Gebruiksaanwijzing /service van het product 10-40 KVA 380/400/415 V van de fabrikant APC
Ga naar pagina of 32
Inst allation Smart-UPS ® VT XR Battery Enclosure 10-40 kV A 380/400/415 V 10-30 kV A 208/220 V 10-30 kV A 200/208 V.
.
Content s Smart-UPS VT ® 10-40 kVA 380/4 00/415 V, 2 08/220 V, 200/208 V Battery Ins tallation i Safety .......... ............ ......... ................ ............... ............. .... 1 IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS . .
Smart-UPS VT ® 1 0-40 kVA 380/400/41 5 V, 208/220 V, 200 /208 V Bat tery Insta llation ii Final Mechanical Assemb ly ........ ......... ......... ................ 20 Level the Enc losures (L-shaped Floor Anchoring Brackets) and Instal l Batteries . .
1 Smart-UPS VT ® 10-40 k VA 380/400/415 V, 208/220 V, 200/208 V Battery Installation Safety IMPORT ANT SAFETY INSTRUCTIONS - S A VE THESE INSTRUCTIONS W arning: • ALL safety instructio ns in the Safety Sheet (9 90-2822) must be r ead, understoo d, and followed when instal ling the UPS s ystem.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 2 Prep are for Floor-Anchoring (optional) Note: If floor anchoring and batter y securing is required, rea d this section. If not, see “Pr epar e for Cables ” on page 5.
3 Smart-UPS VT ® 10-40 k VA 380/400/415 V, 208/220 V, 200/208 V Battery Installation Hole positions for a stand-alone UPS en closu re with L-shaped anchoring br ackets Note: Recommende d minimum number of scre ws per encl osure for the L-shaped bra ckets is four; one in each corner .
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 4 Hole position s for up to four UPS unit s in p arallel with U-shaped an choring brackets. Note: Recommended minimum number of f loor screws for the below two configurati ons is 10.
5 Smart-UPS VT ® 10-40 k VA 380/400/415 V, 208/220 V, 200/208 V Battery Installation Prep are for Cables Remove the front panel 1. T urn th e scre w to t he right t o the un locked position . 2. Pul l the top of the front panel away from the UPS. 3. Lif t the fr ont panel free of the two slots at th e bottom o f the encl osure.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 6 Remove the cable landin g cover and bo ttom plates T o access the cable landing ar ea in the UPS and th e XR Battery Enclosu re(s), f ollow this procedure : 1.
7 Smart-UPS VT ® 10-40 k VA 380/400/415 V, 208/220 V, 200/208 V Battery Installation Remove the XR Battery Modu les Heavy: Use t wo people t o lift the batter y modules.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 8 Anchor the UPS and additional XR Battery or UPS Enclos ure( s) (op tiona l) Note: Enclos ures can be kept apart or assembled and anchored with in terconnection p lates and brackets : SUVTOP T004: 352 mm (13.
9 Smart-UPS VT ® 10-40 k VA 380/400/415 V, 208/220 V, 200/208 V Battery Installation Note: The U-s haped interconne ction bra ckets are 1-2 mm hig her than the openi ng below the enclosur e to inact ivate the cast ers. Ther efore, the enclo sure must be til ted when pla cing the U- shaped int erconnection br ackets un der the enclosur e.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 10 6. In sert the interco nnection plates betwee n the two enclosur es.
11 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation Run the Cables Connect Power in Inst allations wi th Busbars W arning: Befo re carry ing out t he ste ps b elow , you m ust foll ow th e T ota l Pow er O ff proce dure in the Oper ation manual.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 12 Inst a ll busbars 523 mm (20 .59 in) UPS Sys tem with the UPS placed to the l eft ( seen fr om the fro nt).
13 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation 523 m m (20. 59 in) U PS sys tem w ith the UP S pla ced to the righ t (seen from the front ).
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 14 352 m m (13. 85 in) U PS sys tem w ith the UP S plac ed to th e righ t (seen fro m the fro nt).
15 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation 352 m m (13. 85 in) U PS sy stem w ith the UPS pla ced to the left (see n from the fron t).
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 16 Connect Power in Inst allations wi th Cables Inst a ll power cables See “Recomme nded cable sizes” on p age 23 . Inst all po wer cables bet ween the U P S and t he XR Bat t ery En closure.
17 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation Inst all po wer cable s betw een two XR B attery Enclos ures. 1. Fee d the cable up throu gh the condu it box on XR1 or throu gh the transpar ent cable route br acket (not show n) to the cable connec tion area .
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 18 Connect Co mmunicatio n Cables 1. Fee d the cable from pi n connect ion J10 6 in the UPS do w n throu gh the conduit (i f appliccable ). 2. Run t he cable u p into the XR condui t and conne ct it to pin con nection J200 in t he XR Batter y Enclosure .
19 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation Connect the EPO Connect the EPO to the UPS and the XR Battery Enclosure 1. Conne ct the EPO ( Em er gency Power Off) to J10 8 in the UPS a nd to J203 in the XR Bat tery Enclosure by guiding the cable th rough conduits .
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 20 Final Mechanical Assembly Level the Enclosures ( L-shaped Floor Anchoring Bracket s) and Inst all Bat teries No.
21 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation Inst a ll battery-secu ring and floor-ancho ring brackets 1. In stall the batt eries by pushing them al l the way i nto th e enclosur e. 2. If requir ed, install t he battery s ecuring bra ckets t o hold the bat teries firml y in pla ce.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 22 Reinst all the Enclosure Plat es Reinstall the cable landing cov er plates and the bottom plates 1. Rei nstall t he cable landin g cover plates on the XR Battery Encl osure(s) 2.
23 Smart-UPS VT ® 10-40 kV A 380/400/4 15 V, 208/220 V, 20 0/208 V Battery Ins tallation S pecifications Bat ter y volt age and cu rrent Recommended cab le sizes Note: Power t erminal lug di ameter: minimum 6 mm (0.2 in). T orque value: 45 lbf-in/ 7 Nm.
Smart-UPS VT ® 10-40 kVA 380/400 /415 V, 208/220 V, 2 00/208 V Batte ry Installation 24 Post-Inst allation Checklist Use the f ollowing checkli st to ver ify that the XR Batt ery Enclos ure has been inst alled cor rectly: Note: If a problem occurs, cal l Customer Support (see the back cover).
.
.
.
11 / 2 0 0 9 990-1740D-001 *990-1740D-001* APC W orldwide Customer Support Customer s upport for this or any oth er APC product i s availab l e at no c harge in any of the followin g ways: • V isit the APC W eb site to a ccess docu m ents i n the APC Knowled ge Base and to s ubmit custo m er support requests.
Een belangrijk punt na aankoop van elk apparaat APC 10-40 KVA 380/400/415 V (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen APC 10-40 KVA 380/400/415 V heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens APC 10-40 KVA 380/400/415 V vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding APC 10-40 KVA 380/400/415 V leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over APC 10-40 KVA 380/400/415 V krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van APC 10-40 KVA 380/400/415 V bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de APC 10-40 KVA 380/400/415 V kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met APC 10-40 KVA 380/400/415 V . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.