Gebruiksaanwijzing /service van het product EG van de fabrikant Weil-McLain
Ga naar pagina of 28
P ar t No . 550-110-639/0703 Read all instructions before installing Installer Leave all instructions with boiler for future reference. Any claims for damage or shortage in shipment must be filed immediately against the transportation company by the consignee.
P art Number 550-110-639/0703 2 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL 1 Hazard definitions The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels, or to important information concerning the life of the product.
P art Number 550-110-639/0703 3 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL New construction or remodeled buildings are most often built tighter . W indows and door s ar e w eatherstripp ed, vapor barriers are used and openings in walls are caulked.
P art Number 550-110-639/0703 4 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Chimney or vent requirements (also refer to Breaching erection, Page 8) V enting must be installed acco rding to P ar t 7, V enting of Equipment, of National Fuel Gas Code ANSI Z223.
P art Number 550-110-639/0703 5 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Installation (continued) Installation clearances Suggested minimum clearances for servicing • 24 inches for cleaning and servicing, left side. • 18 inches for access to controls and components, front.
P art Number 550-110-639/0703 6 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Installation (continued) 1 Figure 3 Hydrostatic pressure test Pressur e test before attaching gas piping or electrical supply . 1 . Plug any necessary boiler tappings or openings.
P art Number 550-110-639/0703 7 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Installation (continued) 1 Installation of drawer assembly and front access panel and back base channel (Factory installed on PEG boilers - follow steps 2 and 3) 1 .
P art Number 550-110-639/0703 8 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Installation (continued) 1 Spill switch installation On EG 30-75 boilers only , fasten spill sw it ch to draft hood as shown on page 22, Dr a w ing R ef .
P art Number 550-110-639/0703 9 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL P iping connections 2 Pipe before installing controls. Connect return piping after jacket is attached. Connect supply piping before or after jacket is attached.
P art Number 550-110-639/0703 10 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL P iping connections (continued) 2 Bypass piping BYP ASS PIPING IS NO T NORMALL Y REQUIRED ON ANY BASEBO ARD SYSTEM Bypass piping should be used for the following installations.
P art Number 550-110-639/0703 11 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL P iping connections (continued) 2 Figure 15 Recommended piping connections EGH steam boilers Figure 14 Recommended piping connections EG steam boilers Steam boilers 1 .
P art Number 550-110-639/0703 12 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Install boiler controls 3 Failure to properly install, pipe and wire boiler controls may result in severe damage to the boiler , building and personnel.
P art Number 550-110-639/0703 13 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL EG and EGH boilers for tankless heater application are available only on special order as factory-installed optional equipment. Standard boilers cannot be adapted for heater use.
P art Number 550-110-639/0703 14 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Gas piping 5 Connecting gas supply piping Size gas piping considering : a. Diameter and length of gas supplying piping. b. Number of fittings. c . Maximum gas consumption (including any possible future expansion).
P art Number 550-110-639/0703 15 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Wiring 6 Refer to control supplement for additional information For y our safet y , turn off electrical power supply before making any electrical connections to avoid possible electrical shock hazard.
P art Number 550-110-639/0703 16 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Final adjustments 7 Filling water systems 1 . Close manual air vents, drain cock, and automatic air vent, if used. 2 . Fill to correct system pressure.
P art Number 550-110-639/0703 17 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Final adjustments (continued) 7 T o place in operation 1 . Be sure boiler has been co r rectly filled with water . 2. Follow lighting/operating inst ructions on boiler .
P art Number 550-110-639/0703 18 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Check - out procedure 8 Check-out procedure Check-off steps as completed.
P art Number 550-110-639/0703 19 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL 9 Service REMO V AL OF COMBUSTION CHAMBER LINING OR BASE P ANELS The combustion chamber lining or base insulation panels in this product contain ceramic fiber materials.
P art Number 550-110-639/0703 20 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Service (continued) 9 Also Refer to Additional Instructions Shipped With The Boiler For Specific Contr ol Operation and T r oubleshoot ing.
P art Number 550-110-639/0703 21 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Check pilot burner flames 1 . Proper pilot flame a ) Blue flame. b ) Inner cone engulfing pilot flame se nsor . c) Pilot flame sensor glows cherry red.
P art Number 550-110-639/0703 22 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL The boiler contains ceramic fiber and fiberglass materials. Use care when handling these materials per instructions on page 19 of this manual. Failure to c omply could r esult in severe personal inju r y .
P art Number 550-110-639/0703 23 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Replacement parts – EG (continued) 10 NOTE 1: Order sufficient quantities to replace all orifice.
P art Number 550-110-639/0703 24 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL The boiler contains ceramic fiber and fiberglass materials. Use care when handling these materials per instructions on page 19 of this manual. Failure to c omply could r esult in severe personal inju r y .
P art Number 550-110-639/0703 25 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL 10 Replacement parts – EGH (continued) NOTE 1 : Order sufficient quantities to replace all orifi.
P art Number 550-110-639/0703 26 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL 11 Data Dimensions EG Dimensions P-EG Dimensions EGH.
P art Number 550-110-639/0703 27 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Notes: * Add pr efix “P” for package boiler c o mpletely assembl e d and wired with jacket and controls (PEG-30-S through PEG-55-S only).
P art Number 550-110-639/0703 28 EG, PEG, EGH G AS - FIRED B OILERS — SERIES 4 — B OILER M ANU AL Standard equipment Factory-Assembled Section Block Insulated Extended Jacket Draft Hood Aluminized.
Een belangrijk punt na aankoop van elk apparaat Weil-McLain EG (of zelfs voordat je het koopt) is om de handleiding te lezen. Dit moeten wij doen vanwege een paar simpele redenen:
Als u nog geen Weil-McLain EG heb gekocht dan nu is een goed moment om kennis te maken met de basisgegevens van het product. Eerst kijk dan naar de eerste pagina\'s van de handleiding, die je hierboven vindt. Je moet daar de belangrijkste technische gegevens Weil-McLain EG vinden. Op dit manier kan je controleren of het apparaat aan jouw behoeften voldoet. Op de volgende pagina's van de handleiding Weil-McLain EG leer je over alle kenmerken van het product en krijg je informatie over de werking. De informatie die je over Weil-McLain EG krijgt, zal je zeker helpen om een besluit over de aankoop te nemen.
In een situatie waarin je al een beziter van Weil-McLain EG bent, maar toch heb je de instructies niet gelezen, moet je het doen voor de hierboven beschreven redenen. Je zult dan weten of je goed de alle beschikbare functies heb gebruikt, en of je fouten heb gemaakt die het leven van de Weil-McLain EG kunnen verkorten.
Maar de belangrijkste taak van de handleiding is om de gebruiker bij het oplossen van problemen te helpen met Weil-McLain EG . Bijna altijd, zal je daar het vinden Troubleshooting met de meest voorkomende storingen en defecten #MANUAl# samen met de instructies over hun opplosinge. Zelfs als je zelf niet kan om het probleem op te lossen, zal de instructie je de weg wijzen naar verdere andere procedure, bijv. door contact met de klantenservice of het dichtstbijzijnde servicecentrum.