SGH Steam Generating Humidifier Installation and Operation Guide IMPORTANT: Read and save this guide for future reference. This guide to be left with equipment owner.
Table Of Contents INSTALLATION 1 RECEIVING & UNPACKING EQUIPMENT ................................1 PRE-INSTALLATION CHECKPOINT ...................................1 BASIC HUMIDIFIER CONFIGURATION ..................................1 LOCATION & MOUNTING .
INSTALLATION RECEIVING & UNPACKING EQUIPMENT 1. Check packing slip to ensure ALL material has been delivered. 2. All material shortages are to be reported to Liebert within 48 hours from receipt of goods. Liebert assumes no responsibility for any material shortages beyond this period.
to clearances required for plumbing, electrical, and control entrances. The clearance dimensions shown in this manual are for reference only and are the minimum required for maintenance of the humidifier. Local and National Codes should be consulted prior to final location and installation of the humidifier.
FRONT WALL SIDE STEAM CONDENSATE A 005-030 3.2" (8.0cm) 050-100 3.2" (8.0cm) A POWER AND CONTROL WIRING FROM HUMIDIFIER 10-20 050-100 3.2” (8 cm) 3.
5. Exercise extreme caution when installing in fiber glass or internally lined ducts. 6. High positive or negative static pressure ducts or plenums have special requirements. High positive static pressure ducts may require the unit to be fitted with a fill cup extension kit.
10. Any distributor longer than 3 feet (1 meter) should be supported at its end with a threaded rod through top or bottom of duct. See Figure #10. 11. It is recommended that single distributors are mounted near the bottom of the duct to ensure the steam is dispersed into the majority of the air flow.
5. ALWAYS supply and install a shut off valve in the water supply line dedicated to the humidifier to facilitate servicing. Use ½ "O D copper to within 4 feet of the humidifier. Reduce copper to 3/8" OD and connect to the factory-supplied 3/8" olive compression fitting under the humidifier.
3. Liebert steam supply hose or field-supplied piping should be sloped downwards from the steam distributors to the humidifier. Slope should be at least 2" in 12" to promote condensate runback. See Figure #18. If this slope is not possible, condensate must be removed before the distributor.
ACCESSORIES - FILL CUP EXTENSION KIT(S) 1. The SGH humidifier is an electrode humidifier. It produces steam at atmospheric pressure. Pressure head must develop to push steam through supply line and into air duct. 2. Combined resistance of duct positive static pressure and steam line resistance creates a small pressure head in steam cylinder.
impeding condensate flow when duct pressures are below atmosphere. 6. The condensate line can go to either of two large holes in the fill cup cover on top of humidifier.
information is relevant to all controls, factory supplied or otherwise. A, B and C (described below) are to be wired in series (only one path for current) across terminals 8 and 10 on the low voltage control terminal strip, or replaced with a jumper wire for constant operation (see Figure #27).
4. The modulation signal must increase from minimum toward maximum as sensed RH (actual RH) drops below desired RH (%RH setpoint). In response, humidifier ’ s steam output will increase from minimum toward maximum. When humidifier ’ s steam output (lbs/hr) matches humidification load (lbs/hr), modulation signal will stabilize.
satisfied and stops again. The resultant short-cycling is easily overcome. A manual capacity adjustment potentiometer ( “ pot ” ) is provided on the SGH main pc board for that purpose. It is marked “ CAPACITY ADJUST ” and is adjustable from 25 to 100% of rating.
LIMITED WARRANTY Liebert Corporation (hereinafter collectively referred to as THE COMPANY), warrant for a period of two years from date of shipment, that THE COMPANY ’ s manufactured and assembled products, not otherwise expressly warranted (with the exception of the cylinder) are free from defects in material and workmanship.
Model # :_________________________ Serial # :__________________________ Cylinder # :_________________________ Cylinder Last Replaced: _________________________ MTH/DAY/YR _________________________ MTH/DAY/YR _________________________ MTH/DAY/YR PRINTED IN CANADA LIEBERT CORPORATION 1050 Dearborn Drive, P.
Een belangrijk punt na aankoop van elk apparaat Liebert SL-14050 (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen Liebert SL-14050 heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens Liebert SL-14050 vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding Liebert SL-14050 leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over Liebert SL-14050 krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van Liebert SL-14050 bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de Liebert SL-14050 kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met Liebert SL-14050 . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.