional current sensor on the neutral bus in the equipment. The sensor is connected to the trip unit through the connector provided in the wiring harness.
17 AK-50 & AKS-50 Draw-Out Breakers The fourth-wire disconnect for AK-50 and AKS-50 draw-out breakers mounts to the lower back frame, as shown in Figure 25. • If the terminal board is already present on the breaker, just replace the control harness.
18 Figure 28. AK-75 & AK-100 back frame conversion..
19 Installing the Neutral Sensor The neutral sensor is an electrical duplicate of the phase sensor, including the taps. Therefore, when taps (if provided) are changed on the phase sensors, the taps on the neutral sensor must be similarly changed. For kits with fixed phase sensors, be sure to use the corresponding tap on the neutral sensor.
20 Figure 30. Outline of the neutral sensor for AK-75 and AK-100 breakers.
21 SECTION 7. EQUIPMENT CONVERSION Installing Mounting Brackets The equipment compartment contains the mating portions of the fourth-wire disconnect and the neu- tral sensor. The same disconnect assembly is used for types AKD, AKD-5, and AKD-6 switchgear.
22 Figure 34. AK-50 & AKS-50 fourth-wire disconnect for AKD. Figure 35. Fourth-wire disconnect for AKD-5 & AKD-6..
23 SECTION 8. TESTING AND TROUBLE- SHOOTING WARNING : Do not change taps on the current sen- sors or adjust the trip unit settings while the breaker is carrying current. Failure to adhere to these instructions will void all warranties. Testing Before installing a converted breaker back into service, perform the following steps: 1.
24 connecting the breaker from all power sources, per- form the follow ing procedure: 1. Check that all phase sensors are the same type (current range).
25 Figure 36. Cabling diagram for ProTrip™ trip units with ground fault on four-wire loads..
.
27 APPENDIX – DRILL TEMPLATES Appendix 1. Drill Template for Flux Shifter Mounting.
.
29 Appendix 2. Drill Template for Trip Unit Mounting Appendix 3. Drill Template for Flux Shifter Mounting.
.
.
These instructions do not cover all details or variations in equipment nor do they provide for every possi ble contingency that may be met in connection with installation, operation, or maintenance.
Een belangrijk punt na aankoop van elk apparaat GE AK-50 (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen GE AK-50 heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens GE AK-50 vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding GE AK-50 leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over GE AK-50 krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van GE AK-50 bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de GE AK-50 kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met GE AK-50 . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.