Gebruiksaanwijzing /service van het product SCH-I-O van de fabrikant Lochinvar
Ga naar pagina of 44
Installation & Operation Manual SCH Collectors This manual must only be used by a qualified heating installer/service technician. Read all instructions before installing. Perform steps in the order given. Failure to comply could result in severe personal injury, death, or substantial property damage.
2 Hazard definitions The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product.
1 Introduction The SCH collector is suitable for parallel installations and inclined installations on pitched and flat roofs as well as freest anding on the ground. It is available as a single-piece large collector in sizes ranging from 65 to 130 ft 2 with inlet and outlet connections of .
SCH Collectors Installation & Operation Manual 4 SCH Collector 7 1 7 2 4 8 6 3 5 6. Inlet connection Copper pipes, .86" diameter. 7. Outlet connection Copper pipes, .86" diameter. 8. Absorber coils 10 mm copper, serpentine arrangement. 9.
SCH Collectors Installation & Operation Manual Installer – Read all instructions, including this manual before installing. Perform steps in the order given. Have your collector(s) serviced/inspected by a qualified service technician, at least annually.
6 SCH Collectors Installation & Operation Manual WARNING Only authorized solar companies familiar with our products may handle them. WARNING There is a risk of injury when handling collectors and mounting accessories as these have sharp edges.
Figure 2-2 Multiple Array Piping SCH Collectors Installation & Operation Manual 7 2 Location Array options For series and parallel connection of multiple collectors, it is advisable to calculate the pressure drop over the entire system with the aid of the enclosed documents and to install an appropriate pump if necessary.
SCH Collectors Installation & Operation Manual 8 2 Location Installation positions Figure 2-3 SCH Parallel Installations Figure 2-4 SCH Inclined Installations min. 15° - max. 70° 20°/40°/60° min. 15° - max. 70° Figure 2-5 SCH Freestanding Installations min.
SCH Collectors Installation & Operation Manual 2 Location (continued) Handling and storing Figure 2-6 Crane Transportation Connection Points and Positioning < 30° 6.
SCH Collectors Installation & Operation Manual 10 10 3 Roof Attachment Installation Roof attachment types Table 3A Roof Fastenings - Parts SOLAR ROOF MOUNTS Installation Type See Page Description .
SCH Collectors Installation & Operation Manual 11 SCH Collectors Installation & Operation Manual 3 Roof Attachment Installation (continued) Roof attachment quantities for SCH collectors snow l.
SCH Collectors Installation & Operation Manual 12 SCH Collectors Installation & Operation Manual Figure 3-1 Spacing Distance = = = a a a a x a = 2 - 10 in.
SCH Collectors Installation & Operation Manual 3 Roof Attachment Installation (continued) Double hanger bolt for universal fastening #SRM20001 Universal fixture for parallel and inclined installation on various roof types and freestanding installation on sufficiently anchored frames.
SCH Collectors Installation & Operation Manual SCH Collectors Installation & Operation Manual 14 3 Roof Attachment Installation Figure 3-4A Install Double Hanger Bolt Components HEX NUT W/FLANGE HANGER BOL T PLA TE HEX NUT W/FLANGE W ASHER (M12) HANGER BOL T SEAL HANGER BOL T min.
SCH Collectors Installation & Operation Manual SCH Collectors Installation & Operation Manual 15 • The anchors must be screwed into a support capable of bearing the required static load (generally rafters or concrete). • Complies with the requirements of DIN1055.
SCH Collectors Installation & Operation Manual 16 SCH Collectors Installation & Operation Manual Flat tile hook #SRM20005 The flat tile hook is only used for parallel installation on plain til.
SCH Collectors Installation & Operation Manual 17 SCH Collectors Installation & Operation Manual 3 Roof Attachment Installation (continued) Install flat tile hook 1. Determine roof type. Inspect the structural integrity of the roof and the durability of the roof materials.
SCH Collectors Installation & Operation Manual 18 SCH Collectors Installation & Operation Manual 3 Roof Attachment Installation Joint clamp #SRM20006 The joint clamp is only used for parallel .
SCH Collectors Installation & Operation Manual SCH Collectors Installation & Operation Manual 19 3 Roof Attachment Installation (continued) Universal cable securing kit #SRM20012 For securing inclined collectors on tin joint roofs comprising a guy cable, turnbuckle and hardware for collector frames and joint clamp for guy cable tensioning.
SCH Collectors Installation & Operation Manual SCH Collectors Installation & Operation Manual Flange plate shingle (standard) #SRM20007 The standard flange shingle plate is used for parallel and inclined installations on asphalt and elastomer roofs.
SCH Collectors Installation & Operation Manual SCH Collectors Installation & Operation Manual 21 3 Roof Attachment Installation (continued) Install flange plate shingle (standard) 1. Determine roof type. Inspect the structural integrity of the roof and the durability of the roof materials.
SCH Collectors Installation & Operation Manual 22 3 Roof Attachment Installation Flange plate shingle (raised) #SRM20008 The raised flange shingle plate is used for inclined installations on asphalt and elastomer roofs; also suitable for flat roofs.
SCH Collectors Installation & Operation Manual 23 3 Roof Attachment Installation (continued) Figure 3-27 Drill Holes and Attach Flange Plate COLLECTOR SUBSTRUCTURE HEX BOL T SQUARE DISK USE THE SMALLER SCREWS IN THE PERIMETER OF THE FLANGE PLA TE PRE-DRILL FOUR (4) 6 MM HOLES - USE THE LARGER SCREWS TO SECURE THE FLANGE PLA TE 8.
SCH Collectors Installation & Operation Manual Install metal roof attachment 1. Determine roof type. Inspect the structural integrity of the roof and the durability of the roof materials. 2. Determine the number of collectors needed for the installation and the number of required roof attachments from Table 3B or 3C on page 11.
SCH Collectors Installation & Operation Manual SCH Collectors Installation & Operation Manual 25 Wave roof attachment #SRM20014 & #SRM20015 The wave roof attachment is for parallel and inclined mounting on corrugated cement roofs.
SCH Collectors Installation & Operation Manual SCH Collectors Installation & Operation Manual 26 3 Roof Attachment Installation Figure 3-36 Attach Wave Roof Attachment Assembly and Hex Bolt HEX BOL T SQUARE DISK A TT ACH W A VE ROOF A TT ACHMENT ASSEMBL Y (W ASHER, ANGLE BRACKET AND SCREW) TO THE ROOF 7.
SCH Collectors Installation & Operation Manual 27 Figure 3-38 Pre-Drill 10 mm Hole & Attach to Concrete min. 2 1/4” min. 3” 22 ft./lbs. USE THE W ASHER AND NUT TO SECURE THE ANCHOR BOL T TO THE CONCRETE 6. Place the second nut and washer on the anchor bolt at the desired height (if using the anchor bolt with adjustments).
SCH Collectors Installation & Operation Manual 28 Installation & Operation Manual 4 Collector Installation Horizontal bar lengths Figure 4-1A Horizontal Bar Lengths 6’7” x x SCH065 = 9’1.
SCH Collectors Installation & Operation Manual SCH parallel mounting instructions 4 Collector Installation (continued) 1. Install roof attachments (see the Roof Attachment Section on pages 13 - 27 of this manual). 2. Install the horizontal bar(s) (FIG.
SCH Collectors Installation & Operation Manual 30 4 Collector Installation Figure 4-6 Secure Collector SQUARE DISK HEX BOL T 7. Position the collector on the horizontal bars so that the collector overhangs approximately 5mm (.2") (FIG. 4-7). Figure 4-7 Position Collector on Horizontal Bars 8.
SCH Collectors Installation & Operation Manual 31 4 Collector Installation (continued) 13. Remove the collector railing and install the Mechanical Connection Kit (FIG.’s 4-13 and 4-14). Note: Be sure to bend the tabs down on the Mechanical Connection Kit.
SCH Collectors Installation & Operation Manual 4 Collector Installation SCH inclined / non-south facing roof mounting instructions 1. Install roof attachment (see the Roof Attachment Section on pages 12 - 26 of this manual). 2. Install the horizontal bar(s) (FIG.
SCH Collectors Installation & Operation Manual 4 Collector Installation (continued) 10. Position the collector onto the substructure (FIG. 4-26). Figure 4-26 Position Collector On Substructure ENSURE .2” OVERHANG POSITION COLLECTOR ONTO SUBSTRUCTURE 11.
SCH Collectors Installation & Operation Manual 34 Installation & Operation Manual Figure 4-31 Install Mechanical Connection Kit BEND T ABS DOWN 18. Reinstall the collector railing removed in Step 17 (FIG. 4-32). Figure 4-32 Reinstall Collector Railing REINST ALL COLLECT OR RAILING OPTIONAL MECHANICAL CONNECTION KIT 19.
SCH Collectors Installation & Operation Manual 35 Table 4A Inclined and Non-South Facing Installations AB c d 20° 6 ft. 7 in. 24 in. 6 in. 4 in.
36 Installation & Operation Manual Part-number Description Needed quantities for: SCH065 SCH090 SCH110 SCH130 Parallel installation: SCA20001 Horizontal aluminum bar 10 ft 2 SCA20002 Horizontal al.
37 5 Hydraulic Connections Figure 5-2 Expansion Kits - Stacked CONNECTION EXPANSION SET, STACKED COLLECTOR IN SERIES Description Set for hydraulic connection of two collectors stacked, in series. Ready-to-fit corrugated stainless-steel pipe with two (2) soldered elbow joints for .
38 5 Hydraulic Connections Figure 5-3 Expansion Kits - Side by Side, Parallel Figure 5-4 Expansion Kits - Side by Side, Serial Expansion kits that are side by side in series are known to have a high pressure drop. A pressure drop calculation is recommended.
39 5 Hydraulic Connections (continued) Figure 5-5 Pressure Drop Chart SCH Collectors Installation & Operation Manual MODEL NO. RECOMMENDED FLOW (GPM) PRESSURE DROP (FT OF HD) SCH065 0.656 1.06 SCH090 0.872 1.66 SCH110 1.090 2.51 SCH130 1.300 3.59 NOTICE The above chart references recommended flow per collector.
40 Start-up 6 System Start-up SCH Collectors Installation & Operation Manual Check/control water chemistry Do not use petroleum-based cleaning or sealing compounds in the system. Damage to elastomer seals and gaskets in the system could occur, resulting in substantial property damage.
41 6 System Start-up (continued) SCH Collectors Installation & Operation Manual Clamp ring screw connections ■ Cut the copper pipe to length and deburr. ■ First, slide the clamp ring nut over the pipe, then clamp the ring itself. ■ Insert the prepared pipe into the screw connection until its stop is reached.
42 7 Maintenance WARNING Follow the service and maintenance procedures given throughout this manual and in component literature shipped with the solar components. Failure to perform the service and maintenance could result in damage to the solar system.
43 Typical properties of Aqueous Solutions+ (Glycol percentage by volume) 7 Maintenance (continued) Physical Property Temp. °F 30% Glycol Solution 40% Glycol Solution 50% Glycol Solution Thermal Conductivity Btu/(hr•ft 2 )(°F/ft) 40 0.247 0.225 0.
Revision Notes: Revision A (ECO #C06510) initial release. SCH-I-O Rev A 9/10.
Een belangrijk punt na aankoop van elk apparaat Lochinvar SCH-I-O (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen Lochinvar SCH-I-O heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens Lochinvar SCH-I-O vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding Lochinvar SCH-I-O leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over Lochinvar SCH-I-O krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van Lochinvar SCH-I-O bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de Lochinvar SCH-I-O kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met Lochinvar SCH-I-O . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.