Gebruiksaanwijzing /service van het product GVIOM-5R van de fabrikant Smith Cast Iron Boilers
Ga naar pagina of 24
GVIOM-5R W ARNING: If the information in this manual is not f ollowed exactl y , a fire or explosion ma y result causing pr oper ty damge, personal injury or loss of life. Do not store or use gasoline or other flammab le vapors and liquids in the vicinity of this or any other appliance .
Page 2 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS A VER TISSMENT . Assurez-v ous de bien suivre les instructions données dans cette notice pour réduire au minim um le risque d’inc.
Page 3 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS The owner should maintain a record of all service work perf or med with the date and a description of the work done. Include the name of the service organization for future ref erence.
Page 4 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS COMBUSTIBLE FLOOR OPTION The GV100W boiler has been designed f or use on non- combustib le floors only . If a GV100W boiler is to be installed on combustib le flooring of any type, it MUST be installed using the special base designed by the Smith Cast Iron Boiler Co .
Page 5 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS EF D C B C A Clearances A B C D E F Alcove in 25 * 6 4 7 4 mm 635 * 152 102 178 102 Closet i n 2 526474 mm 635 51 152 102 178 102 T o Service in N/A N/A 6 4 10 10 mm N/A N/A 157 102 254 254 * No front wall f or alcov es.
Page 6 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS FRONT GRILL SPECIAL BASE INPUT BTUH Fresh Air 1⁄4" Wire Metal W ooden Duct Size Mesh Screen Louvers Louvers 3" x 12".
Page 7 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS 3 . Insof ar as is practical, close all building doors and windo ws and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the building.
Page 8 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS THIMBLE VENT SYSTEM CHIMNEY BOILER CONDENSATE DRAIN ASS'Y. THIMBLE LINER VENT SYSTEM CLEANOUT CHIMNEY BOILER V ent Connections to Chimneys Use T ype B1 or single wall metal v ent pipe from the boiler to the chimney .
Page 9 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS Horizontal v ent systems shall ter minate at least 4 ft , 1.3 m , below , 4 ft , 1.3 m , horizontally from or 1 ft , 0.23 m , abov e any door , window or gra vity air inlet into any building.
Page 10 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS FIG. NO . 5 Heating System Piping System Bypass For systems using a circulator on the return as either a single zone, or m ultiple zones with zone v alves, install a system b ypass line between the supply and return on the suction side of the circulator , see FIG.
Page 11 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS Pumped Blend An additional circulator can also be used to provide a return water temperature b lend. This method w orks well with systems with multiple zones with circulators , see FIG.
Page 12 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS INSTALL MANUAL SHUT-OFF VALVE 5 FT. ABOVE FLOOR WHERE REQUIRED BY LOCAL CODES GAS SUPPLY PIPING SEDIMENT TRAP OR DRIP LEG (TO EXTEND.
Page 13 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS Nominal Iron Pipe length Pipe Size 10' 20' 30' 40' 50' 60' 80' 100' 150' 3⁄4" 27.
FIG. NO . 13 Fenwal/Hone ywell Hot Surface Ignition Page 14.
Page 15 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS ADD JUMPER AS SHOWN TH-TR END SWITCH TH TR TH-TR END SWITCH TH TR TH-TR END SWITCH TH TR (HOT) 1 L2 L1 CIRCULATOR POWER SUPPLY 2 V8043F V8043F V8043F T87F ZONE 1 T87F ZONE 2 T87F ZONE 3 1 PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION AS REQUIRED.
Page 16 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS FOR Y OUR SAFETY READ BEFORE OPERA TING W ARNING : If you do not f ollow these instructions exactl y , a fire or e xplosion may result causing property damage, personal injury or loss of life.
Page 17 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS POUR V O TRE SÉCURITÉ LISEZ A V ANT DE METTRE EN MARCHE INSTRUCTIONS DE MISE EN MARCHE COÙPURE DE L'ARRIVE DE GAZ A LA CHA UDIERE A VERTISSEMENT .
Page 18 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS Direct Ignition Systems A . Connect a manometer having a minim um capacity of 10 in , 254 mm , WC to the outlet pressure por t of the gas valv e.
Page 19 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS If the computed rate de viates by more than 5% from the r ated input v alue of the unit adjust the gas valv e pressure accordingly . Do not adjust the manif old pressure by more than 5%.
Page 20 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS Heat Exchanger Cleaning Remov e the burners to protect them from falling rust and scale by f ollowing the Bur ner Remov al instructions. 1 . Remov e the vent pipe , front access and top panels.
Page 21 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS Controls/Burner s Refer to the BOILER OPERA TION and CHECKING and ADJUSTMENT sections in this manual. 1 . Check the thermostat for proper oper ation. 2 . If the boiler has been equipped with a low w ater cut-off device , L.
Page 22 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS GV100 SERIES REPAIR PARTS Number of Sections Ref # Name of Part Part No. 34567 1 Top, Rear, Inner Front and Front Panels 55763 1 557.
Page 23 GV100W BOILER INST ALLA TION & OPERA TING INSTR UCTIONS 5 Flue Collector/Drafthood 55513 1 55514 1 55515 1 55516 1 55517 1 6 Flue Baffle 55512 23456 7 Heat Exchanger/Assembled Block 69879 .
W ARNING Any appliance that b ur ns natural gas , propane gas, fuel oil, wood or coal is capab le of producing carbon monoxide (CO). Carbon mono xide (CO) is a gas which is odorless, colorless and tasteless but is very toxic. If your Smith boiler is not w or king properly , or is not vented properly , dangerous lev els of CO ma y accumulate.
Een belangrijk punt na aankoop van elk apparaat Smith Cast Iron Boilers GVIOM-5R (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen Smith Cast Iron Boilers GVIOM-5R heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens Smith Cast Iron Boilers GVIOM-5R vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding Smith Cast Iron Boilers GVIOM-5R leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over Smith Cast Iron Boilers GVIOM-5R krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van Smith Cast Iron Boilers GVIOM-5R bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de Smith Cast Iron Boilers GVIOM-5R kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met Smith Cast Iron Boilers GVIOM-5R . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.