EC/ECT Boilers Series Oil Installation, Operation & Maintenance Manual As an ENERGY ST AR ® Partner, PB Heat, LLC has determined that certain firing rates of this product meet the ENERGY ST AR ® guidelines for energy efficiency .
USING THIS MANUAL 1 A . INST ALLA TION CLEARANCE . . . . . . . . . . . . .1 B . SPECIAL A TTENTION BOXES . . . . . . . . . . . .1 1. PREINST ALLA TION 2 A . CLEARANCES . . . . . . . . . . . . . . . . . . . . . . . .2 B . AIR FOR COMBUSTION AND VENTILA TION .
1 A. INST ALLA TION CLEARANCE F ollow the installation instructions provided in this manual in the order shown. The order of these instructions has been set in order to provide the installer with a logical sequence of steps that will minimize potential interferences and maximize safety during boiler installation.
2 A. CLEARANCES Unit may be installed on combustible flooring, provided the boiler is not set on carpet and a metal drip pan is placed under the appliance. Unit may be installed in a closet with the above clearances. See also Section B, Air for Combustion and V entilation.
3 C. CHIMNEY / VENT AND DRAFT CONTROL 1. Draft Requirement – Minimum draft r equired in the vent system is -.03" to -.05" W .C. depending on boiler model, see T able 7.1 (Section 7). This draft is necessary to provide the necessar y draft over fire of -.
4 A. SETTING THE BOILER 1. Provide a level foundation, located as close as possible to the center of the heating system. 2. Refer to Figur e 2.2 for exploded view of boiler while checking and/or assembling parts of the boiler . 3. See clearance information in Section 1, "Pr einstallation.
5 BOILER PLA CEMENT AND ASSEMBL Y Figure 2.2: Boiler Exploded View (See T able 8.1 in Section 8 for parts identification)..
6 A. PRESSURE TEST BLOCK ASSEMBL Y 1. Make up cold water supply connection to the boiler . 2. Install pressur e gauge or pressure-temperatur e gauge in tapping provided. See Boiler Dimensional drawing, Figur e 7.1 (Section 7). 3. Plug all open tappings in the boiler and fill with water .
7 D . WA TER BOILER PIPING 1. Refer to the W ater Installation Sur vey and Hydronics Institute Residential Hydronic Heating Installation/Design Guide for Guidance. 2. The supply and return connections should be sized to suit the system. 3. Pipe the supply and r etur n in one of two ways as shown in Figur e 3.
8 E. T ANKLESS HEA TER OR COVERPLA TE 1. If a tankless coil is used (item 13 or 17), install as pictured. On water boilers, install in opening in front section. On steam boilers, install in opening in rear section. F or suggested piping of tankless water heaters refer to F igures 3.
9 F . CONTROLS 1. W ater Boiler Controls: Install the limit / operating control, pressur e- temperature gauge and safety r elief valve. See Figure 7.1 (Section 7) for proper location. F or installations subject to UL726, a second operating control that senses water temperature is also r equired (not provided).
10 A. GENERAL All electrical wiring shall be done in accordance with the National Electrical Code and Local Requirements. Single pole switches including those of safety controls or protective devices shall not be wired in a grounded line. B. BURNER WIRING 1.
11 Figure 4.3: Steam Boiler with Probe Low W ater Cut - Off Figure 4.2: Steam Boiler with Float Low Water Cut - Off ELECTRICAL.
12 ELECTRICAL Figure 4.5: Zoning with Circulators Figure 4.4: Water Boilers.
13 ELECTRICAL Figure 4.6: Zoning with Zone V alves Figure 4.7: Partner with Circulator.
14 BURNER SETUP & BOILER OPERA TION A. BURNER INST ALLA TION 1. The oil burner is supplied with a mounting flange fixed in position. 2. Mount the burner to the Bur ner Mounting Plate (item 3) with four (4) 5/16" studs and nuts provided.
15 BURNER SETUP & BOILER OPERA TION E. CLEAN THE BOILER (STEAM BOILERS ONL Y) 1. Clean the boiler within one week after initial start-up. Cleaning will be more effective if boiler operates a day or two to loosen sediment and impurities in system. 2.
16 BURNER SETUP & BOILER OPERA TION C ARLIN BURNER SPECIFIC A TIONS Boiler Model No . Firing Rate Burner Model No . Air Shutter Nozzle Size Pum p Pressure Start-up Settings Air Band Head Bar EC/ECT -03-075 .75 EZ-1HP Blank 0.60 70° B DEL³ 150 psig 0.
17 MAINTENANCE 6. MAINTENANCE W ARNING Product Saf ety Inf ormation Refractory Ceramic Fiber Product This appliance contains materials made from refractory ceramic fiber s (RCF). Airborne RCF , when inhaled, have been classified b y the International Ag ency f or Research on Cancer (IARC), as a possible carcinogen to humans.
18 MAINTENANCE A. GENERAL 1. Check pipes adjacent to cold walls or in unheated spaces. Insulate and tape them if necessary to be sure they can't fr eeze up.
19 MAINTENANCE 3. Remove any scale or soot from the combustion chamber area by vacuum cleaning or any other available means. 4. Replace flue collector and close burner mounting plate, making sure all gaskets ar e in place. 5. Replace jacket top panel.
20 BOILER DIMENSIONS & RA TINGS 7. BOILER DIMENSIONS & RA TINGS T APPING L OC A TIONS Location Size NPT W ater Steam H 3/4" N/A Low Limit Control I 3/4" Limit Control Pr essure Gauge.
21 BOILER DIMENSIONS & RA TINGS T able 7.1: Boiler Ratings ✸ As an ENERG Y ST AR ® Partner , PB Heat has determined that these firing rates meet the ENERGY ST AR guidelines for energy efficiency . ✝ All chimneys are 8" x 8" x 20' e xcept those models denoted with ( ✝ ), which are 8" x 12" x 20'.
22 R E PA I R PA R T S 8. REP AIR P ARTS Repair par ts are available from your installer or by contacting PB Heat, LLC, 131 S. Church, Bally , P A 19503. Note: Remember to include boiler model number and serial number when ordering par ts. T able 8.1 Item No .
23 NOTES.
24 NOTES.
EC/ECT Boilers Series Oil Installation, Operation & Maintenance Manual TO THE INST ALLER: This manual is the property of the owner and must be affixed near the boiler for future reference. TO THE OWNER: This boiler should be inspected annually by a Qualified Service Agency.
Een belangrijk punt na aankoop van elk apparaat PB Heat ECT Series (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen PB Heat ECT Series heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens PB Heat ECT Series vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding PB Heat ECT Series leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over PB Heat ECT Series krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van PB Heat ECT Series bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de PB Heat ECT Series kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met PB Heat ECT Series . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.