NL
Zephyr logo
Officiële handleiding

Zephyr Z1C-00SL

6 pagina's·550 KB·Afzuigkap·PDF·EN
Zephyr Z1C-00SL
Inhoudsopgave 5 secties For use with Surface Is. range hood · DUCT COVER EXTENSION SPECIFICATION · MOUNTING THE DUCT COVER · Installation - Mounting the Duct Cover · … TonenVerbergen
Page 1 of the Zephyr Z1C-00SL user manual — For use with Surface Is. range hood
Pagina 1 · klik om te vergroten
Pagina 1

1.888.880.8368

Duct Cover Extension Z1C-00SL

For use with Surface Is. range hood

Zephyr Z1C-00SL — For use with Surface Is. range hood diagram (page 1)
Afb. 1 · For use with Surface Is. range hood
Zephyr Z1C-00SL — For use with Surface Is. range hood diagram (page 1)
Afb. 2 · For use with Surface Is. range hood

customer service

Page 2 of the Zephyr Z1C-00SL user manual — DUCT COVER EXTENSION SPECIFICATION
Pagina 2 · klik om te vergroten
Pagina 2

www.zephyronline.com

DUCT COVER EXTENSION SPECIFICATION

Zephyr Z1C-00SL — DUCT COVER EXTENSION SPECIFICATION diagram (page 2)
Afb. 3

Page 3 of the Zephyr Z1C-00SL user manual — MOUNTING THE DUCT COVER
Pagina 3 · klik om te vergroten
Pagina 3

MOUNTING THE DUCT COVER

Installation - Mounting the Duct Cover

1. Before installing the duct cover extension kit, take out the duct cover ceiling bracket fom the range hood packaging and remove the bracket by unscrewing the (4) screws.
2. Remove the duct cover from the hood assembly, according to the following steps: A - Take out the lower mantle by removing the (7) screws. Fig. 1
Zephyr Z1C-00SL — MOUNTING THE DUCT COVER diagram (page 3)
Afb. 4

B - Take out the spacer, by removing the (6) plus (4) metric screws and the bushes. Fig. 2

Zephyr Z1C-00SL — MOUNTING THE DUCT COVER diagram (page 3)
Afb. 5

C - Take out the two additional bushes that secure the glass. Fig. 3

Zephyr Z1C-00SL — MOUNTING THE DUCT COVER diagram (page 3)
Afb. 6
3. Take the lower duct cover from the duct cover extension kit and secure it to the hood assembly by following the instructions from step 2 in reverse order.
Page 4 of the Zephyr Z1C-00SL user manual — Installation - Mounting the Duct Cover
Pagina 4 · klik om te vergroten
Pagina 4

www.zephyronline.com

Installation - Mounting the Duct Cover

4. Remove the (2) screws to unlock the top support frame from the bottom support frame. Fig.4.
Zephyr Z1C-00SL — Installation - Mounting the Duct Cover diagram (page 4)
Afb. 7 · Installation - Mounting the Duct Cover
5. Secure the top support frame to the duct cover ceiling bracket by using the (4) screws. Fig. 5
6. Position hole template on the ceiling paying attention that the arrow is positioned on the same side as the range hood controls.

- Make 4 holes in the ceiling and drive in (3)

screws without completely tightening them. Pay attention not to insert the screw into the hole marked with an X on the hole template. Fig.6

7. Lift the hood assembly to the ceiling and align the top support frame and ceiling bracket with the (3) screws previously installed in the ceiling.

Rotate assembly slightly clockwise to lock in

place. Drive in the fourth screw and tighten the re-

maining 3 screws to secure the structure in place with con ulteriori (4) viti. Fig.6

8. Insert the bottom support frame into the top support frame. Fig.7
Zephyr Z1C-00SL — Installation - Mounting the Duct Cover diagram (page 4)
Afb. 8 · Installation - Mounting the Duct Cover
Page 5 of the Zephyr Z1C-00SL user manual — Installation - Mounting the Duct Cover
Pagina 5 · klik om te vergroten
Pagina 5

Installation - Mounting the Duct Cover

Adjust height by referring to the diagram in fi g.8.

Secure the support frames together using (2) screws per extension arm (8 total). Fig.9

Zephyr Z1C-00SL — Installation - Mounting the Duct Cover diagram (page 5)
Afb. 9 · Installation - Mounting the Duct Cover
9. Insert the motor housing into the support frame assembly and secure it using (8) screws. Fig.10
10. Connect the equipment to the power supply.
11. Secure the correct size ducting for your installation (not supplied) to the collar on top of the housing. Fig.11
12. Extend upper duct cover to the ceiling and secure it to the duct cover ceiling bracket using the (4) screws previously removed when the assembly was taken out of the packaging. Fig. 12
13. Lift the hood assembly into the top duct cover. Secure hood assembly to bottom support frame by using (4) screws. Fig. 13
14. Verify that ducting from hood is connected to ducting in the attic that will exhaust air out of the home.
Zephyr Z1C-00SL — Installation - Mounting the Duct Cover diagram (page 5)
Afb. 10 · Installation - Mounting the Duct Cover
Page 6 of the Zephyr Z1C-00SL user manual — 3FA0174
Pagina 6 · klik om te vergroten
Pagina 6

3FA0174

Bronnen

Referenties en links

Pagina's waarnaar wordt verwezen in deze handleiding — fabrikant, ondersteuning en downloads.

Vraag stellen over de Zephyr Z1C-00SL

Eigenaren en ons team reageren doorgaans binnen een dag — en uw vraag helpt ook de volgende persoon.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
Nog geen vragen over de Zephyr Z1C-00SL

Stel als eerste een vraag — andere eigenaren of ons team geven antwoord.

Origineel document

Zephyr Z1C-00SL handleiding-pdf

6 pagina's·550 KB·Afzuigkap·PDF
Klik op een bovenstaande pagina om deze hier te openen
Pagina 1 / …
100%
Pagina's laden…