NL
Elco logo
Officiële handleiding

Elco R3400

192 pagina's·5.4 MB·Boiler·PDF·ENJA
Elco R3400
Inhoudsopgave 65 secties R3400/R3500/R3600 · 05/2014 420010582400 · Operation and Installation manual for authorized technicians only R3400/R3500/R3600 · Safety General regulations Application Norms and regulations · … TonenVerbergen
R3400/R3500/R3600p.105/2014 420010582400p.1Operation and Installation manual for authorized technicians only R3400/R3500/R3600p.3Safety General regulations Application Norms and regulationsp.5EN 61000-3-2p.5Construction Layout of boiler Operating principlep.6Technical data Technical data R3401 - R3405p.7Technical data Technical R3406 - R3410p.8Technical data Dimensions R3401 - R3406p.9Technical data Dimensions R3407 - R3410p.10Technical data Technical data R3501 - R3505p.11Technical data Dimensions R3501 - R3505p.12Technical data Technical data R3600 - R3605 Standardp.13R3600 R3601 R3602 R3603 R3604 R3605p.13Max. water temperature (High limit thermostat) ºC 100p.13Power consumption boiler (excl. pump) W 420 900 1270p.13Weight (empty) kg 810 890 1040 1150 1280 1410p.13Technical data Dimensions R3600 - R3605 Standardp.14R3600p.14DN65 PN16p.14R 2"p.14Technical data Technical data R3600 - R3605 Split systemp.15Power consumption boiler (excl. pump) W 730 900 1270p.15Technical data Dimensions R3600 - R3605 Split systemp.16Extent of delivery Standard boiler Accessoriesp.17Installation Transportp.18R3402 R3501 R3601p.18R3403 R3502 R3602p.18R3404 R3503 R3603p.18R3405 R3504 R3604p.18R3406 R3505 R3605p.18Installation Removing the casingp.20Installation Boiler installationp.21Installation Connecting the boilerp.22Commissioning Water and hydraulic systemp.24[ºC] > 1.5 90 > 1.0 80p.24Commissioning Gas supply Condensate connection Flue and air intake connectionsp.25Commissioning Prepare boiler for first startupp.26Commissioning Combustion analysisp.27P19 : 100% ► 86%p.27Commissioning Air pressure switchp.28Commissioning Check water flowp.29∆p at nom. flow [kPa] 58 91 60 130 165p.29R3605p.29∆p at nom. flow [kPa] 48 56 38 45 53p.29Commissioning Check functionality of safety devices Gas tightness check Boiler shut downp.30Commissioning Commissioning protocolp.31Commissioning Protocol R3400/R3500/R3600p.31Output indicationsp.32Maintenance Checklist Replacing the electrodesp.33Maintenance Cleaning the condensate receptacle Cleaning and refilling the syphonp.34Maintenance Maintenance Protocolp.35Maintenance Protocol R3400/R3500/R3600p.35Lockoutsp.36Sensor valuesp.38Declaration of Conformityp.39Rendamax BV, Hamstraat 76, 6465 AG Kerkrade (NL),p.39declares that the productsp.39R3400/3500/3600p.39are in conformity with the following standards:p.39EN 60 335-1/ -2p.39and in accordance with the guidelines of directives:p.39CE – 0063AR3514p.39Kerkrade, 10-06-2013 A.J.G. Schuiling Plant Managerp.39Betriebsanleitung für die autorisierte Fachkraft R3400/R3500/R3600p.41
Page 1 of the Elco R3400 user manual — 05/2014 420010582400
Pagina 1 · klik om te vergroten
Pagina 1

R3400/R3500/R3600

Elco R3400 — R3400/R3500/R3600 diagram (page 1)
Afb. 1
Elco R3400 — R3400/R3500/R3600 diagram (page 1)
Afb. 2

Operation and Installation manual for authorized technicians only Betriebsanleitung für die autorisierte Fachkraft Bedienings- en Installatiehandleiding alleen voor bevoegde vakmensen Notice d’installation et d’emploi réservée à l’usage des techniciens agréés Istruzioni per l'uso solo per il tecnico autorizzato

Elco R3400 — R3400/R3500/R3600 diagram (page 1)
Afb. 3

05/2014 420010582400

Page 2 of the Elco R3400 user manual — R3400/R3500/R3600
Pagina 2 · klik om te vergroten
Pagina 2
Page 2 of the Elco R3400 user manual — R3400/R3500/R3600
Page 3 of the Elco R3400 user manual — 05/2014 420010582400
Pagina 3 · klik om te vergroten
Pagina 3

Operation and Installation manual for authorized technicians only R3400/R3500/R3600

05/2014 420010582400

Page 4 of the Elco R3400 user manual — Operation and Installation manual for authorized technicians only R3400/R3500/R3600
Pagina 4 · klik om te vergroten
Pagina 4
Page 4 of the Elco R3400 user manual — Operation and Installation manual for authorized technicians only R3400/R3500/R3600
Page 5 of the Elco R3400 user manual — EN 61000-3-2
Pagina 5 · klik om te vergroten
Pagina 5

Safety General regulations Application Norms and regulations

General regulations This documentation contains important information, which is a base for safe and reliable installation, commissioning and operation of the R3400/R3500/ R3600 boiler. All activities described in this document may only be excecuted by authorized companies. Changes to this document may be ef- fected without prior notice. We accept no obligation to adapt previously deliv- ered products to incorporate such changes. Only original spare parts may be used when replacing components on the boiler, otherwise warranty will be void. Application The R3400/R3500/R3600 boiler may be used for heating and hot water pro- duction purposes only. The boiler should be connected to closed systems with a maximum temperature of 100ºC (high limit temperature), maximum set- point temperature is 90ºC.

The R3400/R3500/R3600 boiler is CE approved and applies to the follow- ing European standards: 92 / 42 / EEC

EN 61000-3-2

Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current 16 A per phase) EN 61000-3-3

Boiler efficiency directive 90 / 396 / EEC

Electromagnetic compatibility (EMC) - Part 3-3: Limitation of voltage chang- es, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current 16 A per phase and not sub- ject to conditional connection EN 60335-1

Gas appliance directive 73 / 23 / EEC

Low voltage directive 89 / 336 / EEC

EMC directive EN 656

Household and similar electrical appli- ances - Safety - Part 1: General re- quirements EN 50165

Gas-fired central heating boilers – Type B boilers of nominal heat input exceeding 70 kW but not exceeding 300 kW EN 15417

Household and similar electrical appli- ances - Safety - Part 2-102: Particular requirements for gas, oil and solid- fuel burning appliances having electri- cal connections

Gas-fired central heating boilers - Specific requirements for condensing boilers with a nominal heat input greater than 70 kW but not exceeding 1000 kW EN 13836

Additional national standards GermanyRAL - UZ 61 / DIN 4702-8 Switzerland: SVGW EKAS-Form. 1942: Flüssiggas-

Norms and regulations When installing and operating the R3400/R3500/R3600 boiler, all applica- ble norms (european and local) should be fulfilled: Local building regulations for in-

Gas fired central heating boilers - Type B boilers of nominal heat input exceeding 300 kW, but not exceeding 1000 kW EN 15502-1

stalling combustion air and flue gas systems; Regulation for connecting the boiler to

Richtlinie Teil 2 Vorschriften der kantonalen Instanzen

(z.B. Feuerpoilizeivorschriften) Netherlands: (only applicable to R3401-R3406 and R3600-R3605) GASKEUR BASIS GASKEUR SV GASKEUR HR107 Belgium: HR TOP

the electrical appliance; Regulations for connecting the boiler

Gas-fired central heating boilers - Part 1: General requirements and tests EN 55014-1

to the local gas network; Norms and regulations according to

safety equipment for heating systems; Any additional local laws/regulations

Electromagnetic compatibility - Re- quirements for household appliances, electric tools and similar apparatus - Part 1: Emission EN 55014-2

with regard to installing and operating heating systems.

Electromagnetic compatibility - Re- quirements for household appliances, electric tools and similar apparatus - Part 2: Immunity - Product family standard

Page 6 of the Elco R3400 user manual — Construction Layout of boiler Operating principle
Pagina 6 · klik om te vergroten
Pagina 6

Construction Layout of boiler Operating principle

Elco R3400 — Construction Layout of boiler Operating principle diagram (page 6)
Afb. 4 · Construction Layout of boiler Operating principle

Layout of boiler The R3400/R3500/R3600 boiler con- sists of the following main components: 1 Return water connection 2 Flue gas connection 3 Water flow switch 4 Safety valve 5 Flow water connection 6 Filling/draining valve 7 Top plate 8 Plenum 9 Burner 10 1st Heat exchanger 11 Gas filter 12 2nd Heat exchanger 13 Gastrain 14 Frame 15 180° Bend 16 Compensator 17 Flue gas connection 18 Condensate receptacle 19 Flue gas receptacle 20 Combustion chamber 21 Entry electrical connections 22 Syphon 23 Main gas valve 24 Fan 25 Electrical box 26 Control panel 27 Casing 28 Air inlet damper 29 Butterfly valve 30 Main mixing channel 31 Pilot gas valve 32 Pilot mixing channel 33 Boiler pump 34 3rd Heat exchanger (only R3600) A Air B Gas C Flue gasses D Condensate

Elco R3400 — Construction Layout of boiler Operating principle diagram (page 6)
Afb. 5 · Construction Layout of boiler Operating principle

Operating principle The R3400/R3500/R3600 is a fully modulating boiler. The control unit of the boiler adapts the modulation ratio automatically to the heat demand re- quested by the system. This is done by controlling the speed of the fan. As a result, the Whirlwind mixing system will adapt the gas ratio to the chosen fan speed, in order to maintain the best possible combustion figures and there- with the best efficiency. The flue gases created by the combustion are trans- ported downwards through

the boiler and leave at the back side into the chimney connection. The return water from the system en- ters the boiler in the lower section, where is the lowest flue gas tempera- ture in the boiler. In this section con- densation takes place. The water is being transported upwards through the boiler, in order to leave the boiler at the top (burner) section. The cross flow working principle (water up, flue gas down) ensures the most efficient com- bustion results.

The KM628 control unit can control the boiler operation based on: fixed temperature (stand alone

operation); weather compensated operation (with

optional controller); with 0-10V external influence

(temperature or capacity) from a buil- ding management system.

Page 7 of the Elco R3400 user manual — Technical data Technical data R3401 - R3405
Pagina 7 · klik om te vergroten
Pagina 7

Technical data Technical data R3401 - R3405

R3401R3402R3403R3404R3405 Nominal heat output at 80-60ºC max/minkW656/164733/183857/213971/2421084/270 Nominal heat output at 75-60ºC max/minkW657/164734/183858/213972/2421085/270 Nominal heat output at 40/30ºC max/minkW663/181741/202867/236981/2681095/298 Nominal heat input Hi max/min*kW702/176784/196917/2291038/2601159/290 Efficiency at 80/60ºC%93.5 Efficiency at 40/30ºC%94.5 Annual efficiency (NNG 75/60ºC)%100.0 Annual efficiency (NNG 40/30ºC)%- Standstill losses (T = 70ºC) water%0.2 Max. condensate flowl/h- Gas consumption H-gas max/min (10,9 kWh/m3)m3/h64.5/16.271.9/18.084.1/21.095.2/23.8106.3/26.6 Gas consumption L-gas max/min (8,34 kWh/m3)m3/h84.3/21.194.0/23.5109.9/27.4124.4/31.2139.0/34.8 Gas consumption LPG. max/min (12,8 kWh/kg)kg/h54.9/13.861.2/15.371.6/17.981.1/20.390.5/22.6 Gas pressure H-gasmbar2035 Gas pressure L/LL-gasmbar2535 Gas pressure LPGmbar30/50 Maximum gas pressurembar100 Flue gas temperature at 80/60ºC max/minºC165/70 Flue gas temperature at 40/30ºC max/minºC135/60 Flue gas quantity max/min*m3/h1423/3561580/3951848/4622091/5232334/584 CO level main burner natural gas H/E/L/LL max/min 2%10.0/9.3 CO level main burner liguid gas P max/min 2%11.0/11.0 CO level pilot burner natural gas H/E/L/LL max/min 2%10.0/10.2 CO level pilot burner liguid gas P max/min 2%11.0/11.2 NOx level max/minmg/kWh61.4/22.0 CO level max/minmg/kWh9.8/3.3 Max. permissible flue resistance max/minPa150 Water volumel5053707580 Water pressure max/minbar8/1 Max. water temperature (High limit thermostat)ºC100 Maximum temperature setpointºC90 Nominal water flow at dT=20Km3/h28.531.637.041.846.8 Hydraulic resistance at nominal water flowkPa4653364350 Electrical connectionV400 FrequencyHz50 Mains connection fuseA1620 IP class-IP20 Power consumption boiler (excl. pump)W900900127012701270 Power consumption 3-step pump (optional)W9801010102014501500 Weight (empty)kg6757408409501070 Noise level at 1 meter distancedB(A)64 Ionisation current minimumµA6 PH value condensate-3.2 CE certification code-CE-0063AR3514 Water connections-DN65 PN16DN80 PN16 Gas connection-R 2”DN65 PN16 Flue gas connectionmm300350400 Air intake connection (for room sealed use)mm250300355 Condensate connectionmm40
Page 8 of the Elco R3400 user manual — Technical data Technical R3406 - R3410
Pagina 8 · klik om te vergroten
Pagina 8

Technical data Technical R3406 - R3410

R3406R3407R3408R3409R3410 Nominal heat output at 80-60ºC max/minkW1196/2981309/3261496/3731683/4191870/466 Nominal heat output at 75-60ºC max/minkW1197/2981310/3261498/3731685/4191872/466 Nominal heat output at 40/30ºC max/minkW1209/3291323/3601512/4121701/4631890/515 Nominal heat input Hi max/min*kW1279/3201400/3501600/4001800/4502000/500 Efficiency at 80/60ºC%93.5 Efficiency at 40/30ºC%94.5 Annual efficiency (NNG 75/60ºC)%100.0 Annual efficiency (NNG 40/30ºC)%- Standstill losses (T = 70ºC) water%0,2 Max. condensate flowl/h- Gas consumption H-gas max/min (10,9 kWh/m3)m3/h117.3/29.3128.4/32.1146.7/36.7165.1/41.3183.4/45.9 Gas consumption L-gas max/min (8,34 kWh/m3)m3/h153.4/38.4167.9/42.0191.8/48.0215.8/54.0239.8/60.0 Gas consumption LPG. max/min (12,8 kWh/kg)kg/h99.9/25.0108.7/27.2124.3/31.1139.8/35.0155.3/38.8 Gas pressure H-gasmbar3550 Gas pressure L/LL-gasmbar3550 Gas pressure LPGmbar30/5050 Maximum gas pressurembar100 Flue gas temperature at 80/60ºC max/minºC165/70 Flue gas temperature at 40/30ºC max/minºC135/60 Flue gas quantity max/min*m3/h2578/6452825/7063227/8073631/9084035/1009 CO level main burner natural gas H/E/L/LL max/min 2%10.0/9.3 CO level main burner liguid gas P max/min 2%11.0/11.0 CO level pilot burner natural gas H/E/L/LL max/min 2%10.0/10.2 CO level pilot burner liguid gas P max/min 2%11.0/11.2 NOx level max/minmg/kWh61.4/22.0 CO level max/minmg/kWh9.8/3.3 Max. permissible flue resistance max/minPa150 Water volumel8597109116123 Water pressure max/minbar8/1 Max. water temperature (High limit thermostat)ºC100 Maximum temperature setpointºC90 Nominal water flow at dT=20Km3/h51,656,164,172,180,1 Hydraulic resistance at nominal water flowkPa589160130165 Electrical connectionV400 FrequencyHz50 Mains connection fuseA20C25 IP class-IP20 Power consumption boiler (excl. pump)W12701910233025202770 Power consumption 3-step pump (optional)W150040007500 Weight (empty)kg12001210152516651745 Noise level at 1 meter distancedB(A)64 Ionisation current minimumµA6 PH value condensate-3.2 CE certification code-CE-0063AR3514 Water connections-DN80 PN16DN80 PN16 Gas connection-DN65 PN16DN80 PN16 Flue gas connectionmm400450500 Air intake connection (for room sealed use)mm355- Condensate connectionmm40
Page 9 of the Elco R3400 user manual — Technical data Dimensions R3401 - R3406
Pagina 9 · klik om te vergroten
Pagina 9

Technical data Dimensions R3401 - R3406

Dimensions R3401 R3402 R3403 R3404 R3405 R3406 L mm 2265 2265 2653 2653 2658 2658 L1 mm 595 595 610 615 615 770 L2 mm 700 700 1166 L3 mm 108 108 88 H mm 1355 H1 mm 1125 1125 1570 1420 1155 1377 B mm 1330 1330 1130 1130 1330 1330 B1 mm 1160 1210 1003 1053 1203 1253 B2 mm 665 665 565 565 665 665 B3 mm 170 120 127 77 127 77 B4 mm 1146 1146 946 946 1146 1146 B5 mm 115 65 115 65 115 65 D mm 300 350 350 400 400 400 W DN DN65 PN16 DN65 PN16 DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16 G R R 2" R 2" R 2" R 2" DN65 PN16 DN65 PN16 DimensionsR3401R3402R3403R3404R3405R3406 L mm226522652653265326582658 L1 mm595595610615615770 L2 mm7007001166116611661166 L3 mm10810888888888 H mm135513551355135513551355 H1 mm112511251570142011551377 B mm133013301130113013301330 B1 mm116012101003105312031253 B2 mm665665565565665665 B3 mm1701201277712777 B4 mm1146114694694611461146 B5 mm115651156511565 D mm300350350400400400 W DNDN65 PN16DN65 PN16DN80 PN16 G RR 2"R 2"R 2"R 2"DN65 PN16DN65 PN16
Elco R3400 — Technical data Dimensions R3401 - R3406 diagram (page 9)
Afb. 6 · Technical data Dimensions R3401 - R3406
Elco R3400 — Technical data Dimensions R3401 - R3406 diagram (page 9)
Afb. 7 · Technical data Dimensions R3401 - R3406
Page 10 of the Elco R3400 user manual — Technical data Dimensions R3407 - R3410
Pagina 10 · klik om te vergroten
Pagina 10

Technical data Dimensions R3407 - R3410

R3407 - R3408 R3409 - R3410 Dimensions R3407 R3408 R3409 R3410 L mm 2755 3265 3265 3265 L2 mm 1120 1630 1630 1630 B mm 1530 1330 1530 1530 B2 mm 1407 1207 1357 1407 B3 mm 765 665 765 765 B4 mm 126.5 126.5 176.5 126.5 B5 mm 1406 1206 1406 1406 B6 1140 940 1140 1140 D mm 450 450 500 500 W1 DN DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16 W2 DN DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16 G DN DN65 PN16 DN65 PN16 DN80 PN16 DN80 PN16 DimensionsR3407R3408R3409R3410 Lmm2755326532653265 L2mm1120163016301630 Bmm1530133015301530 B2mm1407120713571407 B3mm765665765765 B4mm126.5126.5176.5126.5 B5mm1406120614061406 B6114094011401140 Dmm450450500500 W1DNDN80 PN16DN80 PN16DN80 PN16DN80 PN16 W2DNDN80 PN16DN80 PN16DN80 PN16DN80 PN16 GDNDN65 PN16DN65 PN16DN80 PN16DN80 PN16
Elco R3400 — Technical data Dimensions R3407 - R3410 diagram (page 10)
Afb. 8 · Technical data Dimensions R3407 - R3410
Elco R3400 — Technical data Dimensions R3407 - R3410 diagram (page 10)
Afb. 9 · Technical data Dimensions R3407 - R3410
Elco R3400 — Technical data Dimensions R3407 - R3410 diagram (page 10)
Afb. 10 · Technical data Dimensions R3407 - R3410
Elco R3400 — Technical data Dimensions R3407 - R3410 diagram (page 10)
Afb. 11 · Technical data Dimensions R3407 - R3410
Elco R3400 — Technical data Dimensions R3407 - R3410 diagram (page 10)
Afb. 12 · Technical data Dimensions R3407 - R3410
Page 11 of the Elco R3400 user manual — Technical data Technical data R3501 - R3505
Pagina 11 · klik om te vergroten
Pagina 11

Technical data Technical data R3501 - R3505

R3501R3502R3503R3504R3505 Nominal heat output at 80-60ºC max/minkW613/175717/204811/231906/2581000/285 Nominal heat output at 75-60ºC max/minkW613/175717/204812/231907/2581001/285 Nominal heat output at 40/30ºC max/minkW624/195730/228826/258923/2881018/319 Nominal heat input Hi max/min*kW653/187764/218865/247966/2761066/305 Efficiency at 80/60ºC%93.8 Efficiency at 40/30ºC%95.5 Annual efficiency (NNG 75/60ºC)%102.2 Annual efficiency (NNG 40/30ºC)%- Standstill losses (T = 70ºC) water%0.3 Max. condensate flowl/h- Gas consumption H-gas max/min (10,9 kWh/m3)m3/h59.9/17.170.1/20.079.4/22.788.6/25.397.8/27.9 Gas consumption L-gas max/min (8,34 kWh/m3)m3/h78.3/22.491.6/26.2103.7/29.6115.8/33.1127.8/36.5 Gas consumption LPG. max/min (12,8 kWh/kg)kg/h51.0/14.659.7/17.167.6/19.375.5/21.683.3/23.8 Gas pressure H-gasmbar20 Gas pressure L/LL-gasmbar25 Gas pressure LPGmbar30/50 Maximum gas pressurembar100 Flue gas temperature at 80/60ºC max/minºC155/65 Flue gas temperature at 40/30ºC max/minºC120/55 Flue gas quantity max/min*m3/h1287/3681505/4301703/4871901/5432099/600 CO level main burner natural gas H/E/L/LL max/min 2%10.0/9.3 CO level main burner liguid gas P max/min 2%11.0/11.0 CO level pilot burner natural gas H/E/L/LL max/min 2%10.0/10.2 CO level pilot burner liguid gas P max/min 2%11.0/11.2 NOx level max/minmg/kWh11.5/19.5 CO level max/minmg/kWh27.3/6.5 Max. permissible flue resistance max/minPa150 Water volumel5370758085 Water pressure max/minbar8/1 Max. water temperature (High limit thermostat)ºC100 Maximum temperature setpointºC90 Nominal water flow at dT=20Km3/h26,430,834,939,043,0 Hydraulic resistance at nominal water flowkPa3725303540 Electrical connectionV400 FrequencyHz50 Mains connection fuseA1620 IP class-IP20 Power consumption boiler max/min (excl. pump)W9001270 Power consumption 3-step pump (optional)W9601000102014001500 Power consumption speed controlled pump (optional)W394375523557708 Weight (empty)kg74084095010701200 Noise level at 1 meter distancedB(A)64 Ionisation current minimumµA6 PH value condensate-3.2 CE certification code-CE-0063AR3514 Water connections-DN65 PN16DN80 PN16 Gas connection-R 2”DN65 PN16 Flue gas connectionmm300350400 Air intake connection (for room sealed use)mm250300355 Condensate connectionmm40
Page 12 of the Elco R3400 user manual — Technical data Dimensions R3501 - R3505
Pagina 12 · klik om te vergroten
Pagina 12

Technical data Dimensions R3501 - R3505

Dimensions R3501 R3502 R3503 R3504 R3505 L mm 2265 2653 2653 2658 2658 L1 mm 595 610 610 615 615 L2 mm 700 1166 L3 mm 108 88 H mm 1355 H1 mm 1125 1400 1400 1155 1155 B mm 1330 1130 1130 1330 1330 B1 mm 1210 1003 1053 1203 1253 B2 mm 665 565 565 665 665 B3 mm 120 127 77 127 77 B4 mm 1146 946 946 1146 1146 B5 mm 65 115 65 115 65 D mm 300 350 350 400 400 W DN DN65 PN16 DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16 G R R 2" R 2" R 2" DN65 PN16 DN65 PN16 DimensionsR3501R3502R3503R3504R3505 Lmm22652653265326582658 L1mm595610610615615 L2mm7001166116611661166 L3mm10888888888 Hmm13551355135513551355 H1mm11251400140011551155 Bmm13301130113013301330 B1mm12101003105312031253 B2mm665565565665665 B3mm1201277712777 B4mm114694694611461146 B5mm651156511565 Dmm300350350400400 WDNDN65 PN16DN80 PN16 GRR 2"R 2"R 2"DN65 PN16DN65 PN16
Elco R3400 — Technical data Dimensions R3501 - R3505 diagram (page 12)
Afb. 13 · Technical data Dimensions R3501 - R3505
Page 13 of the Elco R3400 user manual — Weight (empty) kg 810 890 1040 1150 1280 1410
Pagina 13 · klik om te vergroten
Pagina 13

Technical data Technical data R3600 - R3605 Standard

R3600 R3601 R3602 R3603 R3604 R3605

Nominal heat output at 80-60ºC max/min kW 572/142 639/182 747/212 846/241 945/269 1043/297

Nominal heat output at 75-60ºC max/min kW 576/144 643/184 753/215 852/243 952/272 1050/300

Nominal heat output at 40/30ºC max/min kW 602/159 672/203 786/237 890/268 994/300 1097/331

Nominal heat input Hi max/min* kW 585/146 653/187 764/218 865/247 966/276 1066/305

Efficiency at 80/60ºC % 97.8

Efficiency at 40/30ºC % 102.9

Annual efficiency (NNG 75/60ºC) % 105,1

Annual efficiency (NNG 40/30ºC) % 109,8

Standstill losses (Twater = 70ºC) % 0,3

Max. condensate flow l/h -

Gas consumption H-gas max/min (10,9 kWh/m3) m3/h 53.7/13.4 59.9/17.1 70.1/20.0 79.4/22.7 88.6/25.3 97.8/27.9

Gas consumption L-gas max/min (8,34 kWh/m3) m3/h 70.3/17.6 78.3/22.4 91.6/26.2 103.7/29.6 115.8/33.1 127.8/36.5

Gas consumption LPG. max/min (12,8 kWh/kg) kg/h 45.7/11.4 51.0/14.6 59.7/17.1 67.6/19.3 75.5/21.6 83.3/23.8

Gas pressure H-gas mbar 20

Gas pressure L/LL-gas mbar 25

Gas pressure LPG mbar 30/50

Maximum gas pressure mbar 100

Flue gas temperature at 80/60ºC max/min ºC 85/65

Flue gas temperature at 40/30ºC max/min ºC 59/36

Flue gas quantity max/min* m3/h 969/242 1076/307 1258/359 1424/407 1590/454 1756/502

CO2 level main burner natural gas H/E/L/LL max/min % 10.0/9.3 10.0/9.3

CO2 level main burner liguid gas P max/min % 11.0/11.0 11.0/11.0

CO2 level pilot burner natural gas H/E/L/LL max/min % - 10.0/10.2

CO2 level pilot burner liguid gas P max/min % - 11.0/11.2

NOx level max/min mg/kWh 32.3/18.8 11.5/19.5

CO level max/min mg/kWh 8.2/10.9 27.3/6.5

Max. permissible flue resistance max/min Pa 100 150

Water volume l 69 73 97 104 110 117

Water pressure max/min bar 8/1

Max. water temperature (High limit thermostat) ºC 100

Maximum temperature setpoint ºC 90

Nominal water flow at dT=20K m3/h 24,7 27,6 32,2 36,5 40,8 45,0

Hydraulic resistance at nominal water flow kPa 48 56 38 45 53 60

Electrical connection V 400

Mains connection fuse A 10 16 20

IP class - IP20

Power consumption boiler (excl. pump) W 420 900 1270

Power consumption 3-step pump (optional) W 940 980 1020 1400 1450 1500

Power consumption speed controlled pump (optional) W

471 616 561 661 867 956

Weight (empty) kg 810 890 1040 1150 1280 1410

Noise level at 1 meter distance dB(A) 64

Ionisation current minimum µA 6

PH value condensate - 3.2

CE certification code - CE-0063AR3514

Water connections - DN65 PN16 DN80 PN16

Gas connection - R 2” DN65 PN16

Flue gas connection mm 300 350 400

Air intake connection (for room sealed use) mm 250 300 355

Condensate connection mm 40

Frequency Hz 50

Page 14 of the Elco R3400 user manual — R 2"
Pagina 14 · klik om te vergroten
Pagina 14

Technical data Dimensions R3600 - R3605 Standard

Elco R3400 — Technical data Dimensions R3600 - R3605 Standard diagram (page 14)
Afb. 14 · Technical data Dimensions R3600 - R3605 Standard
Elco R3400 — Technical data Dimensions R3600 - R3605 Standard diagram (page 14)
Afb. 15 · Technical data Dimensions R3600 - R3605 Standard

Dimensions R3601 R3602 R3603 R3604 R3605

R3600

L mm 2265 2653 2653 2658 2658

L1 mm 595 610 610 615 615

L2 mm 590 1166

L3 mm 198 88

H mm 1405

H1 mm 1175 1450 1450 1205 1427

B mm 1330 1130 1130 1330 1330

B1 mm 1210 1003 1053 1203 1253

B2 mm 665 565 565 665 665

B3 mm 120 127 77 127 77

B4 mm 1146 946 946 1146 1146

B5 mm 65 115 65 115 65

D mm 300 350 350 400 400

D1 mm 250 250 300 300 355 355

W1 DN DN65 PN16 DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16

DN65 PN16

W2 DN DN65 PN16 DN65 PN16 DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16

G R R 2" R 2" R 2" DN65 PN16 DN65 PN16

R 2"

Page 15 of the Elco R3400 user manual — Power consumption boiler (excl. pump) W 730 900 1270
Pagina 15 · klik om te vergroten
Pagina 15

Technical data Technical data R3600 - R3605 Split system

R3600 R3601 R3602 R3603 R3604 R3605

Nominal heat output at 80-60ºC max/min kW 572/142 639/182 747/212 846/241 945/269 1043/297

Nominal heat output at 75-60ºC max/min kW 576/144 643/184 753/215 852/243 952/272 1050/300

Nominal heat output at 40/30ºC max/min kW 602/159 672/203 786/237 890/268 994/300 1097/331

Nominal heat input Hi max/min* kW 585/146 653/187 764/218 865/247 966/276 1066/305

Efficiency at 80/60ºC % 97.8

Efficiency at 40/30ºC % 102.9

Annual efficiency (NNG 75/60ºC) % 105,1

Annual efficiency (NNG 40/30ºC) % 109,8

Standstill losses (Twater = 70ºC) % 0,3

Max. condensate flow l/h -

Gas consumption H-gas max/min (10,9 kWh/m3) m3/h 53.7/13.4 59.9/17.1 70.1/20.0 79.4/22.7 88.6/25.3 97.8/27.9

Gas consumption L-gas max/min (8,34 kWh/m3) m3/h 70.3/17.6 78.3/22.4 91.6/26.2 103.7/29.6 115.8/33.1 127.8/36.5

Gas consumption LPG. max/min (12,8 kWh/kg) kg/h 45.7/11.4 51.0/14.6 59.7/17.1 67.6/19.3 75.5/21.6 83.3/23.8

Gas pressure H-gas mbar 20

Gas pressure L/LL-gas mbar 25

Gas pressure LPG mbar 30/50

Maximum gas pressure mbar 100

Flue gas temperature at 80/60ºC max/min ºC 85/65

Flue gas temperature at 40/30ºC max/min ºC 59/36

Flue gas quantity max/min* m3/h 969/242 1076/307 1258/359 1424/407 1590/454 1756/502

CO2 level main burner natural gas H/E/L/LL max/min % 10.0/9.3 10.0/9.3

CO2 level main burner liguid gas P max/min % 11.0/11.0 11.0/11.0

CO2 level pilot burner natural gas H/E/L/LL max/min % - 10.0/10.2

CO2 level pilot burner liguid gas P max/min % - 11.0/11.2

NOx level max/min mg/kWh 32.3/18.8 11.5/19.5

CO level max/min mg/kWh 8.2/10.9 27.3/6.5

Max. permissible flue resistance max/min Pa 100 150

Water volume l 73 73 97 104 110 117

Water pressure max/min bar 8/1

Max. water temperature (High limit thermostat) ºC 100

Maximum temperature setpoint ºC 90

Nominal water flow at dT=20K m3/h 24,7 27,6 32,2 36,5 40,8 45,0

Hydraulic resistance at nominal water flow kPa 48 56 38 45 53 60

Electrical connection V 400

Mains connection fuse A 10 16 20

IP class - IP20

Power consumption boiler (excl. pump) W 730 900 1270

Weight (empty) kg 810 890 1040 1150 1280 1410

Noise level at 1 meter distance dB(A) 64

Ionisation current minimum µA 6

PH value condensate - 3.2

CE certification code - CE-0063AR3514

Water connections - DN65 PN16 DN80 PN16

Gas connection - R 2” DN65 PN16

Flue gas connection mm 300 350 400

Air intake connection (for room sealed use) mm 250 300 355

Condensate connection mm 40

Frequency Hz 50

Page 16 of the Elco R3400 user manual — Technical data Dimensions R3600 - R3605 Split system
Pagina 16 · klik om te vergroten
Pagina 16

Technical data Dimensions R3600 - R3605 Split system

Elco R3400 — Technical data Dimensions R3600 - R3605 Split system diagram (page 16)
Afb. 16 · Technical data Dimensions R3600 - R3605 Split system

Dimensions R3600 R3601 R3602 R3603 R3604 R3605

L mm 1958 2070 2443

L2 mm 700 590 1166

L3 mm 108 198 88

H mm 1355 1405

B mm 1230 1330 1130 1130 1330 1330

B1 mm 1110 1210 1003 1053 1203 1253

B2 mm 615 665 565 565 665 665

B3 mm 120 120 127 77 127 77

B4 mm 1046 1146 946 946 1146 1146

B5 mm 100 65 115 65 115 65

D mm 300 300 350 350 400 400

D1 mm 250 250 300 300 355 355

W1 DN DN65 PN16 DN65 PN16 DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16

W2 DN DN65 PN16 DN65 PN16 DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16

W3 DN DN65 PN16 DN65 PN16 DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16

G R R 2" R 2" R 2" R 2" DN65 PN16 DN65 PN16

Page 17 of the Elco R3400 user manual — Extent of delivery Standard boiler Accessories
Pagina 17 · klik om te vergroten
Pagina 17

Extent of delivery Standard boiler Accessories

Standard boiler A boiler delivery package contains the following components:

Component Pcs. Package

R3400/R3500/R3600 Boiler fully assembled and tested 1 Mounted on wooden blocks with wooden border, sealed in PE foil Adjustable feet 4 Cardboard box on top of boiler (on R3407-R3410 already fitted to boiler) Syphon for condensate connection 1 Cardboard box on top of heatexchanger (under casing) Operation and Installation manual 1 Map attached to back panel of the boiler

Wiring diagram 1 Map attached to back panel of the boiler

Accessories On request it is possible to get various options and/or accessories. Ask your supplier for the possibilities.

Page 18 of the Elco R3400 user manual — R3402 R3501 R3601
Pagina 18 · klik om te vergroten
Pagina 18

Installation Transport

Elco R3400 — Installation Transport diagram (page 18)
Afb. 17 · Installation Transport

Boiler transport The R3400/R3500/R3600 boiler will be supplied as a complete unit being fully assembled and pre-tested. The boiler can be transported with a pallet truck (at least 1m wide), picking the boiler up from the side. Whenever necessary, the boiler can be dismantled into smaller parts for easier transport inside the building. The table below shows the main dismantled parts with their weight and dimensions.

When the R3400/R3500/R3600 boiler has to be transported with a crane, it is necessary to remove the casing before connecting the boiler to the crane. Al- ways connect the crane to the frame of the boiler by using straps.

1 Hoisting belt (4x) 2 Wooden retaining beam (2x) 3 Hoisting belt position (4x)

R3402 R3501 R3601

R3403 R3502 R3602

R3404 R3503 R3603

R3405 R3504 R3604

R3406 R3505 R3605

Burner m [kg] L [mm] W [mm]

135 1010 1150 420

135 1010 1150 420

140 1010 1310 500

210 1420 1010 500

215 1420 1110 500

220 1420 1210 500

225 1420 1310 500

1st Heat exchanger m [kg] L [mm] W [mm]

120 1010 1150 160

120 1030 1150 150

135 1010 1310 160

180 1420 1010 160

185 1420 1110 160

190 1420 1210 160

195 1420 1310 160

2nd Heat exchanger

m [kg] L [mm] W [mm]

135 1010 1150 160

135 1030 1050 150

150 1010 1310 160

200 1420 1010 160

200 1420 1110 160

210 1420 1210 160

210 1420 1310 160

3rd Heat exchanger (only R3600 series)

m [kg] L [mm] W [mm]

-

135 1030 1050 150

150 1010 1310 160

200 1420 1010 160

200 1420 1110 160

210 1420 1210 160

210 1420 1310 160

Frame H for R3600 in ( )

m [kg] L [mm] W [mm]

50 1325 1165 460

50 1325 1165 360

60 1630 1266 500 (370)

70 2004 1066 500 (370)

70 2004 1066 500 (370)

70 2004 1266 500 (370)

70 2004 1266 500 (370)

Condensate receptacle m [kg] L [mm] W [mm]

< 25 1320 990 400

< 25 1320 990 275

< 25 1450 1070 400

< 35 1950 770 400

< 35 1950 870 400

< 35 1950 970 400

< 35 1950 1070 400

Show 7 more labels / short text on this page
Component R3401 R3600 · H [mm] · H [mm] · H [mm] · H [mm] · H [mm] · H [mm]
Page 19 of the Elco R3400 user manual — Installation Transport
Pagina 19 · klik om te vergroten
Pagina 19

Installation Transport

Elco R3400 — Installation Transport diagram (page 19)
Afb. 18 · Installation Transport
Elco R3400 — Installation Transport diagram (page 19)
Afb. 19 · Installation Transport
Elco R3400 — Installation Transport diagram (page 19)
Afb. 20 · Installation Transport

Component R3407 R3408 R3409 R3410

Burner m [kg] L [mm] B [mm] H [mm]

230 1510 1400 600

385 2050 1250 600

390 2050 1350 620

395 2050 1450 620

1st Heat exchanger m [kg] L [mm] B [mm] H [mm]

200 1510 1425 150

325 2050 1250 150

330 2050 1350 150

335 2050 1450 150

2nd Heat exchanger

m [kg] L [mm] B [mm] H [mm]

220 1510 1425 150

365 2050 1250 150

370 2050 1350 150

375 2050 1450 150

m [kg] L [mm] B [mm] H [mm]

80 2010 1466 510

120 2525 1266 515

120 2525 1466 515

120 2525 1466 515

Condensate m [kg] L [mm] B [mm] H [mm]

< 40 2075 1175 350

< 55 2600 975 350

< 55 2600 1075 350

< 55 2600 1175 350

Frame

Page 20 of the Elco R3400 user manual — Installation Removing the casing
Pagina 20 · klik om te vergroten
Pagina 20

Installation Removing the casing

Elco R3400 — Installation Removing the casing diagram (page 20)
Afb. 21 · Installation Removing the casing

Boiler transport Remove the casing before transporting the boiler, in order to avoid damage to the casing parts during transportation. Removing the casing is done as fol- lows:

5. 4. 2.
Elco R3400 — Installation Removing the casing diagram (page 20)
Afb. 22 · Installation Removing the casing
Page 21 of the Elco R3400 user manual — Installation Boiler installation
Pagina 21 · klik om te vergroten
Pagina 21

Installation Boiler installation

Elco R3400 — Installation Boiler installation diagram (page 21)
Afb. 23 · Installation Boiler installation

Boiler installation The boiler should be positioned in a frost-proof boiler room. If the boiler room is on the roof, the boiler itself may never be the highest point of the instal- lation. When positioning the boiler, please note the recommended minimum clea- rance in the picture. When the boiler is positioned with less free space, mainte- nance activities will be more difficult. Once the boiler is in the correct posi- tion, the wooden blocks (1) should be removed and the adjustable feet (2) (with vibration absorption dampers) should be adjusted to the right height. Water and gas connections should be done after mounting the feet, as they effect the exact height of all connecti- ons.

Elco R3400 — Installation Boiler installation diagram (page 21)
Afb. 24 · Installation Boiler installation

The R3407- R3410 are not supplied on wooden blocks, but on wheels. After positioning the boiler, the adjustable feet have to be set to the correct height. The wheels have to be removed. The connections to the boiler have to be made after the feet have been ad- justed, as the adjustment will effect the exact height of all connections.

Page 22 of the Elco R3400 user manual — Installation Connecting the boiler
Pagina 22 · klik om te vergroten
Pagina 22

Installation Connecting the boiler

Connecting the boiler This chapter will explain how to make all connections to the boiler with regard to: Hydraulic connections (1, 3) Condensate drain connection (7) Gas connection (6) Flue gas connection (5) Air intake connection (only when

Elco R3400 — Installation Connecting the boiler diagram (page 22)
Afb. 25 · Installation Connecting the boiler

using roomsealed, order seperately) (2) Electrical connection (4) The boiler should always be connected in such a way, that the system applies to all relevant standards and regulati- ons (European, national and local). It’s the responsibility of the installer to en- sure that all standards and regulations are respected.

Hydraulic connections The boiler should always be connected in such a way, that water flow through the boiler can be ensured at all times. Connect the flow (3) and return (1) con- nection of the system tension free to the boiler connections. If the boiler is used in a system with two return cir- cuits (only R3600 series), the common return becomes the low temperature return, the 2nd return connection is the high temperature return (remove cap/ flange before connecting). Condensate connection (7) After filling with water, the syphon (included in delivery) should be in- stalled to the connection at the bottom of the condensate receptacle. The con- nection to the draining system should always be done with an open connec- tion, in order to avoid a flooding of the boiler in case of a blocked drain.

Elco R3400 — Installation Connecting the boiler diagram (page 22)
Afb. 26 · Installation Connecting the boiler
Page 23 of the Elco R3400 user manual — Installation Connecting the boiler
Pagina 23 · klik om te vergroten
Pagina 23

Installation Connecting the boiler

Elco R3400 — Installation Connecting the boiler diagram (page 23)
Afb. 27 · Installation Connecting the boiler

Gas connection (6) The gas connection must be made by an authorized installer in accordance with the applicable national and local standards and regulations. Connect the gas line from the system tension free to the gas connection (6) of the boiler. A gas cock should be mounted directly behind the boiler. A gas filter can be mounted directly on the gas connection of the boiler. Flue gas connection (5) Regulations for the construction of flue gas systems are very different for each country. It should be ensured that all national regulations with regard to flue gas systems are respected. Connect the flue gas system to the flue gas connection (5) of the boiler, use fluegas systems with seamless connec- tions only. It’s not necessary to make a separate condensate drain for the flue gas system, as the condensate will be drained via the syphon of the boiler. Please note the following issues:

It’s recommended to use stainless

steel systems The diameter of the flue gas system

must be chosen by calculation ac- cording to the national regulations Construct the flue gas system as

short as possible (for maximum length see planner documentation) Construct horizonal ways with a mini-

mum angle of 3º Air intake connection (3) When using the boiler roomsealed. The air intake can be connected if the boiler was ordered as roomsealed. The dia- meter should be calculated according to the national regulations, together with the flue gas system. The total re- sistance of both systems should never overcome the maximum permissible resistance of the fan inside the boiler (see also chapter: Technical data). .

Elco R3400 — Installation Connecting the boiler diagram (page 23)
Afb. 28 · Installation Connecting the boiler
Elco R3400 — Installation Connecting the boiler diagram (page 23)
Afb. 29 · Installation Connecting the boiler

Electrical connection (4) The electrical connection must be ma- de by an authorized installer in accordance with the applicable national and local standards and regulations. For the power supply it’s necessary to use a mains isolator switch with a con- tact opening of at least 3 mm within the boiler room. This switch can be used to switch off the power supply for maintenance purposes. Cables can be inserted through the cable trays and glands at the back of the electrical panel at the front of the boiler. Connect all wires to the terminals ac- cording to the wiring diagram of the boiler (enclosed in map attached to back panel of the boiler).

Elco R3400 — Installation Connecting the boiler diagram (page 23)
Afb. 30 · Installation Connecting the boiler
Elco R3400 — Installation Connecting the boiler diagram (page 23)
Afb. 31 · Installation Connecting the boiler
Page 24 of the Elco R3400 user manual — [ºC] > 1.5 90 > 1.0 80
Pagina 24 · klik om te vergroten
Pagina 24

Commissioning Water and hydraulic system

Commissioning of the boiler should be carried out by authorized personnel only. Failure to respect this condition makes the guarantee void. A protocol of the commissioning should be filled out (see end of this chapter for example of commissioning protocol).

This chapter explains the commissio- ning of the boiler with the standard boi- ler controller. When an additional sys- tem controller is installed, please refer to its manual for commissioning the controller.

Max. sum of alkaline earths

Max. total hardness

Water quality The system should be filled with water with a PH value between 8,0 and 9,5. The chloride value of the water should not exceed 50 mg/l. Entry of oxygene by diffusion should be prevented at all times. Damage to the heat exchanger because of oxygene diffusion will not be taken under warranty.

600. 2000 1.5 8.4

In installations with higher water volu- mes, it’s necessary to respect the maxi- mum filling and additional volumes with corresponding hardness values as sta- ted in the german VDI2035 standard. In the table you can find the nominal va- lues for filling and additional water for the R3400/R3500/R3600 according to the the VDI2035.

The table at the left gives an indication of the relation between the water quali- ty and the maximum water filling volu- me during the lifetime of the boiler. Consult the original text of the VDI2035 for more detailed information.

Capacity of installation Q (kW)

Ca(HCO3)2

600 800 1000 1200 1400 1600 1800

dºH Maximum water (re)fill volume Vmax [m3]

≤0.5 ≤2.8 - - - 75.1 87.6 100.2 122.7

1.0 5.6 - - - 37.6 43.8 50.1 56.3

1.5 8.4 12.0 16.7 20.9 25.0 29.2 33.4 37.6

2.0 11.2 9.4 12.5 15.7 18.8 21.9 25.0 28.2

2.5 14.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5

≥3.0 ≥16.

8 6.3 8.3 10.4 12.5 14.6 16.7 18.8

Elco R3400 — Commissioning Water and hydraulic system diagram (page 24)
Afb. 32 · Commissioning Water and hydraulic system

Water pressure Open the valves to the system. Check the water pressure in the system. If the water pressure is too low (see table below), increase the pressure up to at least the minimum required water pressure in the table. Filling can be done via the fill and drain valve (2) on the return connection (1) of the boiler.

Hydraulic system Check if the boiler is hydraulically con- nected to the system in such way, that water flow can be secured at all times during burner operation. The water flow is supervised by the water flow switch in the boiler and a lack of flow will lead to a direct burner stop and lockout of the boiler.

[ºC] > 1.5 90 > 1.0 80

Show 12 more labels / short text on this page
Boiler output · [kW] · [mol/m3] · [dºH] · Concentrate · mol/ · m3 · Minimum operating · Flow tem- · pressure · perature · [bar]
Page 25 of the Elco R3400 user manual — Commissioning Gas supply Condensate connection Flue and air intake connections
Pagina 25 · klik om te vergroten
Pagina 25

Commissioning Gas supply Condensate connection Flue and air intake connections

Elco R3400 — Commissioning Gas supply Condensate connection Flue and air intake connections diagram (page 25)
Afb. 33 · Commissioning Gas supply Condensate connection Flue…

Gas supply Check the gas supply connection to the boiler for tightness. If any leakage is found, reseal the leakage before star- ting the boiler! Remove any air between the gas valve and the gas line. This can be done at the test point (1) at the gas pressure switch. Don’t forget to close the test point afterwards! Check the gas type and values with the local gas company, in order to know for which gas type the boiler should be commissioned.

Elco R3400 — Commissioning Gas supply Condensate connection Flue and air intake connections diagram (page 25)
Afb. 34 · Commissioning Gas supply Condensate connection Flue…

Condensate connection Remove the syphon (2) from the con- densate connection. Fill it with water and place it back in the original posi- tion. Make sure the syphon is filled before starting the boiler, in order to prevent flue gases dischar- ging through the condensate connec- tion!

Flue and air intake connections Check whether the flue and air intake systems are made according to the national and local regulations. Installati- ons which don’t comply with the regula- tions, are not allowed to be commissio- ned. Make sure that all connections are free. The size of flue gas and air intake con- nections may not be reduced.

Page 26 of the Elco R3400 user manual — Commissioning Prepare boiler for first startup
Pagina 26 · klik om te vergroten
Pagina 26

Commissioning Prepare boiler for first startup

Elco R3400 — Commissioning Prepare boiler for first startup diagram (page 26)
Afb. 35 · Commissioning Prepare boiler for first startup

Prepare boiler for first startup Open gas connection; Switch on mains isolator switch for

Elco R3400 — Commissioning Prepare boiler for first startup diagram (page 26)
Afb. 36 · Commissioning Prepare boiler for first startup

power supply to the boiler; Switch on boiler with on/off switch (1)

Make sure the boiler remains in

Elco R3400 — Commissioning Prepare boiler for first startup diagram (page 26)
Afb. 37 · Commissioning Prepare boiler for first startup

standby operation K (2) use rotational switch (3); Check the pump operation: make

sure that the direction of the rotation is correct; Remove any air from the pump by

removing the end cap of the pump motor housing. It’s recommended to keep the boiler at 50% load for a while after the first startup, as this is the easiest base for starting the combustion analysis. This can be assured as follows: Open the lid of the boiler controller; Use rotational switch (3) for going to

Elco R3400 — Commissioning Prepare boiler for first startup diagram (page 26)
Afb. 38 · Commissioning Prepare boiler for first startup

parameter P9 in the menu; Change P9 (5) into 50% (push

programming button (4), change value with rotational switch (3), push programming button (4) to confirm); Close the lid of the boiler controller.

Page 27 of the Elco R3400 user manual — P19 : 100% ► 86%
Pagina 27 · klik om te vergroten
Pagina 27

Commissioning Combustion analysis

Elco R3400 — Commissioning Combustion analysis diagram (page 27)
Afb. 39 · Commissioning Combustion analysis

Combustion check at full load Start the boiler at service mode for full load operation (W2). When you have reduced P9 to 50% (see previous chapter), the boiler will operate at 50% load. Allow the boiler to stabilise the combustion for 3 minutes. Then increase P9 step by step up to 100%. Check the gas pressure on the inlet of the gas valve while increasing the boiler load: the gas pressure should never go below the minumum required value see technical data. Set the minimum gas pressure switch (1) at 50% of the required gas pressure. First check the combustion values of the pilot burner using the measuring tube on the back of the boiler (3). If required the values can be corrected with the adjustment screw on the pilot gas valve (2). Then check the combustion values of the main burner using a measuring point in the flue (4). If required the va- lues can be corrected with the adjust- ment screw (V) on the main gas valve (5).

Combustion settings for natural gas G20 / G25 All boilers CO2, max % 10.0 ± 0.2 COmax ppm < 1000

CO2, min % 10.2 ± 0.2

COmin ppm < 1000

Elco R3400 — Commissioning Combustion analysis diagram (page 27)
Afb. 40 · Commissioning Combustion analysis

P19 : 100% ► 86%

All boilers CO2, max % 11.0 ± 0.2 COmax ppm < 1000 CO2, min % 11.2 ± 0.2 COmin ppm < 1000

Elco R3400 — P19 : 100% ► 86% diagram (page 27)
Afb. 41

Combustion check at minimum load Switch the boiler to service mode for minimum load operation (W1). Check the combustion settings the same way as described for full load. The combustion settings for the pilot burner can be adjusted using the adjustment screw on the pilot gas valve (6). The combustion settings for the main burner can be adjusted using the adjustment screw (N) on the main gas valve (7).

Combustion settings for natural gas G20 / G25 All boilers CO2, max % 10.0 ± 0.2 COmax ppm < 30

CO2, min % 9.3 ± 0.2

COmin ppm < 30

Combustion check at 50% load An additional reference check of com- bustion values at 50% load is recom- mended in order to check if the gas valve is set in such way, that the modu- lating behaviour is normal. The CO2 value should be in between the settings of full load and minumum load. CO value should be equal to full load and minimum load values. Make sure parameter P9 is set back to 100 and switch the boiler to automatic operation (F) after the combustion test is finished.

Elco R3400 — P19 : 100% ► 86% diagram (page 27)
Afb. 42

P19 : 100% ► 86%

All boilers CO2, max % 11.0 ± 0.2 COmax ppm < 30 CO2, min % 11.0 ± 0.2 COmin ppm < 30

Show 10 more labels / short text on this page
Pilot burner · Pilot burner · Combustion settings · for LPG G31 · Parameter change required · Main burner · Main burner · Combustion settings · for LPG G31 · Parameter change required
Page 28 of the Elco R3400 user manual — Commissioning Air pressure switch
Pagina 28 · klik om te vergroten
Pagina 28

Commissioning Air pressure switch

Elco R3400 — Commissioning Air pressure switch diagram (page 28)
Afb. 43 · Commissioning Air pressure switch

Adjustment Air pressure switch Connect a pressure gauge to the indi- cated measuring points on the switch (1). Start the boiler at service mode for minimum load operation (W1). Measure the pressure differential across the switch, this should be ≈ 0.8 mbar. Turn the dial on the switch (2) counter- clockwise until the end. Reduce the setting on parameter P17 step by step until the pressure differential is 0.4 mbar. Slowly turn the dial on the switch clockwise until the boiler goes to lock- out. Set P17 back to its original setting!! Reset the lockout. Restart the boiler and check if the switch contact closes at 0.4 mbar (indicator at DW in display of the boiler controller (3). If required, repeat the above procedure.

Elco R3400 — Commissioning Air pressure switch diagram (page 28)
Afb. 44 · Commissioning Air pressure switch
Elco R3400 — Commissioning Air pressure switch diagram (page 28)
Afb. 45 · Commissioning Air pressure switch
Page 29 of the Elco R3400 user manual — R3605
Pagina 29 · klik om te vergroten
Pagina 29

Commissioning Check water flow

Check water flow The water flow through the boiler can be checked with two different methods shown below. ∆T measurement Check the temperature difference over the boiler (∆T flow-return) when the boiler is running on 100% load. The nominal ∆T is 20K and must be at least between 15K and 25K for secure boiler operation. An indication of the actual flow rate can be found with the follo- wing calculation (see table below for nominal data):

qactual = (∆Tnominal / ∆Tmeasured) * qnominal [m3/h]

∆p measurement Check the pressure difference over the boiler (∆p flow-return) when the boiler pump is running (burner on is not requi- red). The nominal ∆p for each boiler type can be found in the table below, actual ∆p must be within: 0.35*∆pnom ≤ ∆P ≤ 1.75*∆pnom . An indi- cation of the actual flow rate can be found with the following calculation (see table below for nominal data):

qactual = √(∆pmeasured / ∆pnominal) * qnominal [m3/h]

Flow rate R3401 - R3405 at ∆T 20K R3401 R3402 R3403 R3404 R3405 Nominal flow [m3/h] 28.5 31.6 37.0 41.8 46.8 ∆p at nom. flow [kPa] 46 53 36 43 50

Flow rate R3406 - R3410 at ∆T 20K R3406 R3407 R3408 R3409 R3410 Nominal flow [m3/h] 51,6 56,1 64,1 72,1 80,1

∆p at nom. flow [kPa] 58 91 60 130 165

Flow rate R3501 - R3505 at ∆T 20K R3501 R3502 R3503 R3504 R3505 Nominal flow [m3/h] 26,4 30,8 34,9 39,0 43,0 ∆p at nom. flow [kPa] 37 25 30 35 40

Flow rate R3600 - R3605 at ∆T 20K R3600 R3601 R3602 R3603 R3604 Nominal flow [m3/h] 24,7 27,6 32,2 36,5 40,8

R3605

∆p at nom. flow [kPa] 48 56 38 45 53

45,0

Page 30 of the Elco R3400 user manual — Commissioning Check functionality of safety devices Gas tightness check Boiler shut down
Pagina 30 · klik om te vergroten
Pagina 30

Commissioning Check functionality of safety devices Gas tightness check Boiler shut down

Elco R3400 — Commissioning Check functionality of safety devices Gas tightness check Boiler shut down diagram (page 30)
Afb. 46 · Commissioning Check functionality of safety devices…

Check functionality of safety devices All safety devices have to be checked on good functioning. Safety devices on a standard boiler are a water flow tem- perature sensor, water flow switch, minimum gas pressure switch and ioni- sation electrode. These devices can be checked as described below.

Ionisation electrode (6) Remove electrical connection from the ionisation electrode while the boiler is running, the boiler will go in lockout no.5. The boiler will try to restart. With the electrical connection removed, the restart will result in lockout no. 4. When the connection is already mounted, the restart will be successful. Measuring the ionisation current can be done by mounting a multi-meter (set to µA) in between the ionisation elec- trode and its electrical connection. The ionisation current should always be above 1.2 µA, in normal conditions it will be 6 µA and above.

Water flow temperature sensor (1) Disconnect the plug from the sensor while the boiler is switched on. This should result in a lockout no. 12. The lockout should disappear as soon as the plug is placed back in position, the boiler will restart. Water flow switch (2) Close (slowly!) the valve in the flow connection to the system while the boi- ler is running on minimum load. When the valve is almost closed and the water flow is insufficient, the water flow switch will switch off and the boiler will go in lockout 40. Open the valve. A manual reset is necessary. Minimum gas pressure switch (4) Close the gas cock when the boiler is in standby position (K). Open the test point on the gas valve (3) while meas- uring the gas pressure on the test point of the gas pressure switch (5). The boiler will go in lockout no. 2 when the switch off setting is achieved. Close both test points and open the gas cock.

Elco R3400 — Commissioning Check functionality of safety devices Gas tightness check Boiler shut down diagram (page 30)
Afb. 47 · Commissioning Check functionality of safety devices…

Gas tightness check Check the gas tightness of all sealed connections with an approved soap or electronic gas analyzer, for example: Test points Bolt connections Gaskets of mixing system, etc.

Elco R3400 — Commissioning Check functionality of safety devices Gas tightness check Boiler shut down diagram (page 30)
Afb. 48 · Commissioning Check functionality of safety devices…

Boiler shut down When the boiler will not be used for longer periods, shut down the boiler by following procedure: Switch the boiler in standby operation

Elco R3400 — Commissioning Check functionality of safety devices Gas tightness check Boiler shut down diagram (page 30)
Afb. 49 · Commissioning Check functionality of safety devices…

(K) Switch off the boiler with the on/off

switch (7) Disable power supply to the boiler by

deactivating the mains isolator switch in the boiler room Close the gas supply to the boiler.

Page 31 of the Elco R3400 user manual — Commissioning Protocol R3400/R3500/R3600
Pagina 31 · klik om te vergroten
Pagina 31

Commissioning Commissioning protocol

Commissioning Protocol R3400/R3500/R3600

Project Boiler type Project Serial number Address Year City Nominal load (Hi) [kW] Date Nominal output (Hi) [kW] Engineer System Water pressure [bar] Installati- on:

Roof top Water pH [-] Ground floor Water hardness [dºH] Basement Water chloride [mg/l] Other: Water ∆T full load [ºC] Low velocity header Water ∆pboiler [kPa] Plated heat exchanger Water flow [m3/h] Bypass boiler Pump setting [-] Other: Safety devices High limit setting [ºC] Water flow sensor checked Temp. limiter setting [ºC] Water flow switch checked Min. gas pressure switch setting [mbar] Ignition time burner [sec] Combustion analysis 100% load 50% load Min. load Gas consumption [m3/h] [m3/h] [m3/h] Gas pressure [mbar] [mbar] [mbar] CO2 pilot burner [%] [%] [%] O2 pilot burner [%] [%] [%] CO pilot burner [ppm] [ppm] [ppm] NOx pilot burner [ppm] [ppm] [ppm]

Hydrau- lics:

CO2 main burner [%] [%] [%] O2 main burner [%] [%] [%] CO main burner [ppm] [ppm] [ppm] NOx main burner [ppm] [ppm] [ppm]

Tatmospheric [ºC] [ºC] [ºC] Tfluegas [ºC] [ºC] [ºC] Twater, flow [ºC] [ºC] [ºC] Twater, return [ºC] [ºC] [ºC] Ionisation current [µA] [µA] [µA] pfan [mbar] [mbar] [mbar] ptop panel [mbar] [mbar] [mbar] pcombustion chamber [mbar] [mbar] [mbar] Parameter settings P1 Setpoint temperature heating [ºC] P12 Boiler hysteresis [ºC] P2 Setpoint temperature DHW [ºC] P17 Fan speed min. load [%] P11 Maximum boiler setpoint [ºC] P19 Fan speed 100% load [%] Remarks

Page 32 of the Elco R3400 user manual — Output indications
Pagina 32 · klik om te vergroten
Pagina 32

Operating instructions Main menu (operating mode) Parameter menu (information/programming mode) Changing parameter values

The boiler controller has two menus: the main menu (operating mode) when the lid is closed, and the parameter menu (information/programming mode) when the lid is open. Both menus and possibilities are explained in the next paragraphs.

Main menu (operating mode) lid closed With the lid closed and by using the rotational switch (1) clockwise or anticlockwise the boilers’ operating mode (2) can be set. The available modes are: K Standby mode (only frost protection) F Automatic operation mode (heating and DHW) F Summer mode (only DHW, no heating) W1 Service mode minimum load W2 Service mode full load (limited by P9) Besides the operating mode, the display also shows the actual water flow tempera- ture (3) and, in case of a lockout, a warning triangle (4) combined with a lockout code (5). The explanation of the lockout codes can be found in chapter “Lockouts”.

2 5 3 4 1

Elco R3400 — 2 5 3 4 1 diagram (page 32)
Afb. 50

Parameter menu (information/programming mode) lid open With the lid open and by using the rotational switch (1) clockwise or anticlockwise it’s possible to read/change certain values/parameters from the boiler controller. An arrow at the bottom of the display (2) indicates which parameter has been se- lected. The available values/parameters are: P1 Actual / setpoint water flow temperature [ºC] P2 Actual / setpoint DHW temperature [ºC] P3 Actual temperature/capacity setpoint for boiler [ºC]* P4 -- P5 Actual outside temperature [ºC] (if sensor is connected) P6 Actual fluegas temperature [ºC] P7 -- P8 Actual low velocity header temperature [ºC] (if sensor is connected) P9 Actual / Limit boiler output [%] P10 Password for advanced settings

Elco R3400 — 2 5 3 4 1 diagram (page 32)
Afb. 51

* P3 shows the actual temperature setpoint of the boiler, either coming from P1/P2 or from an additional (weather compensated) controller or building management system (2-10V). When the boiler capacity is controlled via a cascade manager or building management system (2-10V), P3 shows the actual capacity setpoint of the boiler.

Behind the lid you find an optical I/O connection (6), a reset/programming button (7) and an alarm/programming LED (8). Besides the parameter values/ settings, the display also shows additio- nal information with regard to input and output indications to and from the boi- ler:

Output indications

Input indications H Flame ionisation detected SW Water flow switch active DW Air pressure switch active RT Boiler enabled** Bus Bus communication active

Power to main gas valve Power to ignition transformer Fan control signal Z Power to primary boiler pump F Power to DHW pump/diverter valve

**The boiler enable signal is equipped with a jumper in the standard delivery and therefore the boiler will normally be enabled. If a building management system is connected to provide the enable signal to the boiler (jumper should be removed), check the building management system if the boiler remains disabled.

Changing parameter values For changing any parameters, in the example parameter P2 (DHW setpoint), the following procedure should be car- ried through: Open the lid (the arrow at the bottom

Press the reset/programming button

The new value is now activated. All parameters can be changed by follo- wing the same procedure as described above.

to select (the LED lights up) Turn the rotational switch until the

desired DHW setpoint value has been reached Press the reset/programming button

of the display indicates parameter P1) Turn the rotational switch clockwise

to confirm (the LED goes out) Close the lid.

until the arrow indicates parameter P2

Page 33 of the Elco R3400 user manual — Maintenance Checklist Replacing the electrodes
Pagina 33 · klik om te vergroten
Pagina 33

Maintenance Checklist Replacing the electrodes

Maintenance of the boiler should be carried out by authorized personnel only. In order to ensure continued good and safe operation of the boiler, it should be inspected at least once per year. A maintenance protocol should be filled out (see end of this chapter for example of maintenance protocol).

Checklist The following activities must be carried out, see following paragraphs for an extensive description of the main activi- ties: Replace the ignition and ionisation

electrodes; Clean the condensate receptacle; Clean and refill the syphon; Check the water pressure of the sys-

tem; Check the water quality of the system

water as well as supply water; Check the water flow rate through the

boiler; Check/correct the combustion values

at full and mimimum load with a com- bustion analyzer; Check the gas pressure to the boiler; Check the tightness of all sealed con-

nections and test points; Check the functionality of all safety

devices; Fill out a maintenance protocol.

Elco R3400 — Maintenance Checklist Replacing the electrodes diagram (page 33)
Afb. 52 · Maintenance Checklist Replacing the electrodes

Replacing the electrodes The electrodes are positioned on the right hand side of the boiler. Replace the ignition elektrode (1) and ionisation electrodes (2) as shown on the picture.

Page 34 of the Elco R3400 user manual — Maintenance Cleaning the condensate receptacle Cleaning and refilling the syphon
Pagina 34 · klik om te vergroten
Pagina 34

Maintenance Cleaning the condensate receptacle Cleaning and refilling the syphon

Elco R3400 — Maintenance Cleaning the condensate receptacle Cleaning and refilling the syphon diagram (page 34)
Afb. 53 · Maintenance Cleaning the condensate receptacle Clean…

Cleaning the condensate receptacle Remove the inspection hatch (2) to

Elco R3400 — Maintenance Cleaning the condensate receptacle Cleaning and refilling the syphon diagram (page 34)
Afb. 54 · Maintenance Cleaning the condensate receptacle Clean…

access the inside of the condensate receptacle; Clean the receptacle; Mount the inspection hatch.

Water pressure and quality Check if the water pressure and quality meet the requirements. Consult the chapter “commissioning: water and hydraulic system” for more detailed information. Water flow rate Check if the water flow rate through the boiler is within the limits. Consult the chapter “commissioning: check water flow” for more detailed information.

Combustion analysis Check the combustion at full load and minumum load, correct the settings if necessary. An additional reference check at 50% load is recommended. Consult the chapter “commissioning: combustion analysis” for more detailed information. Gas pressure Check the dynamic pressure of the gas supply to the boiler, when the boiler is running at full load. In case of a boiler cascade, all boilers should be running at full load. See technical data for re- quired values.

Combustion analysis Check the combustion at full load and minumum load, correct the settings if necessary. An additional reference check at 50% load is recommended. Consult the chapter “commissioning: combustion analysis” for more detailed information. Gas pressure Check the dynamic pressure of the gas supply to the boiler, when the boiler is running at full load. In case of a boiler cascade, all boilers should be running at full load. See technical data for re- quired values.

Cleaning and refilling the syphon Remove the syphon (3) from the con-

densate connection; Clean and fill it with fresh water; Mount the syphon back in the original

position.

Page 35 of the Elco R3400 user manual — Maintenance Protocol R3400/R3500/R3600
Pagina 35 · klik om te vergroten
Pagina 35

Maintenance Maintenance Protocol

Maintenance Protocol R3400/R3500/R3600

Project Boiler type Project Serial number Address Year City Nominal load (Hi) [kW] Date Nominal output (Hi) [kW] Engineer System Water pressure [bar] Water pH [-] Water hardness [dºH] Water chloride [mg/l] Water ∆T full load [ºC] Water ∆pboiler [kPa] Water flow [m3/h] Pump setting [-] Safety devices High limit setting [ºC] Water flow sensor checked Temp. limiter setting [ºC] Water flow switch checked Min. gas pressure switch setting [mbar] Ignition time burner [sec] Combustion analysis 100% load 50% load Min. load Gas consumption [m3/h] [m3/h] [m3/h] Gas pressure [mbar] [mbar] [mbar] CO2 Pilot burner [%] [%] [%] O2 Pilot burner [%] [%] [%] CO Pilot burner [ppm] [ppm] [ppm] NOx Pilot burner [ppm] [ppm] [ppm]

CO2 Main burner [%] [%] [%] O2 Main burner [%] [%] [%] CO Main burner [ppm] [ppm] [ppm] NOx Main burner [ppm] [ppm] [ppm]

Tatmospheric [ºC] [ºC] [ºC] Tfluegas [ºC] [ºC] [ºC] Twater, flow [ºC] [ºC] [ºC] Twater, return [ºC] [ºC] [ºC] Ionisation current [µA] [µA] [µA] pfan [mbar] [mbar] [mbar] ptop panel [mbar] [mbar] [mbar] pcombustion chamber [mbar] [mbar] [mbar] Parameter settings P1 Setpoint temperature heating [ºC] P12 Boiler hysteresis [ºC] P2 Setpoint temperature DHW [ºC] P17 Fan speed min. load [%] P11 Maximum boiler setpoint [ºC] P19 Fan speed 100% load [%] Remarks

Page 36 of the Elco R3400 user manual — Lockouts
Pagina 36 · klik om te vergroten
Pagina 36

Lockouts

In case of a lockout, a warning triangle (E) and a flashing error code appears on the display. The cause of a fault should first be determined and eliminated before the boiler is being reset. In case the lockout appears more than twice within 6 minutes or maintains for longer than 6 minutes, the error code is added with a “3”. The table below shows all possible lockouts and an indication of possible cause.

No. Error type Explanation Possible solution 1 Lockout Water flow temperature has exceeded the high limit temperature setting (100ºC).

Check if boiler is in automatic mode (K), Check if water flow through the boiler is sufficient, check if (P11+P12) < High limit setting (V9). 2 Interlock Gas pressure has dropped below minimum value of minimum gas pressure switch or additional safety device connected to the interlock input has been interrupted (during startup).

Check gas supply pressure / check function of additio- nal safety device on interlock input.

3 Interlock Gas pressure has dropped below minimum value of minimum gas pressure switch or additional safety device connected to the interlock input has been interrupted (during operation).

Check gas supply pressure / check function of additio- nal safety device on interlock input.

4 Lockout No flame ionisation signal detected during burner start.

Check phase/neutral of power supply (phase sensitivi- ty!), check gas supply, check ignition spark, increase gas valve setting min. load (alan key screw). 5 Lockout Flame ionisation signal lost during operation. Check gas supply pressure during operation, check gas valve setting via combustion analysis. 6 Interlock Water flow temperature has exceeded the tem- perature limiter setting (97ºC).

Check if boiler is in automatic mode (F), check if water flow through the boiler is sufficient, check if (P11+P12) < Temp. limiter setting (V10). 7 Lockout External safety device connected to the lockout input has been interrupted.

Check the external safety devices (water pressure switches, safety thermostat, etc.)

11 Lockout Flame ionisation signal detected before burner start.

Check ionisation electrode, measure ionisation current when boiler is off, check wiring between ionisation electrode and boiler controller. 12 Interlock Water flow temperature sensor is defective. Check resistance of sensor (see chapter “sensor values”), check wiring between water flow temperature sensor and boiler controller. 14 Interlock DHW temperature sensor (optional) is defective. Check resistance of sensor (see chapter “sensor values”), check wiring between DHW temperature sensor and boiler controller. 15 Interlock Outside temperature sensor (optional) is defecti- ve.

Check resistance of sensor (see chapter “sensor values”), check wiring between outside temperature sensor and boiler controller. 18 Interlock Header temperature sensor (optional) is defecti- ve.

Check resistance of sensor (see chapter “sensor values”), check wiring between header temperature sensor and boiler controller.

Page 37 of the Elco R3400 user manual — Lockouts
Pagina 37 · klik om te vergroten
Pagina 37

Lockouts

No. Error type Explanation Possible solution 20 Lockout Error gas valve V1, flame ionisation signal detec- ted longer than 5 seconds after burner stop.

Check closing position of valve V1 within gas combi valve, replace gas valve. 21 Lockout Error gas valve V2, flame ionisation signal detec- ted longer than 5 seconds after burner stop.

Check closing position of valve V2 within gas combi valve, replace gas valve. 22 Lockout APS contact does not close during prepurge. Check setting APS, check if fan is running.

23 Lockout APS contact remains closed when fan is off. Check setting APS

27 Lockout APS contact opens during operation. Check setting APS

30 Lockout CRC error in control system parameters (P11- P40).

Check parameter settings of P11-P40, change value of one parameter within P11-P40 (lockout disappears), change all parameters back to original settings. 31 Lockout CRC error in boiler safety parameters (V1-V16). Check parameter settings of V1-V16, change value of one parameter within V1-V16 (lockout disappears), change all parameters back to original settings. 32 Interlock Power supply voltage to boiler controller is too low.

Check fuse of boiler controller, check power supply to boiler controller. 40 Lockout Water flow switch has been interrupted when pump being enabled.

Check pump operation, check water flow through the boiler, check functionality of water flow switch. x.y. Lockout (all lockout codes which are not listed above) Internal lockout of boiler controller.

Press reset. Change boiler controller when lockout can not be reset or occurs more frequently.

Page 38 of the Elco R3400 user manual — Sensor values
Pagina 38 · klik om te vergroten
Pagina 38

Sensor values

Elco R3400 — Sensor values diagram (page 38)
Afb. 55 · Sensor values

The diagrams show the sensor values for all boiler sensors and optional sen- sors available in accessory kits. The diagrams contain average values, as all sensors are liable to tolerances.

Water flow and fluegas temperature sensor (5kΩ NTC)

When measuring the resistance values, the boiler should always be switched off. Measure close to the sensor, in order to avoid value deviations.

DHW, outside and header temperature sensor (1kΩ PTC)

Page 39 of the Elco R3400 user manual — Kerkrade, 10-06-2013 A.J.G. Schuiling Plant Manager
Pagina 39 · klik om te vergroten
Pagina 39

Declaration of Conformity

Declaration of Conformity

Rendamax BV, Hamstraat 76, 6465 AG Kerkrade (NL),

declares that the products

R3400/3500/3600

are in conformity with the following standards:

EN 656 EN 15417 EN 13836 EN 55014-1 / -2 EN 61000-3-2 /-3

EN 60 335-1/ -2

and in accordance with the guidelines of directives:

92 / 42 / EEC (boiler efficiency directive) 90 / 396 / EEC (gas appliance directive) 73 / 23 / EEC (low voltage directive) 89 / 336 / EEC (EMC directive) These products are designated with CE nr.:

CE – 0063AR3514

Kerkrade, 10-06-2013 A.J.G. Schuiling Plant Manager

Elco R3400 — Kerkrade, 10-06-2013 A.J.G. Schuiling Plant Manager diagram (page 39)
Afb. 56 · Kerkrade, 10-06-2013 A.J.G. Schuiling Plant Manager
Page 40 of the Elco R3400 user manual — Declaration of Conformity
Pagina 40 · klik om te vergroten
Pagina 40
Page 40 of the Elco R3400 user manual — Declaration of Conformity
Page 41 of the Elco R3400 user manual — 05/2014 420010582400
Pagina 41 · klik om te vergroten
Pagina 41

Betriebsanleitung für die autorisierte Fachkraft R3400/R3500/R3600

05/2014 420010582400

Page 42 of the Elco R3400 user manual — Betriebsanleitung für die autorisierte Fachkraft R3400/R3500/R3600
Pagina 42 · klik om te vergroten
Pagina 42
Page 42 of the Elco R3400 user manual — Betriebsanleitung für die autorisierte Fachkraft R3400/R3500/R3600

Vraag stellen over de Elco R3400

Eigenaren en ons team reageren doorgaans binnen een dag — en uw vraag helpt ook de volgende persoon.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
Nog geen vragen over de Elco R3400

Stel als eerste een vraag — andere eigenaren of ons team geven antwoord.

Origineel document

Elco R3400 handleiding-pdf

192 pagina's·5.4 MB·Boiler·PDF
Klik op een bovenstaande pagina om deze hier te openen
Pagina 1 / …
100%
Pagina's laden…