Operation and Installation manual for authorized technicians only Betriebsanleitung für die autorisierte Fachkraft Bedienings- en Installatiehandleiding alleen voor bevoegde vakmensen Notice d’installation et d’emploi réservée à l’usage des techniciens agréés Istruzioni per l'uso solo per il tecnico autorizzato







General regulations This documentation contains important information, which is a base for safe and reliable installation, commissioning and operation of the R3400/R3500/ R3600 boiler. All activities described in this document may only be excecuted by authorized companies. Changes to this document may be ef- fected without prior notice. We accept no obligation to adapt previously deliv- ered products to incorporate such changes. Only original spare parts may be used when replacing components on the boiler, otherwise warranty will be void. Application The R3400/R3500/R3600 boiler may be used for heating and hot water pro- duction purposes only. The boiler should be connected to closed systems with a maximum temperature of 100ºC (high limit temperature), maximum set- point temperature is 90ºC.
The R3400/R3500/R3600 boiler is CE approved and applies to the follow- ing European standards: 92 / 42 / EEC
Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current 16 A per phase) EN 61000-3-3
Boiler efficiency directive 90 / 396 / EEC
Electromagnetic compatibility (EMC) - Part 3-3: Limitation of voltage chang- es, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current 16 A per phase and not sub- ject to conditional connection EN 60335-1
Gas appliance directive 73 / 23 / EEC
Low voltage directive 89 / 336 / EEC
EMC directive EN 656
Household and similar electrical appli- ances - Safety - Part 1: General re- quirements EN 50165
Gas-fired central heating boilers – Type B boilers of nominal heat input exceeding 70 kW but not exceeding 300 kW EN 15417
Household and similar electrical appli- ances - Safety - Part 2-102: Particular requirements for gas, oil and solid- fuel burning appliances having electri- cal connections
Gas-fired central heating boilers - Specific requirements for condensing boilers with a nominal heat input greater than 70 kW but not exceeding 1000 kW EN 13836
Norms and regulations When installing and operating the R3400/R3500/R3600 boiler, all applica- ble norms (european and local) should be fulfilled: Local building regulations for in-
Gas fired central heating boilers - Type B boilers of nominal heat input exceeding 300 kW, but not exceeding 1000 kW EN 15502-1
stalling combustion air and flue gas systems; Regulation for connecting the boiler to
Richtlinie Teil 2 Vorschriften der kantonalen Instanzen
(z.B. Feuerpoilizeivorschriften) Netherlands: (only applicable to R3401-R3406 and R3600-R3605) GASKEUR BASIS GASKEUR SV GASKEUR HR107 Belgium: HR TOP
the electrical appliance; Regulations for connecting the boiler
Gas-fired central heating boilers - Part 1: General requirements and tests EN 55014-1
to the local gas network; Norms and regulations according to
safety equipment for heating systems; Any additional local laws/regulations
Electromagnetic compatibility - Re- quirements for household appliances, electric tools and similar apparatus - Part 1: Emission EN 55014-2
with regard to installing and operating heating systems.
Electromagnetic compatibility - Re- quirements for household appliances, electric tools and similar apparatus - Part 2: Immunity - Product family standard


Layout of boiler The R3400/R3500/R3600 boiler con- sists of the following main components: 1 Return water connection 2 Flue gas connection 3 Water flow switch 4 Safety valve 5 Flow water connection 6 Filling/draining valve 7 Top plate 8 Plenum 9 Burner 10 1st Heat exchanger 11 Gas filter 12 2nd Heat exchanger 13 Gastrain 14 Frame 15 180° Bend 16 Compensator 17 Flue gas connection 18 Condensate receptacle 19 Flue gas receptacle 20 Combustion chamber 21 Entry electrical connections 22 Syphon 23 Main gas valve 24 Fan 25 Electrical box 26 Control panel 27 Casing 28 Air inlet damper 29 Butterfly valve 30 Main mixing channel 31 Pilot gas valve 32 Pilot mixing channel 33 Boiler pump 34 3rd Heat exchanger (only R3600) A Air B Gas C Flue gasses D Condensate

Operating principle The R3400/R3500/R3600 is a fully modulating boiler. The control unit of the boiler adapts the modulation ratio automatically to the heat demand re- quested by the system. This is done by controlling the speed of the fan. As a result, the Whirlwind mixing system will adapt the gas ratio to the chosen fan speed, in order to maintain the best possible combustion figures and there- with the best efficiency. The flue gases created by the combustion are trans- ported downwards through
the boiler and leave at the back side into the chimney connection. The return water from the system en- ters the boiler in the lower section, where is the lowest flue gas tempera- ture in the boiler. In this section con- densation takes place. The water is being transported upwards through the boiler, in order to leave the boiler at the top (burner) section. The cross flow working principle (water up, flue gas down) ensures the most efficient com- bustion results.
The KM628 control unit can control the boiler operation based on: fixed temperature (stand alone
operation); weather compensated operation (with
optional controller); with 0-10V external influence
(temperature or capacity) from a buil- ding management system.















Nominal heat output at 80-60ºC max/min kW 572/142 639/182 747/212 846/241 945/269 1043/297
Nominal heat output at 75-60ºC max/min kW 576/144 643/184 753/215 852/243 952/272 1050/300
Nominal heat output at 40/30ºC max/min kW 602/159 672/203 786/237 890/268 994/300 1097/331
Nominal heat input Hi max/min* kW 585/146 653/187 764/218 865/247 966/276 1066/305
Efficiency at 80/60ºC % 97.8
Efficiency at 40/30ºC % 102.9
Annual efficiency (NNG 75/60ºC) % 105,1
Annual efficiency (NNG 40/30ºC) % 109,8
Standstill losses (Twater = 70ºC) % 0,3
Max. condensate flow l/h -
Gas consumption H-gas max/min (10,9 kWh/m3) m3/h 53.7/13.4 59.9/17.1 70.1/20.0 79.4/22.7 88.6/25.3 97.8/27.9
Gas consumption L-gas max/min (8,34 kWh/m3) m3/h 70.3/17.6 78.3/22.4 91.6/26.2 103.7/29.6 115.8/33.1 127.8/36.5
Gas consumption LPG. max/min (12,8 kWh/kg) kg/h 45.7/11.4 51.0/14.6 59.7/17.1 67.6/19.3 75.5/21.6 83.3/23.8
Gas pressure H-gas mbar 20
Gas pressure L/LL-gas mbar 25
Gas pressure LPG mbar 30/50
Maximum gas pressure mbar 100
Flue gas temperature at 80/60ºC max/min ºC 85/65
Flue gas temperature at 40/30ºC max/min ºC 59/36
Flue gas quantity max/min* m3/h 969/242 1076/307 1258/359 1424/407 1590/454 1756/502
CO2 level main burner natural gas H/E/L/LL max/min % 10.0/9.3 10.0/9.3
CO2 level main burner liguid gas P max/min % 11.0/11.0 11.0/11.0
CO2 level pilot burner natural gas H/E/L/LL max/min % - 10.0/10.2
CO2 level pilot burner liguid gas P max/min % - 11.0/11.2
NOx level max/min mg/kWh 32.3/18.8 11.5/19.5
CO level max/min mg/kWh 8.2/10.9 27.3/6.5
Max. permissible flue resistance max/min Pa 100 150
Water volume l 69 73 97 104 110 117
Water pressure max/min bar 8/1
Maximum temperature setpoint ºC 90
Nominal water flow at dT=20K m3/h 24,7 27,6 32,2 36,5 40,8 45,0
Hydraulic resistance at nominal water flow kPa 48 56 38 45 53 60
Electrical connection V 400
Mains connection fuse A 10 16 20
IP class - IP20
Power consumption 3-step pump (optional) W 940 980 1020 1400 1450 1500
Power consumption speed controlled pump (optional) W
471 616 561 661 867 956
Noise level at 1 meter distance dB(A) 64
Ionisation current minimum µA 6
PH value condensate - 3.2
CE certification code - CE-0063AR3514
Water connections - DN65 PN16 DN80 PN16
Gas connection - R 2” DN65 PN16
Flue gas connection mm 300 350 400
Air intake connection (for room sealed use) mm 250 300 355
Condensate connection mm 40
Frequency Hz 50



Dimensions R3601 R3602 R3603 R3604 R3605
L mm 2265 2653 2653 2658 2658
L1 mm 595 610 610 615 615
L2 mm 590 1166
L3 mm 198 88
H mm 1405
H1 mm 1175 1450 1450 1205 1427
B mm 1330 1130 1130 1330 1330
B1 mm 1210 1003 1053 1203 1253
B2 mm 665 565 565 665 665
B3 mm 120 127 77 127 77
B4 mm 1146 946 946 1146 1146
B5 mm 65 115 65 115 65
D mm 300 350 350 400 400
D1 mm 250 250 300 300 355 355
W1 DN DN65 PN16 DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16
W2 DN DN65 PN16 DN65 PN16 DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16
G R R 2" R 2" R 2" DN65 PN16 DN65 PN16

Nominal heat output at 80-60ºC max/min kW 572/142 639/182 747/212 846/241 945/269 1043/297
Nominal heat output at 75-60ºC max/min kW 576/144 643/184 753/215 852/243 952/272 1050/300
Nominal heat output at 40/30ºC max/min kW 602/159 672/203 786/237 890/268 994/300 1097/331
Nominal heat input Hi max/min* kW 585/146 653/187 764/218 865/247 966/276 1066/305
Efficiency at 80/60ºC % 97.8
Efficiency at 40/30ºC % 102.9
Annual efficiency (NNG 75/60ºC) % 105,1
Annual efficiency (NNG 40/30ºC) % 109,8
Standstill losses (Twater = 70ºC) % 0,3
Max. condensate flow l/h -
Gas consumption H-gas max/min (10,9 kWh/m3) m3/h 53.7/13.4 59.9/17.1 70.1/20.0 79.4/22.7 88.6/25.3 97.8/27.9
Gas consumption L-gas max/min (8,34 kWh/m3) m3/h 70.3/17.6 78.3/22.4 91.6/26.2 103.7/29.6 115.8/33.1 127.8/36.5
Gas consumption LPG. max/min (12,8 kWh/kg) kg/h 45.7/11.4 51.0/14.6 59.7/17.1 67.6/19.3 75.5/21.6 83.3/23.8
Gas pressure H-gas mbar 20
Gas pressure L/LL-gas mbar 25
Gas pressure LPG mbar 30/50
Maximum gas pressure mbar 100
Flue gas temperature at 80/60ºC max/min ºC 85/65
Flue gas temperature at 40/30ºC max/min ºC 59/36
Flue gas quantity max/min* m3/h 969/242 1076/307 1258/359 1424/407 1590/454 1756/502
CO2 level main burner natural gas H/E/L/LL max/min % 10.0/9.3 10.0/9.3
CO2 level main burner liguid gas P max/min % 11.0/11.0 11.0/11.0
CO2 level pilot burner natural gas H/E/L/LL max/min % - 10.0/10.2
CO2 level pilot burner liguid gas P max/min % - 11.0/11.2
NOx level max/min mg/kWh 32.3/18.8 11.5/19.5
CO level max/min mg/kWh 8.2/10.9 27.3/6.5
Max. permissible flue resistance max/min Pa 100 150
Water volume l 73 73 97 104 110 117
Water pressure max/min bar 8/1
Maximum temperature setpoint ºC 90
Nominal water flow at dT=20K m3/h 24,7 27,6 32,2 36,5 40,8 45,0
Hydraulic resistance at nominal water flow kPa 48 56 38 45 53 60
Electrical connection V 400
Mains connection fuse A 10 16 20
IP class - IP20
Weight (empty) kg 810 890 1040 1150 1280 1410
Noise level at 1 meter distance dB(A) 64
Ionisation current minimum µA 6
PH value condensate - 3.2
CE certification code - CE-0063AR3514
Water connections - DN65 PN16 DN80 PN16
Gas connection - R 2” DN65 PN16
Flue gas connection mm 300 350 400
Air intake connection (for room sealed use) mm 250 300 355
Condensate connection mm 40
Frequency Hz 50


Dimensions R3600 R3601 R3602 R3603 R3604 R3605
L mm 1958 2070 2443
L2 mm 700 590 1166
L3 mm 108 198 88
H mm 1355 1405
B mm 1230 1330 1130 1130 1330 1330
B1 mm 1110 1210 1003 1053 1203 1253
B2 mm 615 665 565 565 665 665
B3 mm 120 120 127 77 127 77
B4 mm 1046 1146 946 946 1146 1146
B5 mm 100 65 115 65 115 65
D mm 300 300 350 350 400 400
D1 mm 250 250 300 300 355 355
W1 DN DN65 PN16 DN65 PN16 DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16
W2 DN DN65 PN16 DN65 PN16 DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16
W3 DN DN65 PN16 DN65 PN16 DN80 PN16 DN80 PN16 DN80 PN16 DN80 PN16
G R R 2" R 2" R 2" R 2" DN65 PN16 DN65 PN16

Standard boiler A boiler delivery package contains the following components:
Component Pcs. Package
R3400/R3500/R3600 Boiler fully assembled and tested 1 Mounted on wooden blocks with wooden border, sealed in PE foil Adjustable feet 4 Cardboard box on top of boiler (on R3407-R3410 already fitted to boiler) Syphon for condensate connection 1 Cardboard box on top of heatexchanger (under casing) Operation and Installation manual 1 Map attached to back panel of the boiler
Wiring diagram 1 Map attached to back panel of the boiler
Accessories On request it is possible to get various options and/or accessories. Ask your supplier for the possibilities.


Boiler transport The R3400/R3500/R3600 boiler will be supplied as a complete unit being fully assembled and pre-tested. The boiler can be transported with a pallet truck (at least 1m wide), picking the boiler up from the side. Whenever necessary, the boiler can be dismantled into smaller parts for easier transport inside the building. The table below shows the main dismantled parts with their weight and dimensions.
When the R3400/R3500/R3600 boiler has to be transported with a crane, it is necessary to remove the casing before connecting the boiler to the crane. Al- ways connect the crane to the frame of the boiler by using straps.
1 Hoisting belt (4x) 2 Wooden retaining beam (2x) 3 Hoisting belt position (4x)
R3403 R3502 R3602
R3404 R3503 R3603
R3405 R3504 R3604
R3406 R3505 R3605
Burner m [kg] L [mm] W [mm]
135 1010 1150 420
135 1010 1150 420
140 1010 1310 500
210 1420 1010 500
215 1420 1110 500
220 1420 1210 500
225 1420 1310 500
1st Heat exchanger m [kg] L [mm] W [mm]
120 1010 1150 160
120 1030 1150 150
135 1010 1310 160
180 1420 1010 160
185 1420 1110 160
190 1420 1210 160
195 1420 1310 160
2nd Heat exchanger
m [kg] L [mm] W [mm]
135 1010 1150 160
135 1030 1050 150
150 1010 1310 160
200 1420 1010 160
200 1420 1110 160
210 1420 1210 160
210 1420 1310 160
3rd Heat exchanger (only R3600 series)
m [kg] L [mm] W [mm]
-
135 1030 1050 150
150 1010 1310 160
200 1420 1010 160
200 1420 1110 160
210 1420 1210 160
210 1420 1310 160
Frame H for R3600 in ( )
m [kg] L [mm] W [mm]
50 1325 1165 460
50 1325 1165 360
60 1630 1266 500 (370)
70 2004 1066 500 (370)
70 2004 1066 500 (370)
70 2004 1266 500 (370)
70 2004 1266 500 (370)
Condensate receptacle m [kg] L [mm] W [mm]
< 25 1320 990 400
< 25 1320 990 275
< 25 1450 1070 400
< 35 1950 770 400
< 35 1950 870 400
< 35 1950 970 400
< 35 1950 1070 400




Component R3407 R3408 R3409 R3410
Burner m [kg] L [mm] B [mm] H [mm]
230 1510 1400 600
385 2050 1250 600
390 2050 1350 620
395 2050 1450 620
1st Heat exchanger m [kg] L [mm] B [mm] H [mm]
200 1510 1425 150
325 2050 1250 150
330 2050 1350 150
335 2050 1450 150
2nd Heat exchanger
m [kg] L [mm] B [mm] H [mm]
220 1510 1425 150
365 2050 1250 150
370 2050 1350 150
375 2050 1450 150
m [kg] L [mm] B [mm] H [mm]
80 2010 1466 510
120 2525 1266 515
120 2525 1466 515
120 2525 1466 515
Condensate m [kg] L [mm] B [mm] H [mm]
< 40 2075 1175 350
< 55 2600 975 350
< 55 2600 1075 350
< 55 2600 1175 350
Frame


Boiler transport Remove the casing before transporting the boiler, in order to avoid damage to the casing parts during transportation. Removing the casing is done as fol- lows:



Boiler installation The boiler should be positioned in a frost-proof boiler room. If the boiler room is on the roof, the boiler itself may never be the highest point of the instal- lation. When positioning the boiler, please note the recommended minimum clea- rance in the picture. When the boiler is positioned with less free space, mainte- nance activities will be more difficult. Once the boiler is in the correct posi- tion, the wooden blocks (1) should be removed and the adjustable feet (2) (with vibration absorption dampers) should be adjusted to the right height. Water and gas connections should be done after mounting the feet, as they effect the exact height of all connecti- ons.

The R3407- R3410 are not supplied on wooden blocks, but on wheels. After positioning the boiler, the adjustable feet have to be set to the correct height. The wheels have to be removed. The connections to the boiler have to be made after the feet have been ad- justed, as the adjustment will effect the exact height of all connections.

Connecting the boiler This chapter will explain how to make all connections to the boiler with regard to: Hydraulic connections (1, 3) Condensate drain connection (7) Gas connection (6) Flue gas connection (5) Air intake connection (only when

using roomsealed, order seperately) (2) Electrical connection (4) The boiler should always be connected in such a way, that the system applies to all relevant standards and regulati- ons (European, national and local). It’s the responsibility of the installer to en- sure that all standards and regulations are respected.
Hydraulic connections The boiler should always be connected in such a way, that water flow through the boiler can be ensured at all times. Connect the flow (3) and return (1) con- nection of the system tension free to the boiler connections. If the boiler is used in a system with two return cir- cuits (only R3600 series), the common return becomes the low temperature return, the 2nd return connection is the high temperature return (remove cap/ flange before connecting). Condensate connection (7) After filling with water, the syphon (included in delivery) should be in- stalled to the connection at the bottom of the condensate receptacle. The con- nection to the draining system should always be done with an open connec- tion, in order to avoid a flooding of the boiler in case of a blocked drain.



Gas connection (6) The gas connection must be made by an authorized installer in accordance with the applicable national and local standards and regulations. Connect the gas line from the system tension free to the gas connection (6) of the boiler. A gas cock should be mounted directly behind the boiler. A gas filter can be mounted directly on the gas connection of the boiler. Flue gas connection (5) Regulations for the construction of flue gas systems are very different for each country. It should be ensured that all national regulations with regard to flue gas systems are respected. Connect the flue gas system to the flue gas connection (5) of the boiler, use fluegas systems with seamless connec- tions only. It’s not necessary to make a separate condensate drain for the flue gas system, as the condensate will be drained via the syphon of the boiler. Please note the following issues:
It’s recommended to use stainless
steel systems The diameter of the flue gas system
must be chosen by calculation ac- cording to the national regulations Construct the flue gas system as
short as possible (for maximum length see planner documentation) Construct horizonal ways with a mini-
mum angle of 3º Air intake connection (3) When using the boiler roomsealed. The air intake can be connected if the boiler was ordered as roomsealed. The dia- meter should be calculated according to the national regulations, together with the flue gas system. The total re- sistance of both systems should never overcome the maximum permissible resistance of the fan inside the boiler (see also chapter: Technical data). .


Electrical connection (4) The electrical connection must be ma- de by an authorized installer in accordance with the applicable national and local standards and regulations. For the power supply it’s necessary to use a mains isolator switch with a con- tact opening of at least 3 mm within the boiler room. This switch can be used to switch off the power supply for maintenance purposes. Cables can be inserted through the cable trays and glands at the back of the electrical panel at the front of the boiler. Connect all wires to the terminals ac- cording to the wiring diagram of the boiler (enclosed in map attached to back panel of the boiler).


![Page 24 of the Elco R3400 user manual — [ºC] > 1.5 90 > 1.0 80](/cdn/reader/1a/1a3d27605d4c53ab6e7bcb59478de9c44d68be96f894bf4bb767c34e7371b7ea/images/page-24.webp?w=400)
Commissioning of the boiler should be carried out by authorized personnel only. Failure to respect this condition makes the guarantee void. A protocol of the commissioning should be filled out (see end of this chapter for example of commissioning protocol).
This chapter explains the commissio- ning of the boiler with the standard boi- ler controller. When an additional sys- tem controller is installed, please refer to its manual for commissioning the controller.
Max. sum of alkaline earths
Max. total hardness
Water quality The system should be filled with water with a PH value between 8,0 and 9,5. The chloride value of the water should not exceed 50 mg/l. Entry of oxygene by diffusion should be prevented at all times. Damage to the heat exchanger because of oxygene diffusion will not be taken under warranty.
In installations with higher water volu- mes, it’s necessary to respect the maxi- mum filling and additional volumes with corresponding hardness values as sta- ted in the german VDI2035 standard. In the table you can find the nominal va- lues for filling and additional water for the R3400/R3500/R3600 according to the the VDI2035.
The table at the left gives an indication of the relation between the water quali- ty and the maximum water filling volu- me during the lifetime of the boiler. Consult the original text of the VDI2035 for more detailed information.
Capacity of installation Q (kW)
Ca(HCO3)2
600 800 1000 1200 1400 1600 1800
dºH Maximum water (re)fill volume Vmax [m3]
≤0.5 ≤2.8 - - - 75.1 87.6 100.2 122.7
1.0 5.6 - - - 37.6 43.8 50.1 56.3
1.5 8.4 12.0 16.7 20.9 25.0 29.2 33.4 37.6
2.0 11.2 9.4 12.5 15.7 18.8 21.9 25.0 28.2
2.5 14.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5
≥3.0 ≥16.
8 6.3 8.3 10.4 12.5 14.6 16.7 18.8

Water pressure Open the valves to the system. Check the water pressure in the system. If the water pressure is too low (see table below), increase the pressure up to at least the minimum required water pressure in the table. Filling can be done via the fill and drain valve (2) on the return connection (1) of the boiler.
Hydraulic system Check if the boiler is hydraulically con- nected to the system in such way, that water flow can be secured at all times during burner operation. The water flow is supervised by the water flow switch in the boiler and a lack of flow will lead to a direct burner stop and lockout of the boiler.


Gas supply Check the gas supply connection to the boiler for tightness. If any leakage is found, reseal the leakage before star- ting the boiler! Remove any air between the gas valve and the gas line. This can be done at the test point (1) at the gas pressure switch. Don’t forget to close the test point afterwards! Check the gas type and values with the local gas company, in order to know for which gas type the boiler should be commissioned.

Condensate connection Remove the syphon (2) from the con- densate connection. Fill it with water and place it back in the original posi- tion. Make sure the syphon is filled before starting the boiler, in order to prevent flue gases dischar- ging through the condensate connec- tion!
Flue and air intake connections Check whether the flue and air intake systems are made according to the national and local regulations. Installati- ons which don’t comply with the regula- tions, are not allowed to be commissio- ned. Make sure that all connections are free. The size of flue gas and air intake con- nections may not be reduced.


Prepare boiler for first startup Open gas connection; Switch on mains isolator switch for

power supply to the boiler; Switch on boiler with on/off switch (1)
Make sure the boiler remains in

standby operation K (2) use rotational switch (3); Check the pump operation: make
sure that the direction of the rotation is correct; Remove any air from the pump by
removing the end cap of the pump motor housing. It’s recommended to keep the boiler at 50% load for a while after the first startup, as this is the easiest base for starting the combustion analysis. This can be assured as follows: Open the lid of the boiler controller; Use rotational switch (3) for going to

parameter P9 in the menu; Change P9 (5) into 50% (push
programming button (4), change value with rotational switch (3), push programming button (4) to confirm); Close the lid of the boiler controller.


Combustion check at full load Start the boiler at service mode for full load operation (W2). When you have reduced P9 to 50% (see previous chapter), the boiler will operate at 50% load. Allow the boiler to stabilise the combustion for 3 minutes. Then increase P9 step by step up to 100%. Check the gas pressure on the inlet of the gas valve while increasing the boiler load: the gas pressure should never go below the minumum required value see technical data. Set the minimum gas pressure switch (1) at 50% of the required gas pressure. First check the combustion values of the pilot burner using the measuring tube on the back of the boiler (3). If required the values can be corrected with the adjustment screw on the pilot gas valve (2). Then check the combustion values of the main burner using a measuring point in the flue (4). If required the va- lues can be corrected with the adjust- ment screw (V) on the main gas valve (5).
Combustion settings for natural gas G20 / G25 All boilers CO2, max % 10.0 ± 0.2 COmax ppm < 1000
CO2, min % 10.2 ± 0.2
COmin ppm < 1000

All boilers CO2, max % 11.0 ± 0.2 COmax ppm < 1000 CO2, min % 11.2 ± 0.2 COmin ppm < 1000

Combustion check at minimum load Switch the boiler to service mode for minimum load operation (W1). Check the combustion settings the same way as described for full load. The combustion settings for the pilot burner can be adjusted using the adjustment screw on the pilot gas valve (6). The combustion settings for the main burner can be adjusted using the adjustment screw (N) on the main gas valve (7).
Combustion settings for natural gas G20 / G25 All boilers CO2, max % 10.0 ± 0.2 COmax ppm < 30
CO2, min % 9.3 ± 0.2
COmin ppm < 30
Combustion check at 50% load An additional reference check of com- bustion values at 50% load is recom- mended in order to check if the gas valve is set in such way, that the modu- lating behaviour is normal. The CO2 value should be in between the settings of full load and minumum load. CO value should be equal to full load and minimum load values. Make sure parameter P9 is set back to 100 and switch the boiler to automatic operation (F) after the combustion test is finished.

All boilers CO2, max % 11.0 ± 0.2 COmax ppm < 30 CO2, min % 11.0 ± 0.2 COmin ppm < 30


Adjustment Air pressure switch Connect a pressure gauge to the indi- cated measuring points on the switch (1). Start the boiler at service mode for minimum load operation (W1). Measure the pressure differential across the switch, this should be ≈ 0.8 mbar. Turn the dial on the switch (2) counter- clockwise until the end. Reduce the setting on parameter P17 step by step until the pressure differential is 0.4 mbar. Slowly turn the dial on the switch clockwise until the boiler goes to lock- out. Set P17 back to its original setting!! Reset the lockout. Restart the boiler and check if the switch contact closes at 0.4 mbar (indicator at DW in display of the boiler controller (3). If required, repeat the above procedure.



Check water flow The water flow through the boiler can be checked with two different methods shown below. ∆T measurement Check the temperature difference over the boiler (∆T flow-return) when the boiler is running on 100% load. The nominal ∆T is 20K and must be at least between 15K and 25K for secure boiler operation. An indication of the actual flow rate can be found with the follo- wing calculation (see table below for nominal data):
qactual = (∆Tnominal / ∆Tmeasured) * qnominal [m3/h]
∆p measurement Check the pressure difference over the boiler (∆p flow-return) when the boiler pump is running (burner on is not requi- red). The nominal ∆p for each boiler type can be found in the table below, actual ∆p must be within: 0.35*∆pnom ≤ ∆P ≤ 1.75*∆pnom . An indi- cation of the actual flow rate can be found with the following calculation (see table below for nominal data):
qactual = √(∆pmeasured / ∆pnominal) * qnominal [m3/h]
Flow rate R3401 - R3405 at ∆T 20K R3401 R3402 R3403 R3404 R3405 Nominal flow [m3/h] 28.5 31.6 37.0 41.8 46.8 ∆p at nom. flow [kPa] 46 53 36 43 50
Flow rate R3406 - R3410 at ∆T 20K R3406 R3407 R3408 R3409 R3410 Nominal flow [m3/h] 51,6 56,1 64,1 72,1 80,1
Flow rate R3501 - R3505 at ∆T 20K R3501 R3502 R3503 R3504 R3505 Nominal flow [m3/h] 26,4 30,8 34,9 39,0 43,0 ∆p at nom. flow [kPa] 37 25 30 35 40
Flow rate R3600 - R3605 at ∆T 20K R3600 R3601 R3602 R3603 R3604 Nominal flow [m3/h] 24,7 27,6 32,2 36,5 40,8
∆p at nom. flow [kPa] 48 56 38 45 53
45,0


Check functionality of safety devices All safety devices have to be checked on good functioning. Safety devices on a standard boiler are a water flow tem- perature sensor, water flow switch, minimum gas pressure switch and ioni- sation electrode. These devices can be checked as described below.
Ionisation electrode (6) Remove electrical connection from the ionisation electrode while the boiler is running, the boiler will go in lockout no.5. The boiler will try to restart. With the electrical connection removed, the restart will result in lockout no. 4. When the connection is already mounted, the restart will be successful. Measuring the ionisation current can be done by mounting a multi-meter (set to µA) in between the ionisation elec- trode and its electrical connection. The ionisation current should always be above 1.2 µA, in normal conditions it will be 6 µA and above.
Water flow temperature sensor (1) Disconnect the plug from the sensor while the boiler is switched on. This should result in a lockout no. 12. The lockout should disappear as soon as the plug is placed back in position, the boiler will restart. Water flow switch (2) Close (slowly!) the valve in the flow connection to the system while the boi- ler is running on minimum load. When the valve is almost closed and the water flow is insufficient, the water flow switch will switch off and the boiler will go in lockout 40. Open the valve. A manual reset is necessary. Minimum gas pressure switch (4) Close the gas cock when the boiler is in standby position (K). Open the test point on the gas valve (3) while meas- uring the gas pressure on the test point of the gas pressure switch (5). The boiler will go in lockout no. 2 when the switch off setting is achieved. Close both test points and open the gas cock.

Gas tightness check Check the gas tightness of all sealed connections with an approved soap or electronic gas analyzer, for example: Test points Bolt connections Gaskets of mixing system, etc.

Boiler shut down When the boiler will not be used for longer periods, shut down the boiler by following procedure: Switch the boiler in standby operation

(K) Switch off the boiler with the on/off
switch (7) Disable power supply to the boiler by
deactivating the mains isolator switch in the boiler room Close the gas supply to the boiler.

Project Boiler type Project Serial number Address Year City Nominal load (Hi) [kW] Date Nominal output (Hi) [kW] Engineer System Water pressure [bar] Installati- on:
Roof top Water pH [-] Ground floor Water hardness [dºH] Basement Water chloride [mg/l] Other: Water ∆T full load [ºC] Low velocity header Water ∆pboiler [kPa] Plated heat exchanger Water flow [m3/h] Bypass boiler Pump setting [-] Other: Safety devices High limit setting [ºC] Water flow sensor checked Temp. limiter setting [ºC] Water flow switch checked Min. gas pressure switch setting [mbar] Ignition time burner [sec] Combustion analysis 100% load 50% load Min. load Gas consumption [m3/h] [m3/h] [m3/h] Gas pressure [mbar] [mbar] [mbar] CO2 pilot burner [%] [%] [%] O2 pilot burner [%] [%] [%] CO pilot burner [ppm] [ppm] [ppm] NOx pilot burner [ppm] [ppm] [ppm]
Hydrau- lics:
CO2 main burner [%] [%] [%] O2 main burner [%] [%] [%] CO main burner [ppm] [ppm] [ppm] NOx main burner [ppm] [ppm] [ppm]
Tatmospheric [ºC] [ºC] [ºC] Tfluegas [ºC] [ºC] [ºC] Twater, flow [ºC] [ºC] [ºC] Twater, return [ºC] [ºC] [ºC] Ionisation current [µA] [µA] [µA] pfan [mbar] [mbar] [mbar] ptop panel [mbar] [mbar] [mbar] pcombustion chamber [mbar] [mbar] [mbar] Parameter settings P1 Setpoint temperature heating [ºC] P12 Boiler hysteresis [ºC] P2 Setpoint temperature DHW [ºC] P17 Fan speed min. load [%] P11 Maximum boiler setpoint [ºC] P19 Fan speed 100% load [%] Remarks

Operating instructions Main menu (operating mode) Parameter menu (information/programming mode) Changing parameter values
The boiler controller has two menus: the main menu (operating mode) when the lid is closed, and the parameter menu (information/programming mode) when the lid is open. Both menus and possibilities are explained in the next paragraphs.
Main menu (operating mode) lid closed With the lid closed and by using the rotational switch (1) clockwise or anticlockwise the boilers’ operating mode (2) can be set. The available modes are: K Standby mode (only frost protection) F Automatic operation mode (heating and DHW) F Summer mode (only DHW, no heating) W1 Service mode minimum load W2 Service mode full load (limited by P9) Besides the operating mode, the display also shows the actual water flow tempera- ture (3) and, in case of a lockout, a warning triangle (4) combined with a lockout code (5). The explanation of the lockout codes can be found in chapter “Lockouts”.

Parameter menu (information/programming mode) lid open With the lid open and by using the rotational switch (1) clockwise or anticlockwise it’s possible to read/change certain values/parameters from the boiler controller. An arrow at the bottom of the display (2) indicates which parameter has been se- lected. The available values/parameters are: P1 Actual / setpoint water flow temperature [ºC] P2 Actual / setpoint DHW temperature [ºC] P3 Actual temperature/capacity setpoint for boiler [ºC]* P4 -- P5 Actual outside temperature [ºC] (if sensor is connected) P6 Actual fluegas temperature [ºC] P7 -- P8 Actual low velocity header temperature [ºC] (if sensor is connected) P9 Actual / Limit boiler output [%] P10 Password for advanced settings

* P3 shows the actual temperature setpoint of the boiler, either coming from P1/P2 or from an additional (weather compensated) controller or building management system (2-10V). When the boiler capacity is controlled via a cascade manager or building management system (2-10V), P3 shows the actual capacity setpoint of the boiler.
Behind the lid you find an optical I/O connection (6), a reset/programming button (7) and an alarm/programming LED (8). Besides the parameter values/ settings, the display also shows additio- nal information with regard to input and output indications to and from the boi- ler:
Input indications H Flame ionisation detected SW Water flow switch active DW Air pressure switch active RT Boiler enabled** Bus Bus communication active
Power to main gas valve Power to ignition transformer Fan control signal Z Power to primary boiler pump F Power to DHW pump/diverter valve
**The boiler enable signal is equipped with a jumper in the standard delivery and therefore the boiler will normally be enabled. If a building management system is connected to provide the enable signal to the boiler (jumper should be removed), check the building management system if the boiler remains disabled.
Changing parameter values For changing any parameters, in the example parameter P2 (DHW setpoint), the following procedure should be car- ried through: Open the lid (the arrow at the bottom
Press the reset/programming button
The new value is now activated. All parameters can be changed by follo- wing the same procedure as described above.
to select (the LED lights up) Turn the rotational switch until the
desired DHW setpoint value has been reached Press the reset/programming button
of the display indicates parameter P1) Turn the rotational switch clockwise
to confirm (the LED goes out) Close the lid.
until the arrow indicates parameter P2

Maintenance of the boiler should be carried out by authorized personnel only. In order to ensure continued good and safe operation of the boiler, it should be inspected at least once per year. A maintenance protocol should be filled out (see end of this chapter for example of maintenance protocol).
Checklist The following activities must be carried out, see following paragraphs for an extensive description of the main activi- ties: Replace the ignition and ionisation
electrodes; Clean the condensate receptacle; Clean and refill the syphon; Check the water pressure of the sys-
tem; Check the water quality of the system
water as well as supply water; Check the water flow rate through the
boiler; Check/correct the combustion values
at full and mimimum load with a com- bustion analyzer; Check the gas pressure to the boiler; Check the tightness of all sealed con-
nections and test points; Check the functionality of all safety
devices; Fill out a maintenance protocol.

Replacing the electrodes The electrodes are positioned on the right hand side of the boiler. Replace the ignition elektrode (1) and ionisation electrodes (2) as shown on the picture.


Cleaning the condensate receptacle Remove the inspection hatch (2) to

access the inside of the condensate receptacle; Clean the receptacle; Mount the inspection hatch.
Water pressure and quality Check if the water pressure and quality meet the requirements. Consult the chapter “commissioning: water and hydraulic system” for more detailed information. Water flow rate Check if the water flow rate through the boiler is within the limits. Consult the chapter “commissioning: check water flow” for more detailed information.
Combustion analysis Check the combustion at full load and minumum load, correct the settings if necessary. An additional reference check at 50% load is recommended. Consult the chapter “commissioning: combustion analysis” for more detailed information. Gas pressure Check the dynamic pressure of the gas supply to the boiler, when the boiler is running at full load. In case of a boiler cascade, all boilers should be running at full load. See technical data for re- quired values.
Combustion analysis Check the combustion at full load and minumum load, correct the settings if necessary. An additional reference check at 50% load is recommended. Consult the chapter “commissioning: combustion analysis” for more detailed information. Gas pressure Check the dynamic pressure of the gas supply to the boiler, when the boiler is running at full load. In case of a boiler cascade, all boilers should be running at full load. See technical data for re- quired values.
Cleaning and refilling the syphon Remove the syphon (3) from the con-
densate connection; Clean and fill it with fresh water; Mount the syphon back in the original
position.

Project Boiler type Project Serial number Address Year City Nominal load (Hi) [kW] Date Nominal output (Hi) [kW] Engineer System Water pressure [bar] Water pH [-] Water hardness [dºH] Water chloride [mg/l] Water ∆T full load [ºC] Water ∆pboiler [kPa] Water flow [m3/h] Pump setting [-] Safety devices High limit setting [ºC] Water flow sensor checked Temp. limiter setting [ºC] Water flow switch checked Min. gas pressure switch setting [mbar] Ignition time burner [sec] Combustion analysis 100% load 50% load Min. load Gas consumption [m3/h] [m3/h] [m3/h] Gas pressure [mbar] [mbar] [mbar] CO2 Pilot burner [%] [%] [%] O2 Pilot burner [%] [%] [%] CO Pilot burner [ppm] [ppm] [ppm] NOx Pilot burner [ppm] [ppm] [ppm]
CO2 Main burner [%] [%] [%] O2 Main burner [%] [%] [%] CO Main burner [ppm] [ppm] [ppm] NOx Main burner [ppm] [ppm] [ppm]
Tatmospheric [ºC] [ºC] [ºC] Tfluegas [ºC] [ºC] [ºC] Twater, flow [ºC] [ºC] [ºC] Twater, return [ºC] [ºC] [ºC] Ionisation current [µA] [µA] [µA] pfan [mbar] [mbar] [mbar] ptop panel [mbar] [mbar] [mbar] pcombustion chamber [mbar] [mbar] [mbar] Parameter settings P1 Setpoint temperature heating [ºC] P12 Boiler hysteresis [ºC] P2 Setpoint temperature DHW [ºC] P17 Fan speed min. load [%] P11 Maximum boiler setpoint [ºC] P19 Fan speed 100% load [%] Remarks

In case of a lockout, a warning triangle (E) and a flashing error code appears on the display. The cause of a fault should first be determined and eliminated before the boiler is being reset. In case the lockout appears more than twice within 6 minutes or maintains for longer than 6 minutes, the error code is added with a “3”. The table below shows all possible lockouts and an indication of possible cause.
No. Error type Explanation Possible solution 1 Lockout Water flow temperature has exceeded the high limit temperature setting (100ºC).
Check if boiler is in automatic mode (K), Check if water flow through the boiler is sufficient, check if (P11+P12) < High limit setting (V9). 2 Interlock Gas pressure has dropped below minimum value of minimum gas pressure switch or additional safety device connected to the interlock input has been interrupted (during startup).
Check gas supply pressure / check function of additio- nal safety device on interlock input.
3 Interlock Gas pressure has dropped below minimum value of minimum gas pressure switch or additional safety device connected to the interlock input has been interrupted (during operation).
Check gas supply pressure / check function of additio- nal safety device on interlock input.
4 Lockout No flame ionisation signal detected during burner start.
Check phase/neutral of power supply (phase sensitivi- ty!), check gas supply, check ignition spark, increase gas valve setting min. load (alan key screw). 5 Lockout Flame ionisation signal lost during operation. Check gas supply pressure during operation, check gas valve setting via combustion analysis. 6 Interlock Water flow temperature has exceeded the tem- perature limiter setting (97ºC).
Check if boiler is in automatic mode (F), check if water flow through the boiler is sufficient, check if (P11+P12) < Temp. limiter setting (V10). 7 Lockout External safety device connected to the lockout input has been interrupted.
Check the external safety devices (water pressure switches, safety thermostat, etc.)
11 Lockout Flame ionisation signal detected before burner start.
Check ionisation electrode, measure ionisation current when boiler is off, check wiring between ionisation electrode and boiler controller. 12 Interlock Water flow temperature sensor is defective. Check resistance of sensor (see chapter “sensor values”), check wiring between water flow temperature sensor and boiler controller. 14 Interlock DHW temperature sensor (optional) is defective. Check resistance of sensor (see chapter “sensor values”), check wiring between DHW temperature sensor and boiler controller. 15 Interlock Outside temperature sensor (optional) is defecti- ve.
Check resistance of sensor (see chapter “sensor values”), check wiring between outside temperature sensor and boiler controller. 18 Interlock Header temperature sensor (optional) is defecti- ve.
Check resistance of sensor (see chapter “sensor values”), check wiring between header temperature sensor and boiler controller.

No. Error type Explanation Possible solution 20 Lockout Error gas valve V1, flame ionisation signal detec- ted longer than 5 seconds after burner stop.
Check closing position of valve V1 within gas combi valve, replace gas valve. 21 Lockout Error gas valve V2, flame ionisation signal detec- ted longer than 5 seconds after burner stop.
Check closing position of valve V2 within gas combi valve, replace gas valve. 22 Lockout APS contact does not close during prepurge. Check setting APS, check if fan is running.
23 Lockout APS contact remains closed when fan is off. Check setting APS
27 Lockout APS contact opens during operation. Check setting APS
30 Lockout CRC error in control system parameters (P11- P40).
Check parameter settings of P11-P40, change value of one parameter within P11-P40 (lockout disappears), change all parameters back to original settings. 31 Lockout CRC error in boiler safety parameters (V1-V16). Check parameter settings of V1-V16, change value of one parameter within V1-V16 (lockout disappears), change all parameters back to original settings. 32 Interlock Power supply voltage to boiler controller is too low.
Check fuse of boiler controller, check power supply to boiler controller. 40 Lockout Water flow switch has been interrupted when pump being enabled.
Check pump operation, check water flow through the boiler, check functionality of water flow switch. x.y. Lockout (all lockout codes which are not listed above) Internal lockout of boiler controller.
Press reset. Change boiler controller when lockout can not be reset or occurs more frequently.


The diagrams show the sensor values for all boiler sensors and optional sen- sors available in accessory kits. The diagrams contain average values, as all sensors are liable to tolerances.
Water flow and fluegas temperature sensor (5kΩ NTC)
When measuring the resistance values, the boiler should always be switched off. Measure close to the sensor, in order to avoid value deviations.
DHW, outside and header temperature sensor (1kΩ PTC)

Declaration of Conformity
declares that the products
R3400/3500/3600
are in conformity with the following standards:
EN 656 EN 15417 EN 13836 EN 55014-1 / -2 EN 61000-3-2 /-3
and in accordance with the guidelines of directives:
92 / 42 / EEC (boiler efficiency directive) 90 / 396 / EEC (gas appliance directive) 73 / 23 / EEC (low voltage directive) 89 / 336 / EEC (EMC directive) These products are designated with CE nr.:






Eigenaren en ons team reageren doorgaans binnen een dag — en uw vraag helpt ook de volgende persoon.
Stel als eerste een vraag — andere eigenaren of ons team geven antwoord.